Engineered Systems - September 2008 - (Page 67) structure was not designed to support the required HVAC equipment, so an internal equipment mezzanine that extended up through the roof was constructed. The new “superstructure,” as it was affectionately called, supports the boiler room, two 100% OA central air handlers, electrical distribution gear, transformers, and all the VFDs for both the air handlers and exhaust fans. In addition, the roof portion houses two Strobic Air Tri-Stack™ exhaust fans mounted on a structural plenum, a general exhaust utility set fan, and six environmental room condensing units with space left on the roof platform for future exhaust fans and/or other equipment. Because vibration isolation was a key consideration for the air handlers and the exhaust fans, in order to limit the noise and vibration transmittance into the occupied lab spaces below, vibration isolators and sound attenuators were attached to all units. LABORATORY CONTROLS In addition to acoustical considerations, climate and IAQ for the laboratory area were key as well. As such, VAV Phoenix Laboratory valves and controls were utilized to maintain space temperature and pressurization. The system modulates down from design airflow to minimum required ach while maintaining a predetermined volumetric offset between the supply and exhaust to maintain room pressurization. Furthermore, minimum face velocity requirements are maintained for numerous fume hoods located throughout the labs. In the interest of saving energy, dual-pull occupancy sensors in every room control both the lighting and HVAC system. As for the latter, a special sequence of operations was written to enable the system to operate in occupied and unoccupied modes. When unoccupied, overall ventilation can be decreased by more than 40%, with the fume hood face velocity decreasing from 100 to 60 fpm. The system’s emergency mode enables all the air valves to close to their minimum position, but still maintain a negative pressure in all the labs for safe occupant egress in the event of an emergency. The controls were also tested and balanced in their emergency mode to ensure that proper door forces will be maintained. The laboratory control system ties into an existing Siemens BMS, via a gateway, allowing facility personnel to operate the laboratory controls from anywhere on their campus-wide network. FIGURE 1. Internal equipment mezzanine showing AHUs. (Photo ©2008 Brady Architectural Photography.) on the ambient conditions. Although a unique setup, the pit turned out to be a great location in terms of security, distance from delivery truck routes, and noise control. In addition to the existing storm water sump pit, an extra condensate sump pit, complete with a duplex pumping system and controls, was installed for chiller condensate removal. As a result, there is sufficient space remaining in the pit for two more chillers and one standby generator if needed in the future. EXISTING CONDITIONS Yet another space challenge was dealing with the warehouse’s high bay area, which meant more than 15 ft of ceiling space. While the other extreme involved trying to design laboratory space underneath a pre-existing second story mezzanine with less than 18 in. of ceiling space to work with. Although 15 ft of ceiling space sounds like a designer’s dream, when one is dealing with hanging ductwork and pipes in a large, open space under California’s strict seismic requirements, it is no picnic. Fortunately, 3-D modeling lent much assistance to the process of identifying hangar locations, seismic bracing, and clash detection. The modeling process enabled the design team to keep main ductwork and piping as high as possible, limiting the seismic bracing requirements, while keeping branch ductwork and piping low to maintain accessibility to important system components such as supply and exhaust valves, piping isolation valves, and electrical pull boxes. As for the lab’s tight ceiling space, again 3-D modeling was used to coordinate duct crossings, utility drop points, valve accessibility and, of course, fire sprinkler piping and head locations. With less than 18 in. of ceiling space, every inch counted. Duct sizing and routing played an important role in getting all the required services to fit inside such a tight space. Still another structural limitation was the fact that the existing roof FIGURE 2. Lab underneath first floor mezzanine. (Photo ©2008 Brady Architectural Photography.) w w w. esmag a zin e. c o m 67 http://www.esmagazine.com
Table of Contents Feed for the Digital Edition of Engineered Systems - September 2008 Engineered Systems - September 2008 Contents Editor's Note HVAC Challenge Back2Basics Case In Point Commissioning Building Automation HVACR Designer Tips Application Checklist LEED®, Or Get (It) Out Of The Way? BACnet Supplement Race To Market Steam Humidification In Pharmaceutical Facilities Outside Air, Inside Data Centers Forecast: Increasingly Cloudy And Under Control Products Computers & Software Literature Glossary Classifieds Advertiser Index Tomorrow's Environment Engineered Systems - September 2008 Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page Cover1) Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page Cover2) Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page 3) Engineered Systems - September 2008 - Contents (Page 4) Engineered Systems - September 2008 - Contents (Page 5) Engineered Systems - September 2008 - Contents (Page 6) Engineered Systems - September 2008 - Contents (Page 7) Engineered Systems - September 2008 - Editor's Note (Page 8) Engineered Systems - September 2008 - Editor's Note (Page 9) Engineered Systems - September 2008 - HVAC Challenge (Page 10) Engineered Systems - September 2008 - HVAC Challenge (Page 11) Engineered Systems - September 2008 - Back2Basics (Page 12) Engineered Systems - September 2008 - Back2Basics (Page 13) Engineered Systems - September 2008 - Case In Point (Page 14) Engineered Systems - September 2008 - Case In Point (Page 15) Engineered Systems - September 2008 - Case In Point (Page 16) Engineered Systems - September 2008 - Case In Point (Page 17) Engineered Systems - September 2008 - Case In Point (Page 18) Engineered Systems - September 2008 - Case In Point (Page 19) Engineered Systems - September 2008 - Case In Point (Page 20) Engineered Systems - September 2008 - Case In Point (Page 21) Engineered Systems - September 2008 - Case In Point (Page 22) Engineered Systems - September 2008 - Case In Point (Page 23) Engineered Systems - September 2008 - Case In Point (Page 24) Engineered Systems - September 2008 - Case In Point (Page 25) Engineered Systems - September 2008 - Case In Point (Page 26) Engineered Systems - September 2008 - Case In Point (Page 27) Engineered Systems - September 2008 - Commissioning (Page 28) Engineered Systems - September 2008 - Commissioning (Page 29) Engineered Systems - September 2008 - Building Automation (Page 30) Engineered Systems - September 2008 - Building Automation (Page 31) Engineered Systems - September 2008 - HVACR Designer Tips (Page 32) Engineered Systems - September 2008 - HVACR Designer Tips (Page 33) Engineered Systems - September 2008 - Application Checklist (Page 34) Engineered Systems - September 2008 - Application Checklist (Page 35) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 36) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 37) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 38) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 39) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 40) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 41) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 42) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 43) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 44) Engineered Systems - September 2008 - BACnet Supplement (Page 1B) Engineered Systems - September 2008 - BACnet Supplement (Page 2B) Engineered Systems - September 2008 - BACnet Supplement (Page 3B) Engineered Systems - September 2008 - BACnet Supplement (Page 4B) Engineered Systems - September 2008 - BACnet Supplement (Page 5B) Engineered Systems - September 2008 - BACnet Supplement (Page 6B) Engineered Systems - September 2008 - BACnet Supplement (Page 7B) Engineered Systems - September 2008 - BACnet Supplement (Page 8B) Engineered Systems - September 2008 - BACnet Supplement (Page 9B) Engineered Systems - September 2008 - BACnet Supplement (Page 10B) Engineered Systems - September 2008 - BACnet Supplement (Page 11B) Engineered Systems - September 2008 - BACnet Supplement (Page 12B) Engineered Systems - September 2008 - BACnet Supplement (Page 13B) Engineered Systems - September 2008 - BACnet Supplement (Page 14B) Engineered Systems - September 2008 - BACnet Supplement (Page 15B) Engineered Systems - September 2008 - BACnet Supplement (Page 16B) Engineered Systems - September 2008 - BACnet Supplement (Page 17B) Engineered Systems - September 2008 - BACnet Supplement (Page 18B) Engineered Systems - September 2008 - BACnet Supplement (Page 19B) Engineered Systems - September 2008 - BACnet Supplement (Page 20B) Engineered Systems - September 2008 - BACnet Supplement (Page 21B) Engineered Systems - September 2008 - Race To Market (Page 66) Engineered Systems - September 2008 - Race To Market (Page 67) Engineered Systems - September 2008 - Race To Market (Page 68) Engineered Systems - September 2008 - Race To Market (Page 69) Engineered Systems - September 2008 - Race To Market (Page 70) Engineered Systems - September 2008 - Race To Market (Page 71) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 72) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 73) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 74) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 75) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 76) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 77) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 78) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 79) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 80) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 81) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 82) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 83) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 84) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 85) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 86) Engineered Systems - September 2008 - Products (Page 87) Engineered Systems - September 2008 - Products (Page 88) Engineered Systems - September 2008 - Products (Page 89) Engineered Systems - September 2008 - Computers & Software (Page 90) Engineered Systems - September 2008 - Literature (Page 91) Engineered Systems - September 2008 - Glossary (Page 92) Engineered Systems - September 2008 - Classifieds (Page 93) Engineered Systems - September 2008 - Classifieds (Page 94) Engineered Systems - September 2008 - Classifieds (Page 95) Engineered Systems - September 2008 - Classifieds (Page 96) Engineered Systems - September 2008 - Advertiser Index (Page 97) Engineered Systems - September 2008 - Tomorrow's Environment (Page 98) Engineered Systems - September 2008 - Tomorrow's Environment (Page Cover3) Engineered Systems - September 2008 - Tomorrow's Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.