Engineered Systems - October 2008 - (Page 11) Letters Responsible design: some nice ideas, done wrong I listened to the “Responsible Design & Construction Process in the 21st Century” webinar (available at www.esmagazine.com), and had some comments. First, I applaud Mr. McKew’s and Ms. Maston’s advocacy of an integrated design approach and the early definition of owner’s project requirements (OPR), basis of design (BofD), FTP, and the use of energy and system modeling software in the building design process (I’m not referring to process plant or infrastructure systems design, which usually have different processes). These are truly needed — as well as a more integrated and comprehensive role for the building mechanical and electrical system designers. cies are coming around to acceptance of D-B, but it’s a slow and difficult process. 2. Second, the re-definition of the design process as shown is not only naive and over-simplified, but wrong. The coupling of the “Architectural” portion of building design with “System Selection” and “Energy Modeling” and its designation as “Architectural Bubble Diagrams,” is a grossly misleading statement of the process. The “Schematic Design” and “Design Development” phases have progressed and continued over many generations in order to recognize the gradual and reiterative decision making that go into the design of a building. Energy modeling today has to consider options of building orientation, insulation, material reflective properties, window patterns, operable shading devices, electric lighting configurations and controls, and equipment space requirements and cost (central plant, fan rooms, rooftop), as well as HVAC system design options. These happen in a reiterative process through SD and DD phases — not in jumping from “System Selection” and “Architectural Bubble Diagrams” directly to “Project Documents” (that “phase” is simply the documentation of the many design decisions made in the earlier stages). 3. As a mechanical engineer first and an architect subsequently, I strongly support the idea of a more important and substantive role of the building systems design engineers (mechanical, electrical, lighting, control, and communications systems, etc.). Owners should be as scrupulous about their selection as they are about the architects’ selection. 4. And for their stronger role, and for their efforts in early simulation and energy modeling (together with the work of the architect, structural and site engineers), each of the members of the professional design team should be more highly compensated. The increase in design fees will be more than offset by decreases in construction cost. These same thoughts apply to the construction oversight, submittal review, substitution approval, commissioning, training, and O&M manual preparation tasks, as well. Most owners, however, are just not aware of all this. They need to be educated. 5. The goals you are trying to achieve with this “mechanical-engineer centrist” The goals you are trying to achieve with this “mechanical-engineer centrist” model of the design process would be better achieved by relating the actual design and construction work objectives to the established processes of design and construction as they exist and are practiced — not by proposing a radical and unrealistic revision of the process. — John C. Rollow, AIA, CHPS Glendale, CA However, the advocacy of an upheaval change in the contractual performance process and fee apportionment, together with an insistence on a D-B building procurement process, is naive and irresponsible. 1. First, most buildings in this country are procured by D-B-B process (sometimes with multiple-prime building contracts and construction managers (CMs) but still D-B), especially for federal, state, and local government agencies. Some agen- No Problem… Input 217A at www.esmagazine.com/instantproductinfo w w w. esmag a zine . c o m ESM10084SSAd2.indd 1 11 9/15/08 11:59:05 AM http://www.esmagazine.com http://www.esmagazine.com/instantproductinfo http://www.esmagazine.com
Table of Contents Feed for the Digital Edition of Engineered Systems - October 2008 Engineered Systems - October 2008 Contents Editor’s Note Letters Back2Basics HVAC Challenge Case in Point Commissioning Building Automation HydroTech HVACR Designer Tips Special Insert: Engineer's Technical Library Fall 2008 Living Wild! Chilled Beams in Chicago Phoenix Convention Center: On The Rise Cold-Climate HVAC Challenges Humidification Strategies For Data Centers & Network Rooms Special Advertising Supplement: Tabb Talk Computers & Software Issues & Events Products Literature & Catalogs Glossary Classifieds Advertiser Index Tomorrow’s Environment Engineered Systems - October 2008 Engineered Systems - October 2008 - Engineered Systems - October 2008 (Page Cover1) Engineered Systems - October 2008 - Engineered Systems - October 2008 (Page Cover2) Engineered Systems - October 2008 - Contents (Page 3) Engineered Systems - October 2008 - Contents (Page 4) Engineered Systems - October 2008 - Contents (Page 5) Engineered Systems - October 2008 - Editor’s Note (Page 6) Engineered Systems - October 2008 - Editor’s Note (Page 7) Engineered Systems - October 2008 - Letters (Page 8) Engineered Systems - October 2008 - Letters (Page 9) Engineered Systems - October 2008 - Letters (Page 10) Engineered Systems - October 2008 - Letters (Page 11) Engineered Systems - October 2008 - Letters (Page 12) Engineered Systems - October 2008 - Letters (Page 13) Engineered Systems - October 2008 - Back2Basics (Page 14) Engineered Systems - October 2008 - Back2Basics (Page 15) Engineered Systems - October 2008 - HVAC Challenge (Page 16) Engineered Systems - October 2008 - HVAC Challenge (Page 17) Engineered Systems - October 2008 - Case in Point (Page 18) Engineered Systems - October 2008 - Case in Point (Page 19) Engineered Systems - October 2008 - Case in Point (Page 20) Engineered Systems - October 2008 - Case in Point (Page 21) Engineered Systems - October 2008 - Case in Point (Page 22) Engineered Systems - October 2008 - Case in Point (Page 23) Engineered Systems - October 2008 - Case in Point (Page 24) Engineered Systems - October 2008 - Case in Point (Page 25) Engineered Systems - October 2008 - Case in Point (Page 26) Engineered Systems - October 2008 - Case in Point (Page 27) Engineered Systems - October 2008 - Commissioning (Page 28) Engineered Systems - October 2008 - Commissioning (Page 29) Engineered Systems - October 2008 - Building Automation (Page 30) Engineered Systems - October 2008 - Building Automation (Page 31) Engineered Systems - October 2008 - HydroTech (Page 32) Engineered Systems - October 2008 - HydroTech (Page 33) Engineered Systems - October 2008 - HVACR Designer Tips (Page 34) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL1) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL2) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL3) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL4) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL5) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL6) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL7) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL8) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL9) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL10) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL11) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL12) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page 35) Engineered Systems - October 2008 - Living Wild! (Page 36) Engineered Systems - October 2008 - Living Wild! (Page 37) Engineered Systems - October 2008 - Living Wild! (Page 38) Engineered Systems - October 2008 - Living Wild! (Page 39) Engineered Systems - October 2008 - Living Wild! (Page 40) Engineered Systems - October 2008 - Living Wild! (Page 41) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 42) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 43) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 44) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 45) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 46) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 47) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 48) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 49) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 50) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 51) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 52) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 53) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 54) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 55) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 56) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 57) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 58) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 59) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 60) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 61) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 62) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 63) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 64) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 65) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 66) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT1) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT2) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT3) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT4) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT5) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT6) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT7) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT8) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT9) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT10) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT11) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT12) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT13) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT14) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT15) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT16) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page 67) Engineered Systems - October 2008 - Computers & Software (Page 68) Engineered Systems - October 2008 - Computers & Software (Page 69) Engineered Systems - October 2008 - Issues & Events (Page 70) Engineered Systems - October 2008 - Issues & Events (Page 71) Engineered Systems - October 2008 - Issues & Events (Page 72) Engineered Systems - October 2008 - Issues & Events (Page 73) Engineered Systems - October 2008 - Products (Page 74) Engineered Systems - October 2008 - Products (Page 75) Engineered Systems - October 2008 - Products (Page 76) Engineered Systems - October 2008 - Products (Page 77) Engineered Systems - October 2008 - Literature & Catalogs (Page 78) Engineered Systems - October 2008 - Literature & Catalogs (Page 79) Engineered Systems - October 2008 - Literature & Catalogs (Page 80) Engineered Systems - October 2008 - Glossary (Page 81) Engineered Systems - October 2008 - Classifieds (Page 82) Engineered Systems - October 2008 - Classifieds (Page 83) Engineered Systems - October 2008 - Classifieds (Page 84) Engineered Systems - October 2008 - Advertiser Index (Page 85) Engineered Systems - October 2008 - Tomorrow’s Environment (Page 86) Engineered Systems - October 2008 - Tomorrow’s Environment (Page Cover3) Engineered Systems - October 2008 - Tomorrow’s Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.