Engineered Systems - October 2008 - (Page 18) CaseInPoint Flexible VAV systems prove the right fit for NYC space demands With the rising price of real estate in New York City, even older buildings have great income potential for commercial applications. That’s the feeling of Jack Resnick & Sons, the owner of 250 Hudson Street, an older commercial building located near the entrance of the Holland Tunnel. Jack Resnick & Sons is a New York-based real estate investor with primary holdings in New York City. The company is a builder and manager of more than six million square feet of commercial space stretching the continent from New York City to San Francisco. The Hudson street property is a 15-story high-rise constructed in 1931. Its address in mid-town Manhattan makes it an ideal location for corporate headquarters and general office space. But like many properties of its era, it was in need of cosmetic and mechanical upgrades to attract and maintain long-term tenants. VAV AS THE WAY TO GO As part of the $20 million capital improvement program, design engineers opted for VAV DX systems on each floor for ease of fitout and better control of utility billing. With each floor measuring approximately 26,000 sq ft, an estimated 80 tons of cooling per level would be required to maintain optimum temperature control. United CoolAir Corporation was selected as the supplier of the VAV systems that were sold through MWSK Equipment Corp, United CoolAir’s rep agency in the New York City metropolitan area “While many of the older buildings are quite large in their design, they were not constructed to accommodate new equipment change-out”, said Rod Beever, vice president of sales and marketing for United CoolAir Corporation. “This is an area where United CoolAir excels because we build our air conditioning equipment for just these kinds of difficult installations.” Twenty-four 40-ton VariCool™ VAV units were specified, each with mechanically cleanable waterside economizers for reduced operating costs. They selected the VariCool™ units because the application required custom unit modification as well as a fast turnaround. CUSTOMIZATION AND A QUICK LEAD TIME MWSK Equipment Corp maintains offices in Manhattan and Long Island. They are no stranger to tough, retrofit projects, having developed quite a reputation for dependability in the city and surrounding areas. “This project had many challenges on cost and turn-around,” said Bill Kerrane, president of MWSK Equipment. “But despite the customization required for each unit, United CoolAir was able to provide a lead-time of less than 10 weeks, seven weeks sooner than other manufacturers under consideration.” United CoolAir Chief Engineer, Athar Khan, was heavily involved throughout the project from the very beginning. “It was a critical factor to work directly with the project’s consulting engineers and contractors to understand the project’s dynamics”, said Khan. “We were able to customize the units exactly as needed to eliminate time delays during installation.” Getting 40 tons of cooling in an older property is a challenge at best, and this is further complicated when the mechanical spaces have barely enough room for the units themselves. The inherent flexible design of the VariCool™ meant they could be easily modi18 En gi neer ed S y stem s October 2008 The VAV DX systems in this New York high rise help rein in utility bills while maintaining optimum temperature control. fied to adapt to the building’s space limitations saving on installation time and building modification. United CoolAir fabricated the units as a mirror image for left and right hand access, with sets of two units for each floor space. Victaulic couplings on the water lines made this portion of the installation quick and simple, providing additional benefits for the contractor and owner. Quiet operation was also key consideration because of the unit’s close proximity to the office space. Prior to the sale, MWSK acquired third-party verification that the United CoolAir units would be quieter than other VAV systems based on the same cfm and ESP capability. Each unit was equipped with a single power supply using a factoryinstalled, through-panel, non-fused disconnect. In the unlikely event of a VFD failure, the units also incorporated three-contactor bypass switches allowing manual operation of the blower. The controls package included factory-mounted, fully integrated Marvel Plus™ microprocessors that allowed each unit to be integrated with the BMS. The units arrived fully charged from the factory and in modular sections so they could be easily moved into the building. Quick-connect fittings eliminated field brazing by the contractor along with evacuation and charging of the refrigeration system. Time savings were estimated at several days of field labor for each unit, along with the added reliability of leak-free operation through factory-brazed joints. All aspects of the installation worked as planned, and the VariCool™ units lived up to their reputation for flexibility and ease of installation. But despite all the pre-planning, minor issues still cropped up once the units were installed, such as that of limited access door opening space. United CoolAir quickly designed “accordion” doors to open in the restricted mechanical rooms, and these were provided without delays to the commissioning date.
Table of Contents Feed for the Digital Edition of Engineered Systems - October 2008 Engineered Systems - October 2008 Contents Editor’s Note Letters Back2Basics HVAC Challenge Case in Point Commissioning Building Automation HydroTech HVACR Designer Tips Special Insert: Engineer's Technical Library Fall 2008 Living Wild! Chilled Beams in Chicago Phoenix Convention Center: On The Rise Cold-Climate HVAC Challenges Humidification Strategies For Data Centers & Network Rooms Special Advertising Supplement: Tabb Talk Computers & Software Issues & Events Products Literature & Catalogs Glossary Classifieds Advertiser Index Tomorrow’s Environment Engineered Systems - October 2008 Engineered Systems - October 2008 - Engineered Systems - October 2008 (Page Cover1) Engineered Systems - October 2008 - Engineered Systems - October 2008 (Page Cover2) Engineered Systems - October 2008 - Contents (Page 3) Engineered Systems - October 2008 - Contents (Page 4) Engineered Systems - October 2008 - Contents (Page 5) Engineered Systems - October 2008 - Editor’s Note (Page 6) Engineered Systems - October 2008 - Editor’s Note (Page 7) Engineered Systems - October 2008 - Letters (Page 8) Engineered Systems - October 2008 - Letters (Page 9) Engineered Systems - October 2008 - Letters (Page 10) Engineered Systems - October 2008 - Letters (Page 11) Engineered Systems - October 2008 - Letters (Page 12) Engineered Systems - October 2008 - Letters (Page 13) Engineered Systems - October 2008 - Back2Basics (Page 14) Engineered Systems - October 2008 - Back2Basics (Page 15) Engineered Systems - October 2008 - HVAC Challenge (Page 16) Engineered Systems - October 2008 - HVAC Challenge (Page 17) Engineered Systems - October 2008 - Case in Point (Page 18) Engineered Systems - October 2008 - Case in Point (Page 19) Engineered Systems - October 2008 - Case in Point (Page 20) Engineered Systems - October 2008 - Case in Point (Page 21) Engineered Systems - October 2008 - Case in Point (Page 22) Engineered Systems - October 2008 - Case in Point (Page 23) Engineered Systems - October 2008 - Case in Point (Page 24) Engineered Systems - October 2008 - Case in Point (Page 25) Engineered Systems - October 2008 - Case in Point (Page 26) Engineered Systems - October 2008 - Case in Point (Page 27) Engineered Systems - October 2008 - Commissioning (Page 28) Engineered Systems - October 2008 - Commissioning (Page 29) Engineered Systems - October 2008 - Building Automation (Page 30) Engineered Systems - October 2008 - Building Automation (Page 31) Engineered Systems - October 2008 - HydroTech (Page 32) Engineered Systems - October 2008 - HydroTech (Page 33) Engineered Systems - October 2008 - HVACR Designer Tips (Page 34) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL1) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL2) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL3) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL4) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL5) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL6) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL7) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL8) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL9) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL10) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL11) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL12) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page 35) Engineered Systems - October 2008 - Living Wild! (Page 36) Engineered Systems - October 2008 - Living Wild! (Page 37) Engineered Systems - October 2008 - Living Wild! (Page 38) Engineered Systems - October 2008 - Living Wild! (Page 39) Engineered Systems - October 2008 - Living Wild! (Page 40) Engineered Systems - October 2008 - Living Wild! (Page 41) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 42) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 43) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 44) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 45) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 46) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 47) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 48) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 49) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 50) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 51) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 52) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 53) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 54) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 55) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 56) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 57) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 58) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 59) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 60) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 61) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 62) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 63) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 64) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 65) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 66) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT1) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT2) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT3) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT4) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT5) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT6) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT7) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT8) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT9) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT10) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT11) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT12) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT13) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT14) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT15) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT16) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page 67) Engineered Systems - October 2008 - Computers & Software (Page 68) Engineered Systems - October 2008 - Computers & Software (Page 69) Engineered Systems - October 2008 - Issues & Events (Page 70) Engineered Systems - October 2008 - Issues & Events (Page 71) Engineered Systems - October 2008 - Issues & Events (Page 72) Engineered Systems - October 2008 - Issues & Events (Page 73) Engineered Systems - October 2008 - Products (Page 74) Engineered Systems - October 2008 - Products (Page 75) Engineered Systems - October 2008 - Products (Page 76) Engineered Systems - October 2008 - Products (Page 77) Engineered Systems - October 2008 - Literature & Catalogs (Page 78) Engineered Systems - October 2008 - Literature & Catalogs (Page 79) Engineered Systems - October 2008 - Literature & Catalogs (Page 80) Engineered Systems - October 2008 - Glossary (Page 81) Engineered Systems - October 2008 - Classifieds (Page 82) Engineered Systems - October 2008 - Classifieds (Page 83) Engineered Systems - October 2008 - Classifieds (Page 84) Engineered Systems - October 2008 - Advertiser Index (Page 85) Engineered Systems - October 2008 - Tomorrow’s Environment (Page 86) Engineered Systems - October 2008 - Tomorrow’s Environment (Page Cover3) Engineered Systems - October 2008 - Tomorrow’s Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.