Engineered Systems - October 2008 - (Page 34) HVACRDesignerTips BY AMANDA MCKEW DESIGN REVIEW / DESIGN-BUILD Hotels, Motels, and Dormitories Equipment type: Energy recovery unit Equipment designation: ERU-1 Barcode designation: 111111 Area served: Dormitory rooms Equipment location: In equipment room • Can the fancoils, boiler, energy recovery and rooftop unit, pumps, and air cooled chiller be installed without removing other HVAC, electrical, plumbing, communication, and/or fire protection distribution or equipment? ❍ ❍ • Has consideration been given to future expansion of system? ❍ ❍ • Has pressure testing of pipe distribution been determined in scope of work? ❍ ❍ ❍ • Has system flushing been determined in scope of work? ❍ • Has condensate drain piping be addressed? ❍ ❍ • Has ERU-1 freeze-stat protection been considered? ❍ ❍ • Has consideration been given to the manufacturer’s recommended clearance around equipment ❍ ❍ for service? DESIGN REVIEW [Y] [N] ❍ ❍ ❍ unit ❍ unit ❍ • Verify adequate ventilation. ❍ • Spot-check air quantity by cfm/sq ft. ❍ • Spot-check heating capacity based on Btuh/sq ft. ❍ • Review control drawings and specifications and confirm inlet and outlet temperature setpoints are specified. ❍ • Review control drawings and specifications and confirm inlet and outlet humidity setpoints are specified. ❍ • Review control drawings and specifications and confirm unit drybulb and wetbulb temperature high/low alarm limits are specified. ❍ • Review control drawings and specifications and confirm alarm sequences are specified. ❍ • Review control drawings and specifications to determine if will operate completely through the BAS/BMS. ❍ • Check for potential short-circuiting of outdoor air with exhaust air at unit. ❍ ❍ ❍ unit ❍ ❍ GENERAL CONDITIONS CONSIDERATIONS / REQUIREMENTS [Y] [N] ❍ ❍ ❍ • Have the necessary installation and operating permits been acquired? ❍ • Have the insurance certificates been submitted to building owner? ❍ • Will there be an extended warranty on the equipment? ❍ DESIGN REVIEW AND TRICKS OF THE TRADE ELECTRICAL INSPECTION / REQUIREMENTS [Y] [N] • What are the new electrical requirements for the new ERU, RTU-1, etc.? ❍ • Is there adequate electrical power to meet new electrical load from the new equipment? ❍ • Is there adequate electrical power coming in from the street? ❍ • Identify electrical scope of work required with HVAC equipment. ❍ • Will emergency power be a requirement for the building major mechanical systems? ❍ • Are electrical connections tight and secure? ❍ • Have the fuses/circuit and wire sizes been checked and verified? ❍ • What electrical system components (existing conduits, etc.) will require removal, reinstallation, and/or relocation to accommodate new HVAC units? ❍ • Are there existing electrical code issues that should be address at this time? ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ • Create an airflow diagram indicating cfm, pressure drops, and velocities for design, TAB, commissioning, and record documents for future retrofit needs. • Consider routine maintenance can be achieved without shutting unit down. • Attach equipment schedule and design criteria to checklist. • Attach sequence of operation to checklist. REFERENCE • 2008 ASHRAE Handbook – HVAC Systems and Equipment, Chapter 1, “System Analysis and Selection,” and Chapter 5, “In Room Terminal Systems.” • 2007 ASHRAE Handbook – Applications, Chapter 5 “Hotels, Motels and Dormitories.” • 2005 ASHRAE Handbook – Fundamentals, Chapter 35, “Duct Design,” and Chapter 36, ”Pipe Sizing.” ❍ ❍ NOTE • Refer to equipment manufacturers’ literature for additional data and requirements. • Refer to building owner standards and guidelines for additional criteria. ES If you have any comments, suggestions, or questions regarding this designer checklist, contact Amanda McKew at amckew@ rdkengineers.com. HVAC INSPECTION / REQUIREMENTS • Has the selection of fancoils, boiler, energy recovery and rooftop unit, pumps, and air cooled chiller been approved and signed off by owner? • Has the minimum gas pressure been determined for the heating? • Verify that gas piping is complete and correct. • Can the HVAC equipment be installed with access for maintenance? [Y] [N] ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ 34 En gi neer ed S y stem s October 2008
Table of Contents Feed for the Digital Edition of Engineered Systems - October 2008 Engineered Systems - October 2008 Contents Editor’s Note Letters Back2Basics HVAC Challenge Case in Point Commissioning Building Automation HydroTech HVACR Designer Tips Special Insert: Engineer's Technical Library Fall 2008 Living Wild! Chilled Beams in Chicago Phoenix Convention Center: On The Rise Cold-Climate HVAC Challenges Humidification Strategies For Data Centers & Network Rooms Special Advertising Supplement: Tabb Talk Computers & Software Issues & Events Products Literature & Catalogs Glossary Classifieds Advertiser Index Tomorrow’s Environment Engineered Systems - October 2008 Engineered Systems - October 2008 - Engineered Systems - October 2008 (Page Cover1) Engineered Systems - October 2008 - Engineered Systems - October 2008 (Page Cover2) Engineered Systems - October 2008 - Contents (Page 3) Engineered Systems - October 2008 - Contents (Page 4) Engineered Systems - October 2008 - Contents (Page 5) Engineered Systems - October 2008 - Editor’s Note (Page 6) Engineered Systems - October 2008 - Editor’s Note (Page 7) Engineered Systems - October 2008 - Letters (Page 8) Engineered Systems - October 2008 - Letters (Page 9) Engineered Systems - October 2008 - Letters (Page 10) Engineered Systems - October 2008 - Letters (Page 11) Engineered Systems - October 2008 - Letters (Page 12) Engineered Systems - October 2008 - Letters (Page 13) Engineered Systems - October 2008 - Back2Basics (Page 14) Engineered Systems - October 2008 - Back2Basics (Page 15) Engineered Systems - October 2008 - HVAC Challenge (Page 16) Engineered Systems - October 2008 - HVAC Challenge (Page 17) Engineered Systems - October 2008 - Case in Point (Page 18) Engineered Systems - October 2008 - Case in Point (Page 19) Engineered Systems - October 2008 - Case in Point (Page 20) Engineered Systems - October 2008 - Case in Point (Page 21) Engineered Systems - October 2008 - Case in Point (Page 22) Engineered Systems - October 2008 - Case in Point (Page 23) Engineered Systems - October 2008 - Case in Point (Page 24) Engineered Systems - October 2008 - Case in Point (Page 25) Engineered Systems - October 2008 - Case in Point (Page 26) Engineered Systems - October 2008 - Case in Point (Page 27) Engineered Systems - October 2008 - Commissioning (Page 28) Engineered Systems - October 2008 - Commissioning (Page 29) Engineered Systems - October 2008 - Building Automation (Page 30) Engineered Systems - October 2008 - Building Automation (Page 31) Engineered Systems - October 2008 - HydroTech (Page 32) Engineered Systems - October 2008 - HydroTech (Page 33) Engineered Systems - October 2008 - HVACR Designer Tips (Page 34) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL1) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL2) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL3) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL4) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL5) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL6) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL7) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL8) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL9) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL10) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL11) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL12) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page 35) Engineered Systems - October 2008 - Living Wild! (Page 36) Engineered Systems - October 2008 - Living Wild! (Page 37) Engineered Systems - October 2008 - Living Wild! (Page 38) Engineered Systems - October 2008 - Living Wild! (Page 39) Engineered Systems - October 2008 - Living Wild! (Page 40) Engineered Systems - October 2008 - Living Wild! (Page 41) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 42) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 43) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 44) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 45) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 46) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 47) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 48) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 49) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 50) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 51) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 52) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 53) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 54) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 55) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 56) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 57) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 58) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 59) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 60) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 61) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 62) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 63) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 64) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 65) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 66) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT1) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT2) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT3) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT4) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT5) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT6) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT7) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT8) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT9) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT10) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT11) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT12) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT13) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT14) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT15) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT16) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page 67) Engineered Systems - October 2008 - Computers & Software (Page 68) Engineered Systems - October 2008 - Computers & Software (Page 69) Engineered Systems - October 2008 - Issues & Events (Page 70) Engineered Systems - October 2008 - Issues & Events (Page 71) Engineered Systems - October 2008 - Issues & Events (Page 72) Engineered Systems - October 2008 - Issues & Events (Page 73) Engineered Systems - October 2008 - Products (Page 74) Engineered Systems - October 2008 - Products (Page 75) Engineered Systems - October 2008 - Products (Page 76) Engineered Systems - October 2008 - Products (Page 77) Engineered Systems - October 2008 - Literature & Catalogs (Page 78) Engineered Systems - October 2008 - Literature & Catalogs (Page 79) Engineered Systems - October 2008 - Literature & Catalogs (Page 80) Engineered Systems - October 2008 - Glossary (Page 81) Engineered Systems - October 2008 - Classifieds (Page 82) Engineered Systems - October 2008 - Classifieds (Page 83) Engineered Systems - October 2008 - Classifieds (Page 84) Engineered Systems - October 2008 - Advertiser Index (Page 85) Engineered Systems - October 2008 - Tomorrow’s Environment (Page 86) Engineered Systems - October 2008 - Tomorrow’s Environment (Page Cover3) Engineered Systems - October 2008 - Tomorrow’s Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.