Engineered Systems - October 2008 - (Page 54) Cold Climate HVAC Challenges the perimeter can prevent difficult to remediate drafts, which can overcool surfaces. It is these cracks that lead most often to frost or ice formation. Better controls or zoning on the humidification system may also be necessary to prevent over dispersion of moisture. On one project, a separate control zone for the exterior envelope was designed. This zone supplied non-humidified, independent temperature-controlled air to the window headers to ensure that condensation on older windows would not occur. Although the original intent of this system was to provide dryer, warmer air to the most likely point of condensation in the building (the windows), it was difficult to ignore the resemblance of this zone to a conventional automobile defrost system. FIGURE 2. Typical VAV system with central relief fan. (Schematic courtesy of Trane Engineering.) COLD AIR INTRUSION There are several methods to eliminating cold air intrusion. Obviously, a tight, wellinsulated envelope that does not allow the conduction of heat to the exterior is optimal. This helps to prevent the surface temperature from falling below the dewpoint of the air. Lack of proper insulation between window sills and the exterior are common locations for this problem. Eliminating cracks along www.protechinfo.com • 800.766.3473 • sales@protechinfo.com WHEN DOES AL29-4C stainless steel • precision TIG-welded seems • patented built-in locking bands • triple-lipped directional gaskets • standard adjustable vent lengths BECOME A SUPERIOR GAS VENT & CONDENSATE MANAGEMENT SYSTEM? When they are engineered into advanced systems that contain quality components with welded seams & silicone free joints ® Now Available in 3” - 24” Vent Diameters Input 153 at www.esmagazine.com/instantproductinfo PIPE/COIL LOCATION ISSUES The location of piping system components is critical in cold climates. Obviously, any pipe that conveys water without glycol should be run inside the building’s complete insulation barrier. While this fact seems intuitive, floor plan considerations, constructability considerations, and the general quality of workmanship sometimes test this well-known requirement. We have seen many instances of cracked sprinkler and plumbing lines that were located inside an incomplete insulation barrier. The locations of heating and cooling coils are also an item of concern. These coils in AHUs have the potential to be in the ‘line of fire’ of cold, outdoor air. Unfortunately, it only takes a small current of freezing, stratified air to pose a risk to coils. Some common resolutions to this problem include sufficient freeze-stats, draining coils in the winter, adding glycol to the water, constant flow circulators on a dedicated coil loop, and backup control schemes. Although freeze-stats are a first line of defense, it is not uncommon for these devices to be installed improperly, limiting their effectiveness. Facility departments draining the coils on a spring/fall cycle can resolve this. Glycol can increase overall pumping energy but provides a relatively secure method of preventing frozen coils. Another timetested solution for selected heating coils is the installation of a dedicated pump to keep the water in the coil moving. This method works well but can increase installation and operation costs. Some control schemes continuously monitor the inside temperature of the air handler. If the temperature drops too low, a sequence of steps may commence. These steps can include de-energizing the unit, increasing hot water flow through the coil either through ESM03084Protech.indd 1 54 En gi neer ed S y stem s October 2008 2/19/08 1:55:05 PM http://www.protechinfo.com http://www.protechinfo.com http://www.esmagazine.com/instantproductinfo
Table of Contents Feed for the Digital Edition of Engineered Systems - October 2008 Engineered Systems - October 2008 Contents Editor’s Note Letters Back2Basics HVAC Challenge Case in Point Commissioning Building Automation HydroTech HVACR Designer Tips Special Insert: Engineer's Technical Library Fall 2008 Living Wild! Chilled Beams in Chicago Phoenix Convention Center: On The Rise Cold-Climate HVAC Challenges Humidification Strategies For Data Centers & Network Rooms Special Advertising Supplement: Tabb Talk Computers & Software Issues & Events Products Literature & Catalogs Glossary Classifieds Advertiser Index Tomorrow’s Environment Engineered Systems - October 2008 Engineered Systems - October 2008 - Engineered Systems - October 2008 (Page Cover1) Engineered Systems - October 2008 - Engineered Systems - October 2008 (Page Cover2) Engineered Systems - October 2008 - Contents (Page 3) Engineered Systems - October 2008 - Contents (Page 4) Engineered Systems - October 2008 - Contents (Page 5) Engineered Systems - October 2008 - Editor’s Note (Page 6) Engineered Systems - October 2008 - Editor’s Note (Page 7) Engineered Systems - October 2008 - Letters (Page 8) Engineered Systems - October 2008 - Letters (Page 9) Engineered Systems - October 2008 - Letters (Page 10) Engineered Systems - October 2008 - Letters (Page 11) Engineered Systems - October 2008 - Letters (Page 12) Engineered Systems - October 2008 - Letters (Page 13) Engineered Systems - October 2008 - Back2Basics (Page 14) Engineered Systems - October 2008 - Back2Basics (Page 15) Engineered Systems - October 2008 - HVAC Challenge (Page 16) Engineered Systems - October 2008 - HVAC Challenge (Page 17) Engineered Systems - October 2008 - Case in Point (Page 18) Engineered Systems - October 2008 - Case in Point (Page 19) Engineered Systems - October 2008 - Case in Point (Page 20) Engineered Systems - October 2008 - Case in Point (Page 21) Engineered Systems - October 2008 - Case in Point (Page 22) Engineered Systems - October 2008 - Case in Point (Page 23) Engineered Systems - October 2008 - Case in Point (Page 24) Engineered Systems - October 2008 - Case in Point (Page 25) Engineered Systems - October 2008 - Case in Point (Page 26) Engineered Systems - October 2008 - Case in Point (Page 27) Engineered Systems - October 2008 - Commissioning (Page 28) Engineered Systems - October 2008 - Commissioning (Page 29) Engineered Systems - October 2008 - Building Automation (Page 30) Engineered Systems - October 2008 - Building Automation (Page 31) Engineered Systems - October 2008 - HydroTech (Page 32) Engineered Systems - October 2008 - HydroTech (Page 33) Engineered Systems - October 2008 - HVACR Designer Tips (Page 34) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL1) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL2) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL3) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL4) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL5) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL6) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL7) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL8) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL9) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL10) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL11) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL12) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page 35) Engineered Systems - October 2008 - Living Wild! (Page 36) Engineered Systems - October 2008 - Living Wild! (Page 37) Engineered Systems - October 2008 - Living Wild! (Page 38) Engineered Systems - October 2008 - Living Wild! (Page 39) Engineered Systems - October 2008 - Living Wild! (Page 40) Engineered Systems - October 2008 - Living Wild! (Page 41) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 42) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 43) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 44) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 45) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 46) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 47) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 48) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 49) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 50) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 51) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 52) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 53) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 54) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 55) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 56) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 57) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 58) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 59) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 60) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 61) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 62) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 63) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 64) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 65) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 66) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT1) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT2) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT3) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT4) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT5) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT6) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT7) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT8) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT9) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT10) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT11) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT12) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT13) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT14) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT15) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT16) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page 67) Engineered Systems - October 2008 - Computers & Software (Page 68) Engineered Systems - October 2008 - Computers & Software (Page 69) Engineered Systems - October 2008 - Issues & Events (Page 70) Engineered Systems - October 2008 - Issues & Events (Page 71) Engineered Systems - October 2008 - Issues & Events (Page 72) Engineered Systems - October 2008 - Issues & Events (Page 73) Engineered Systems - October 2008 - Products (Page 74) Engineered Systems - October 2008 - Products (Page 75) Engineered Systems - October 2008 - Products (Page 76) Engineered Systems - October 2008 - Products (Page 77) Engineered Systems - October 2008 - Literature & Catalogs (Page 78) Engineered Systems - October 2008 - Literature & Catalogs (Page 79) Engineered Systems - October 2008 - Literature & Catalogs (Page 80) Engineered Systems - October 2008 - Glossary (Page 81) Engineered Systems - October 2008 - Classifieds (Page 82) Engineered Systems - October 2008 - Classifieds (Page 83) Engineered Systems - October 2008 - Classifieds (Page 84) Engineered Systems - October 2008 - Advertiser Index (Page 85) Engineered Systems - October 2008 - Tomorrow’s Environment (Page 86) Engineered Systems - October 2008 - Tomorrow’s Environment (Page Cover3) Engineered Systems - October 2008 - Tomorrow’s Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.