Engineered Systems - October 2008 - (Page 55) valve modulation or pump flows, or closing ancillary dampers to provide a tighter close-off against cold outdoor air. Cold climates offer challenges as well as opportunities for building designers. Large expanses of finished space above a slab-on-grade are one challenge. These spaces can quickly exceed the effectiveness of perimeter radiation heating elements. Auditoriums are one common example of this type of space. Although the air temperature is appropriate four feet off the slab, the temperature of the air at ankle level can be cold. People who are sitting for long periods in this type of construction can complain of uncomfortable ankles and feet. This design challenge can be met with better insulation under the slab, and/or a radiant heating system within the slab. Control of this heating is critical, as it is possible to overheat the space with such a large slab. AIRSIDE ECONOMIZERS Airside economizers are a natural opportunity in cold climates. With increases in internal loading from computers and other equipment, the balance temperature for occupied buildings is continuously decreasing. (The balance temperature is the exterior temperature at which a building’s operational dynamic requires mechanical cooling for proper temperature control.) The outdoor air in cold climates can offer ‘free cooling’ for much of the year. However, overuse of this opportunity can result in improper moisture levels within the building. For example, cool exterior temperatures along the coast also typically come with high moisture levels. Overuse of an economizer in this situation can allow excessive water to enter the building without noticeable discomfort. However, when warmer temperatures arrive later in the day, the cooling equipment is faced with the task of removing not just the sensible heat but also the excess moisture that was allowed to enter the building during the morning economizer operation. This is a common situation where enthalpy-based changeovers should be used instead of db temperature-based changeovers. Special care needs to be given to protecting the building utilities such as water, sanitary, gas, storm water, electric, etc., as they run into the building. Typically, frost in unprotected (non-snow covered) areas of the site drive down several feet below the finished grade. Building utilities are typically designed to be installed below these frost lines. Obvious risk of freezing and/or unwanted movement would be present if these special precautions were not incorporated. BUILDING PRESSURIZATION Building pressurization in typical commercial construction is an important way to control unwanted infiltration. In most cases, uncontrolled infiltration is a building’s enemy. Uncontrolled infiltration caused by negative building pressures has consequences in both increased building energy consumption and ultimate operating costs. Positive building pressure can be accomplished mechanically through synchronizing outside air quantities introduced into the building and return or relief fans. Building pressure can also be pas- • Uniform Air Dispersion within the UFAD Plenum provides consistent temperature • Less Thermal Decay in high heat load zones • Flexible Fabric allows for smoother installation and accessibility • Simple, low cost for new and retrofit applications For more information, please conatct: Dispersion Better Air Underfloor Plenums for 4343 Chavenelle Rd • 866-382-8769 Dubuque, IA • 52002-2654 w w w. d u c t s ox . c o m Input 195 at www.esmagazine.com/instantproductinfo ESM10084Ductsox.indd 1 w w w. esmag a zin e. c o m 9/23/08 2:35:02 PM 55 http://www.ductsox.com http://www.ductsox.com http://www.esmagazine.com/instantproductinfo http://www.esmagazine.com
Table of Contents Feed for the Digital Edition of Engineered Systems - October 2008 Engineered Systems - October 2008 Contents Editor’s Note Letters Back2Basics HVAC Challenge Case in Point Commissioning Building Automation HydroTech HVACR Designer Tips Special Insert: Engineer's Technical Library Fall 2008 Living Wild! Chilled Beams in Chicago Phoenix Convention Center: On The Rise Cold-Climate HVAC Challenges Humidification Strategies For Data Centers & Network Rooms Special Advertising Supplement: Tabb Talk Computers & Software Issues & Events Products Literature & Catalogs Glossary Classifieds Advertiser Index Tomorrow’s Environment Engineered Systems - October 2008 Engineered Systems - October 2008 - Engineered Systems - October 2008 (Page Cover1) Engineered Systems - October 2008 - Engineered Systems - October 2008 (Page Cover2) Engineered Systems - October 2008 - Contents (Page 3) Engineered Systems - October 2008 - Contents (Page 4) Engineered Systems - October 2008 - Contents (Page 5) Engineered Systems - October 2008 - Editor’s Note (Page 6) Engineered Systems - October 2008 - Editor’s Note (Page 7) Engineered Systems - October 2008 - Letters (Page 8) Engineered Systems - October 2008 - Letters (Page 9) Engineered Systems - October 2008 - Letters (Page 10) Engineered Systems - October 2008 - Letters (Page 11) Engineered Systems - October 2008 - Letters (Page 12) Engineered Systems - October 2008 - Letters (Page 13) Engineered Systems - October 2008 - Back2Basics (Page 14) Engineered Systems - October 2008 - Back2Basics (Page 15) Engineered Systems - October 2008 - HVAC Challenge (Page 16) Engineered Systems - October 2008 - HVAC Challenge (Page 17) Engineered Systems - October 2008 - Case in Point (Page 18) Engineered Systems - October 2008 - Case in Point (Page 19) Engineered Systems - October 2008 - Case in Point (Page 20) Engineered Systems - October 2008 - Case in Point (Page 21) Engineered Systems - October 2008 - Case in Point (Page 22) Engineered Systems - October 2008 - Case in Point (Page 23) Engineered Systems - October 2008 - Case in Point (Page 24) Engineered Systems - October 2008 - Case in Point (Page 25) Engineered Systems - October 2008 - Case in Point (Page 26) Engineered Systems - October 2008 - Case in Point (Page 27) Engineered Systems - October 2008 - Commissioning (Page 28) Engineered Systems - October 2008 - Commissioning (Page 29) Engineered Systems - October 2008 - Building Automation (Page 30) Engineered Systems - October 2008 - Building Automation (Page 31) Engineered Systems - October 2008 - HydroTech (Page 32) Engineered Systems - October 2008 - HydroTech (Page 33) Engineered Systems - October 2008 - HVACR Designer Tips (Page 34) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL1) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL2) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL3) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL4) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL5) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL6) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL7) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL8) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL9) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL10) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL11) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page ETL12) Engineered Systems - October 2008 - Special Insert: Engineer's Technical Library Fall 2008 (Page 35) Engineered Systems - October 2008 - Living Wild! (Page 36) Engineered Systems - October 2008 - Living Wild! (Page 37) Engineered Systems - October 2008 - Living Wild! (Page 38) Engineered Systems - October 2008 - Living Wild! (Page 39) Engineered Systems - October 2008 - Living Wild! (Page 40) Engineered Systems - October 2008 - Living Wild! (Page 41) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 42) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 43) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 44) Engineered Systems - October 2008 - Chilled Beams in Chicago (Page 45) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 46) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 47) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 48) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 49) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 50) Engineered Systems - October 2008 - Phoenix Convention Center: On The Rise (Page 51) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 52) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 53) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 54) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 55) Engineered Systems - October 2008 - Cold-Climate HVAC Challenges (Page 56) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 57) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 58) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 59) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 60) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 61) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 62) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 63) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 64) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 65) Engineered Systems - October 2008 - Humidification Strategies For Data Centers & Network Rooms (Page 66) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT1) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT2) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT3) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT4) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT5) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT6) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT7) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT8) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT9) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT10) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT11) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT12) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT13) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT14) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT15) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page TT16) Engineered Systems - October 2008 - Special Advertising Supplement: Tabb Talk (Page 67) Engineered Systems - October 2008 - Computers & Software (Page 68) Engineered Systems - October 2008 - Computers & Software (Page 69) Engineered Systems - October 2008 - Issues & Events (Page 70) Engineered Systems - October 2008 - Issues & Events (Page 71) Engineered Systems - October 2008 - Issues & Events (Page 72) Engineered Systems - October 2008 - Issues & Events (Page 73) Engineered Systems - October 2008 - Products (Page 74) Engineered Systems - October 2008 - Products (Page 75) Engineered Systems - October 2008 - Products (Page 76) Engineered Systems - October 2008 - Products (Page 77) Engineered Systems - October 2008 - Literature & Catalogs (Page 78) Engineered Systems - October 2008 - Literature & Catalogs (Page 79) Engineered Systems - October 2008 - Literature & Catalogs (Page 80) Engineered Systems - October 2008 - Glossary (Page 81) Engineered Systems - October 2008 - Classifieds (Page 82) Engineered Systems - October 2008 - Classifieds (Page 83) Engineered Systems - October 2008 - Classifieds (Page 84) Engineered Systems - October 2008 - Advertiser Index (Page 85) Engineered Systems - October 2008 - Tomorrow’s Environment (Page 86) Engineered Systems - October 2008 - Tomorrow’s Environment (Page Cover3) Engineered Systems - October 2008 - Tomorrow’s Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.