Engineered Systems - November 2008 - (Page 22) BuildingAutomation BY PAUL EHRLICH, P.E., AND IRA GOLDSCHMIDT, P.E. DATA CENTER Now that the dot.com bubble has been dimmed by history, it is interesting to reflect on how mission critical buildings have influenced BAS design. Looking back at the crazy days of the late ’90s, we may recall that it was not a good time to put quality thinking into how best to control a mission critical facility. Many projects struggled with both short schedules (and we know what design/ construction aspect suffers the most when this happens) and overly ambitious uptime criteria (everyone was vying for bragging rights on the greatest “number of 9’s”). Fortunately, data centers have continued to be built and generally have had more realistic approaches to balancing cost and quality and now energy efficiency. What’s interesting about mission critical facility design is that it forces the controls designer to ponder questions about a specialized BAS design (just like health care and labs, but in a very different manner) than for the typical commercial facility. In many ways, data centers come closest to blurring the line between commercial and industrial controls in our industry. So what are the controls issues that make mission critical facilities so unique? Simply put, the requirement for virtually no HVAC downtime requires systems that are redundant and failsafe. But what does this really mean to the controls designer? While we might expect to find the answer to these questions from industry groups such as the Uptime Institute that defines criteria for “Tier 1, 2, etc.,” the issues of controls and automation are not clearly addressed. CONTROLS REDUNDANCY Redundancy seems like a straightforward concept to mechanical design, but when applied to controls it gets much more complicated. For example, we know that mechanically an N+1 chiller plant has one more chiller installed than is needed to meet the load. But what controls redundancy is required for an N+1 design? Here are some things to consider: • Shouldn’t each chiller and its associated pumps, cooling tower, etc., be controlled by a dedicated BAS controller? On the other hand, what if each chiller system require so many points of control that more than one controller is required — if so, does the required controller-to-controller communications degrade redundancy? • Since the chiller plant typically feeds a common, variable-flow chilled water loop, how many differential pressure sensors should there be, and to which of the above controllers should they be connected? For example, if there is only one sensor and the controller to which it is connected fails then so much for mechanical redundancy, but how many sensors are needed? • Should the controllers contain redundant common control sequences? For example, the common chilled water pump VFD/pressure control sequence — what if the controller in which that sequence resides fails? Shouldn’t there be a redundant version of that control sequence in more than one controller? • Should each of the above controllers be fed by a completely separate UPS-backed power source? If so, how many separate power sources are important for, say, a chiller plant with four chillers? 22 En gi neer ed S y stem s November 2008 Building Automation Should the controllers contain redundant common control sequences? For example the sequences? For example, the comm common chilled water pump VFD/ mmon chilled wat hill ater pum VFD/ ump pressure control sequence pressure control sequence — what what if the controller in which that e o toe c a sequence resides fails? sequence resides fails? FAILSAFE AS ITS OWN GOAL? Failsafe is a design goal that can mean different things to different people. In mission critical design, it generally means that when a controls or communications component fails the controlled system should not stop operating (within reason of course). Again, here are some alternatives to consider concerning failsafe: • If a controller fails should the point interfaces be designed so that the equipment continues to operate in the same state after the failure (which might require latching relays) or should equipment just be wired to fail on (but to what speed should a VFD fail)? • Or, should each chiller be served by two completely redundant controllers, so that when one controller fails the other one takes over? Does this then mean that controls failsafe is really controls redundancy? And does this possibly introduce more problems than it solves? Controls and BAS design for mission critical facilities requires focus and attention on these many issues as well as the added challenge to attempt to deliver on energy efficiency. In short, these can be very satisfying, but challenging projects. ES Paul and Ira first worked together on a series of ASHRAE projects including BACnet committee and “Guideline 13 – Specifying DDC Controls.” The formation of Building Intelligence Group provided them the ability to work together professionally providing assistance to owners with the planning, design and development of Intelligent Building Systems. Building Intelligence Group provides services for clients worldwide including leading Universities, Corporations, and Developers. More information can be found at www.buildingintelligencegroup.com. We also invite you to contact us directly at paul@buildingintelligencegroup.com or ira@ buildingintelligencegroup.com. The solution is complex when the equation is “N+1 = which controls?” http://www.buildingintelligencegroup.com
Table of Contents Feed for the Digital Edition of Engineered Systems - November 2008 Engineered Systems - November 2008 Contents Editor’s Note HVAC Challenge Back2Basics Case In Point Commissioning Building Automation HVACR Designer Tips Show Me The Motor Money The IAQ Top 10 Putting A Damper on Tragedy Special: Lighting Controls Computers & Software Products Glossary Classifieds Advertiser Index Tomorrow’s Environment Engineered Systems - November 2008 Engineered Systems - November 2008 - (Page Intro) Engineered Systems - November 2008 - Engineered Systems - November 2008 (Page Cover1) Engineered Systems - November 2008 - Engineered Systems - November 2008 (Page Cover2) Engineered Systems - November 2008 - Engineered Systems - November 2008 (Page 3) Engineered Systems - November 2008 - Contents (Page 4) Engineered Systems - November 2008 - Contents (Page 5) Engineered Systems - November 2008 - Editor’s Note (Page 6) Engineered Systems - November 2008 - Editor’s Note (Page 7) Engineered Systems - November 2008 - HVAC Challenge (Page 8) Engineered Systems - November 2008 - HVAC Challenge (Page 9) Engineered Systems - November 2008 - Back2Basics (Page 10) Engineered Systems - November 2008 - Back2Basics (Page 11) Engineered Systems - November 2008 - Case In Point (Page 12) Engineered Systems - November 2008 - Case In Point (Page 13) Engineered Systems - November 2008 - Case In Point (Page 14) Engineered Systems - November 2008 - Case In Point (Page 15) Engineered Systems - November 2008 - Case In Point (Page 16) Engineered Systems - November 2008 - Case In Point (Page 17) Engineered Systems - November 2008 - Case In Point (Page 18) Engineered Systems - November 2008 - Case In Point (Page 19) Engineered Systems - November 2008 - Commissioning (Page 20) Engineered Systems - November 2008 - Commissioning (Page 21) Engineered Systems - November 2008 - Building Automation (Page 22) Engineered Systems - November 2008 - Building Automation (Page 23) Engineered Systems - November 2008 - HVACR Designer Tips (Page 24) Engineered Systems - November 2008 - HVACR Designer Tips (Page 25) Engineered Systems - November 2008 - Show Me The Motor Money (Page 26) Engineered Systems - November 2008 - Show Me The Motor Money (Page 27) Engineered Systems - November 2008 - Show Me The Motor Money (Page 28) Engineered Systems - November 2008 - Show Me The Motor Money (Page 29) Engineered Systems - November 2008 - The IAQ Top 10 (Page 30) Engineered Systems - November 2008 - The IAQ Top 10 (Page 31) Engineered Systems - November 2008 - The IAQ Top 10 (Page 32) Engineered Systems - November 2008 - The IAQ Top 10 (Page 33) Engineered Systems - November 2008 - The IAQ Top 10 (Page 34) Engineered Systems - November 2008 - The IAQ Top 10 (Page 35) Engineered Systems - November 2008 - The IAQ Top 10 (Page 36) Engineered Systems - November 2008 - The IAQ Top 10 (Page 37) Engineered Systems - November 2008 - The IAQ Top 10 (Page 38) Engineered Systems - November 2008 - The IAQ Top 10 (Page 39) Engineered Systems - November 2008 - The IAQ Top 10 (Page 40) Engineered Systems - November 2008 - The IAQ Top 10 (Page 41) Engineered Systems - November 2008 - The IAQ Top 10 (Page 42) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 43) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 44) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 45) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 46) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 47) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 48) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 49) Engineered Systems - November 2008 - Special: Lighting Controls (Page 50) Engineered Systems - November 2008 - Special: Lighting Controls (Page 51) Engineered Systems - November 2008 - Special: Lighting Controls (Page 52) Engineered Systems - November 2008 - Special: Lighting Controls (Page 53) Engineered Systems - November 2008 - Special: Lighting Controls (Page 54) Engineered Systems - November 2008 - Special: Lighting Controls (Page 55) Engineered Systems - November 2008 - Special: Lighting Controls (Page 56) Engineered Systems - November 2008 - Special: Lighting Controls (Page 57) Engineered Systems - November 2008 - Special: Lighting Controls (Page 58) Engineered Systems - November 2008 - Special: Lighting Controls (Page 59) Engineered Systems - November 2008 - Special: Lighting Controls (Page 60) Engineered Systems - November 2008 - Special: Lighting Controls (Page 61) Engineered Systems - November 2008 - Computers & Software (Page 62) Engineered Systems - November 2008 - Products (Page 63) Engineered Systems - November 2008 - Glossary (Page 64) Engineered Systems - November 2008 - Classifieds (Page 65) Engineered Systems - November 2008 - Classifieds (Page 66) Engineered Systems - November 2008 - Classifieds (Page 67) Engineered Systems - November 2008 - Classifieds (Page 68) Engineered Systems - November 2008 - Advertiser Index (Page 69) Engineered Systems - November 2008 - Tomorrow’s Environment (Page 70) Engineered Systems - November 2008 - Tomorrow’s Environment (Page Cover3) Engineered Systems - November 2008 - Tomorrow’s Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.