Engineered Systems - November 2008 - (Page 56) G INTELLIGENT LIGHTING GREEN INTELLIGENT BUILDINGS Accountegration — Proven Integration at a Lower Cost BY RON POSKEVICH or many engineers and building owners, integrating lighting control with the BAS has been a game of chance with very poor odds. Those disappointing results are supported by an industry survey that reveals less than 6% of all BAS installations include control lighting. The primary reason for these meager results is fragmentation. Fragmentation in the field leads to the growth of uncertainty in the design and bid process. As the electrical contractors and BAS control contractors developed their bids, they were unlikely to know in advance which two systems would be awarded the contract. This uncertainty, which normally fostered the best deal for standalone systems, actually encouraged each participant to add a risk premium to their price to cover integration uncertainty costs. Competitive pricing is an important aspect to the process that must not be eliminated, but in an uncertain process, standalone systems will usually have a clear price advantage. In this bidding model, it is clear that no one has a stake in maintaining these uncertainties and the inherent integration risk that accompanies this outdated approach. Fortunately, there is a simple solution called Accountegration. WHAT IS ACCOUNTEGRATION? Accountegration is the alignment of accountability with core competencies to substantially reduce risk, foster better competition, and increase the economic benefit for integrated lighting solutions. By aligning accountability with each participant’s core competencies everyone is put into to position to succeed. In simpler terms, when lighting control is to be integrated into the BAS, lighting control should be provided by the BAS controls contractor and installed by the electrical contractor. This change fundamentally moves the expertise and accountability to those that are in the best position to deliver a sustainable, integrated solution. Using the Accountegration methodology of specification, the BAS control contractor chooses a lighting control system proven to interoperate with the existing equipment and includes that system in the bid, effectively eliminating integration uncertainty. Likewise, the electrical contractor develops his bid knowing that he is clearly responsible for installing the lighting control system and ensuring 56G ES GREEN INTELLIGENT BUILDINGS November 2008 F electrical power and connectivity to the lighting. The designer can easily, confidently, and clearly specify that the lighting control system is provided by the BAS control contractor and is installed by the electrical contractor. The owner gets an integrated EMS that is sustainable and maximizes the return on their investment. GREEN AND INTELLIGENT BUILDINGS Accountegration also aligns well with recent trends in green and intelligent building market, a trend toward a more holistic approach to building performance. Green and intelligent building performance expectations are moving lighting and HVAC control sequences of operation closer together. This is especially true with new ASHRAE 90.1 and LEED® standards. To support this market transformation, there must be local system experts to assist the design community in achieving an integrated solution that can eliminate integration uncertainty and virtually guarantee integration success. ADDITIONAL BENEFITS Clearly, Accountegration addresses integration uncertainty which eliminates a risk premium, but there is much more to consider. Accountegration can also eliminate the need for separate lighting control system network. By placing the provision of lighting control within the BAS scope of work, the BAS network can be leveraged with substantial wiring and labor savings for the owner. The same approach can be used on retrofit applications as well. Accountegration provides a single point of accountability for integration issues. When a problem arises or the specification is not being met, the BAS controls contractor is the single point of accountability. The result is fewer project delays and it eliminates the finger pointing that is prevalent in a fragmented process. Accountegration also enables tighter control sequences and system optimization to ultimately drive better energy performance and savings for the building owner. There is a growing realization in our industry that lighting and HVAC must work together to provide sustainable energy performance and comfort for the occupants.
Table of Contents Feed for the Digital Edition of Engineered Systems - November 2008 Engineered Systems - November 2008 Contents Editor’s Note HVAC Challenge Back2Basics Case In Point Commissioning Building Automation HVACR Designer Tips Show Me The Motor Money The IAQ Top 10 Putting A Damper on Tragedy Special: Lighting Controls Computers & Software Products Glossary Classifieds Advertiser Index Tomorrow’s Environment Engineered Systems - November 2008 Engineered Systems - November 2008 - (Page Intro) Engineered Systems - November 2008 - Engineered Systems - November 2008 (Page Cover1) Engineered Systems - November 2008 - Engineered Systems - November 2008 (Page Cover2) Engineered Systems - November 2008 - Engineered Systems - November 2008 (Page 3) Engineered Systems - November 2008 - Contents (Page 4) Engineered Systems - November 2008 - Contents (Page 5) Engineered Systems - November 2008 - Editor’s Note (Page 6) Engineered Systems - November 2008 - Editor’s Note (Page 7) Engineered Systems - November 2008 - HVAC Challenge (Page 8) Engineered Systems - November 2008 - HVAC Challenge (Page 9) Engineered Systems - November 2008 - Back2Basics (Page 10) Engineered Systems - November 2008 - Back2Basics (Page 11) Engineered Systems - November 2008 - Case In Point (Page 12) Engineered Systems - November 2008 - Case In Point (Page 13) Engineered Systems - November 2008 - Case In Point (Page 14) Engineered Systems - November 2008 - Case In Point (Page 15) Engineered Systems - November 2008 - Case In Point (Page 16) Engineered Systems - November 2008 - Case In Point (Page 17) Engineered Systems - November 2008 - Case In Point (Page 18) Engineered Systems - November 2008 - Case In Point (Page 19) Engineered Systems - November 2008 - Commissioning (Page 20) Engineered Systems - November 2008 - Commissioning (Page 21) Engineered Systems - November 2008 - Building Automation (Page 22) Engineered Systems - November 2008 - Building Automation (Page 23) Engineered Systems - November 2008 - HVACR Designer Tips (Page 24) Engineered Systems - November 2008 - HVACR Designer Tips (Page 25) Engineered Systems - November 2008 - Show Me The Motor Money (Page 26) Engineered Systems - November 2008 - Show Me The Motor Money (Page 27) Engineered Systems - November 2008 - Show Me The Motor Money (Page 28) Engineered Systems - November 2008 - Show Me The Motor Money (Page 29) Engineered Systems - November 2008 - The IAQ Top 10 (Page 30) Engineered Systems - November 2008 - The IAQ Top 10 (Page 31) Engineered Systems - November 2008 - The IAQ Top 10 (Page 32) Engineered Systems - November 2008 - The IAQ Top 10 (Page 33) Engineered Systems - November 2008 - The IAQ Top 10 (Page 34) Engineered Systems - November 2008 - The IAQ Top 10 (Page 35) Engineered Systems - November 2008 - The IAQ Top 10 (Page 36) Engineered Systems - November 2008 - The IAQ Top 10 (Page 37) Engineered Systems - November 2008 - The IAQ Top 10 (Page 38) Engineered Systems - November 2008 - The IAQ Top 10 (Page 39) Engineered Systems - November 2008 - The IAQ Top 10 (Page 40) Engineered Systems - November 2008 - The IAQ Top 10 (Page 41) Engineered Systems - November 2008 - The IAQ Top 10 (Page 42) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 43) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 44) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 45) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 46) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 47) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 48) Engineered Systems - November 2008 - Putting A Damper on Tragedy (Page 49) Engineered Systems - November 2008 - Special: Lighting Controls (Page 50) Engineered Systems - November 2008 - Special: Lighting Controls (Page 51) Engineered Systems - November 2008 - Special: Lighting Controls (Page 52) Engineered Systems - November 2008 - Special: Lighting Controls (Page 53) Engineered Systems - November 2008 - Special: Lighting Controls (Page 54) Engineered Systems - November 2008 - Special: Lighting Controls (Page 55) Engineered Systems - November 2008 - Special: Lighting Controls (Page 56) Engineered Systems - November 2008 - Special: Lighting Controls (Page 57) Engineered Systems - November 2008 - Special: Lighting Controls (Page 58) Engineered Systems - November 2008 - Special: Lighting Controls (Page 59) Engineered Systems - November 2008 - Special: Lighting Controls (Page 60) Engineered Systems - November 2008 - Special: Lighting Controls (Page 61) Engineered Systems - November 2008 - Computers & Software (Page 62) Engineered Systems - November 2008 - Products (Page 63) Engineered Systems - November 2008 - Glossary (Page 64) Engineered Systems - November 2008 - Classifieds (Page 65) Engineered Systems - November 2008 - Classifieds (Page 66) Engineered Systems - November 2008 - Classifieds (Page 67) Engineered Systems - November 2008 - Classifieds (Page 68) Engineered Systems - November 2008 - Advertiser Index (Page 69) Engineered Systems - November 2008 - Tomorrow’s Environment (Page 70) Engineered Systems - November 2008 - Tomorrow’s Environment (Page Cover3) Engineered Systems - November 2008 - Tomorrow’s Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.