Engineered Systems - March 2009 - (Page 16) CaseInPoint solutions are available through a nationwide network of Vykon Distributors. ActiveLogix Charlotte, NC 704-578-9776 vykonsales@activelogix.com Advanced Power Control, Inc. Newark, DE 302-368-0443 vykonsales@adv-power.com BITS Waukesha, WI 877-334-9333 vykonsales@envsysinc.com Cochrane Supply Madison Heights, MI 248-588-9260 vykonsales@ cochranesupply.com Controlco Automation Distributors Concord, CA 925-602-7728 vykonsales@controlco.com Control Consultants, Inc. Weymouth, MA 781-335-8353 vykonsales@ controlconsultantsinc.com E.C. Smyers Co. Pittsburgh, PA 412-471-3222 vykonsales@smyers.com Industrial Control Distributors Wanamassa, NJ 732-918-9000 vykonsales@icdmail.com Jackson Control Company, Inc. Indianapolis, IN 800-772-9859 vykonsales@jacksoncontrol.com Long Building Technology Englewood, CO 303-975-2100 vykonsales@long.com Minvalco, Inc. Minneapolis, MN 952-920-0131 vykonsales@minvalco.com Temperature Control Systems, Inc. Dallas, TX 214-343-1444 vykonsales@tempconsys.com Universal Supply Group, Inc. Hawthorne, NJ 973-427-3320 vykonsales@usginc.com Input 23 at www.esmagazine.com/instantproductinfo O’Day met with government representatives in mid-March to review occupancy plans. Very tight security at the venues placed some restrictions on where the cooling equipment could be located and also had to be factored into the planning. Using this input, U.S. Engineering calculated heat loads, determined the appropriate cooling tonnage to serve each area, and designed the required ductwork. “We only had about six weeks from the initial meeting date to final installation, so everything had to be done on a fast-track schedule,” he notes. ON TRACK The cooling equipment selected for the job included about 30 portable air conditioners from Atlas Sales & Rentals that ranged from 1 to 12 tons each in cooling capacity. The largest units were placed outside the command centers and hard-ducted using nearly 200 ft of ductwork in split runs. Seven-andhalf-ton ton units were installed adjacent to the video security area, and smaller units (1 to 5 tons) with either hard ducting or “snorkel packs” were used to serve conference rooms and similar areas. O’Day said that delivery and installation went smoothly, and the portable coolers performed without a glitch throughout the summer. “On the Friday night before the convention, one unit went down, not because of equipment failure but due to human error,” says O’Day. “Atlas immediately delivered a spare unit to the site and got it up and running right away. Even though it turned out the cooler that went down was working fine, we kept the backup unit onsite as a precaution.” “Despite the record heat, the portable air conditioners from Atlas really did the job, maintaining 68° temperatures to protect critical staff and equipment. We were very pleased with how it turned out,” he said. Atlas supplied 25 to 30 additional portable machines for comfort and equipment protection in locations around the Pepsi Center during the week of the Democratic National Convention. According to Atlas Denver office manager Dave Mann, these units served media equipment rooms as well as tented hospitality and staging areas outside the Pepsi Center. “We were receiving daily calls for added equipment, and we Input 59 at www.esmagazine.com/instantproductinfo Input 23 at www.esmagazine.com/instantproductinfo 16 En gi neer ed S y stem s March 2009 http://www.lattner.com http://www.esmagazine.com/instantproductinfo http://www.lattner.com http://www.esmagazine.com/instantproductinfo http://www.esmagazine.com/instantproductinfo
Table of Contents Feed for the Digital Edition of Engineered Systems - March 2009 Engineered Systems - March 2009 Contents Editor’s Note Back2Basics Case In Point Commissioning Building Automation HVACR Designer Tips Application Checklist Teaching An Old School New Tricks Basics For Absorption Chillers A New Haven For Sustainable Schools Glossary Classifieds Advertiser Index Tomorrow’s Environment Engineered Systems - March 2009 Engineered Systems - March 2009 - (Page Intro) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page Cover1) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page Cover2) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page 3) Engineered Systems - March 2009 - Contents (Page 4) Engineered Systems - March 2009 - Contents (Page 5) Engineered Systems - March 2009 - Contents (Page 6) Engineered Systems - March 2009 - Contents (Page 7) Engineered Systems - March 2009 - Editor’s Note (Page 8) Engineered Systems - March 2009 - Editor’s Note (Page 9) Engineered Systems - March 2009 - Back2Basics (Page 10) Engineered Systems - March 2009 - Back2Basics (Page 11) Engineered Systems - March 2009 - Back2Basics (Page 12) Engineered Systems - March 2009 - Back2Basics (Page 13) Engineered Systems - March 2009 - Case In Point (Page 14) Engineered Systems - March 2009 - Case In Point (Page 15) Engineered Systems - March 2009 - Case In Point (Page 16) Engineered Systems - March 2009 - Case In Point (Page 17) Engineered Systems - March 2009 - Case In Point (Page 18) Engineered Systems - March 2009 - Case In Point (Page 19) Engineered Systems - March 2009 - Case In Point (Page 20) Engineered Systems - March 2009 - Case In Point (Page 21) Engineered Systems - March 2009 - Commissioning (Page 22) Engineered Systems - March 2009 - Commissioning (Page 23) Engineered Systems - March 2009 - Building Automation (Page 24) Engineered Systems - March 2009 - Building Automation (Page 25) Engineered Systems - March 2009 - HVACR Designer Tips (Page 26) Engineered Systems - March 2009 - HVACR Designer Tips (Page 27) Engineered Systems - March 2009 - Application Checklist (Page 28) Engineered Systems - March 2009 - Application Checklist (Page 29) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 30) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 31) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 32) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 33) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 34) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 35) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 36) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 37) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 38) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 39) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 40) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 41) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 42) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 43) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 44) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 45) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 46) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 47) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 48) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 49) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 50) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 51) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 52) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 53) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 54) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 55) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 56) Engineered Systems - March 2009 - Glossary (Page 57) Engineered Systems - March 2009 - Classifieds (Page 58) Engineered Systems - March 2009 - Classifieds (Page 59) Engineered Systems - March 2009 - Classifieds (Page 60) Engineered Systems - March 2009 - Advertiser Index (Page 61) Engineered Systems - March 2009 - Tomorrow’s Environment (Page 62) Engineered Systems - March 2009 - Tomorrow’s Environment (Page Cover3) Engineered Systems - March 2009 - Tomorrow’s Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.