Engineered Systems - March 2009 - (Page 26) HVACRDesignerTips BY AMANDA MCKEW EDUCATIONAL FACILITY Commissioning and Project Closeout Checklist Equipment type: Dust collector and makeup air unit Equipment designation: DCE-1, VAVRH-1 Barcode designation: 11111 Area saved: Wood shop Equipment location: Outdoors system simulation is programmed and is trending. • Confirm LEED measuring and verification plan is programmed and trending. • Confirm 10-month warranty meeting to revisit site and discuss lessons learned, etc. BASIS OF DESIGN • Review and confirm design intent has been met. • Review and confirm control setpoints are within range of design criteria. • Review BAS computer trending to date. DOCUMENTATION TO BUILDING MANAGER • Transfer final commissioning report including: • Basis of design/design intent document • Commissioning plan/specification (for future building program use) • Prefunctional performance test checklists • Observation checklists • Field reports • Continuous commissioning BAS computer process is in place (if applicable) • Scrubbed FPT narratives for future use • Meeting minutes • Project photograph log and associated photographs • Lessons-learned meeting minutes • Transfer CAD-layered record drawings. • Transfer CAD-layered facility management drawings. • Transfer barcoded equipment, panel, and valve database. • Confirm equipment, panels, and valves are bar-coded. • Post system flow diagram and TAB flow diagram. • Transfer barcode scanner. • Transfer Commissioning 1-2-3 electronic files. • Transfer CMMS software with/or equipment database. • Transfer PM workorders. • Transfer service contract. • Transfer recommissioning manual. • Transfer ownership of laptop or tablet computer with Internet access and BAS computer for off-site monitoring. • Transfer recommended operating budget. ES SPECIFICATION REVIEW • Confirm Division 1 mechanical and electrical requirements (O&M manuals, record drawings, etc., have been submitted). • Confirm Division 15 mechanical requirements have been met. • Confirm Division 16 electrical requirements have been met. • Confirm Division 17 building automation requirements have been met. DRAWING REVIEW • Confirm equipment complies with shop drawing submittal. • Confirm equipment and distribution complies with standard details. • Review trade contractor’s punchlist. • Review contractor startup sheets. • Review building automation points list checkout. • Complete site inspection punchlist. • Review water balancing report data-to-actual performance (pressure gauge readings, flow meter readings, etc.). • Review air balancing and temperature operating data (cfm/fan, discharge temperature/fan). BUILDING SYSTEM DEMONSTRATION • Commissioning engineer facilitates functional performance tests (FPTs). • Spot-check system training during the FPTs. • Spot-check O&M manuals during the FPTs. • Confirm PM workorders are complete and ready to begin at time of certificate of occupancy. • Confirm BAS computer predictive maintenance monitoring and workorder initiation is complete and ready to begin at time of certificate of occupancy. • Maintain corrective action log and necessary retesting. • Set and observe deferred seasonal FPT has been completed. • Complete final commissioning report. ❍ Central Equipment ❍ Terminal Equipment & Space ✔ ❍ Project Closeout If you have any comments, suggestions, or questions regarding this designer checklist, contact Amanda McKew at amckew@rdkengineers.com. LEED® CERTIFICATION COMPLIANCE • Complete recommissioning manual. • Confirm system training has been completed and facility staff signoff on training class attendance. • Confirm LEED® energy optimization software and associated 26 En g i neer ed Sy stem s March 2009
Table of Contents Feed for the Digital Edition of Engineered Systems - March 2009 Engineered Systems - March 2009 Contents Editor’s Note Back2Basics Case In Point Commissioning Building Automation HVACR Designer Tips Application Checklist Teaching An Old School New Tricks Basics For Absorption Chillers A New Haven For Sustainable Schools Glossary Classifieds Advertiser Index Tomorrow’s Environment Engineered Systems - March 2009 Engineered Systems - March 2009 - (Page Intro) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page Cover1) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page Cover2) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page 3) Engineered Systems - March 2009 - Contents (Page 4) Engineered Systems - March 2009 - Contents (Page 5) Engineered Systems - March 2009 - Contents (Page 6) Engineered Systems - March 2009 - Contents (Page 7) Engineered Systems - March 2009 - Editor’s Note (Page 8) Engineered Systems - March 2009 - Editor’s Note (Page 9) Engineered Systems - March 2009 - Back2Basics (Page 10) Engineered Systems - March 2009 - Back2Basics (Page 11) Engineered Systems - March 2009 - Back2Basics (Page 12) Engineered Systems - March 2009 - Back2Basics (Page 13) Engineered Systems - March 2009 - Case In Point (Page 14) Engineered Systems - March 2009 - Case In Point (Page 15) Engineered Systems - March 2009 - Case In Point (Page 16) Engineered Systems - March 2009 - Case In Point (Page 17) Engineered Systems - March 2009 - Case In Point (Page 18) Engineered Systems - March 2009 - Case In Point (Page 19) Engineered Systems - March 2009 - Case In Point (Page 20) Engineered Systems - March 2009 - Case In Point (Page 21) Engineered Systems - March 2009 - Commissioning (Page 22) Engineered Systems - March 2009 - Commissioning (Page 23) Engineered Systems - March 2009 - Building Automation (Page 24) Engineered Systems - March 2009 - Building Automation (Page 25) Engineered Systems - March 2009 - HVACR Designer Tips (Page 26) Engineered Systems - March 2009 - HVACR Designer Tips (Page 27) Engineered Systems - March 2009 - Application Checklist (Page 28) Engineered Systems - March 2009 - Application Checklist (Page 29) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 30) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 31) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 32) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 33) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 34) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 35) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 36) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 37) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 38) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 39) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 40) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 41) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 42) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 43) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 44) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 45) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 46) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 47) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 48) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 49) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 50) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 51) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 52) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 53) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 54) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 55) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 56) Engineered Systems - March 2009 - Glossary (Page 57) Engineered Systems - March 2009 - Classifieds (Page 58) Engineered Systems - March 2009 - Classifieds (Page 59) Engineered Systems - March 2009 - Classifieds (Page 60) Engineered Systems - March 2009 - Advertiser Index (Page 61) Engineered Systems - March 2009 - Tomorrow’s Environment (Page 62) Engineered Systems - March 2009 - Tomorrow’s Environment (Page Cover3) Engineered Systems - March 2009 - Tomorrow’s Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.