Engineered Systems - March 2009 - (Page 39) www.dedietrichboilers.com Basics For Absorption Chillers 0.1 ATM Steam fired Generator 5 1 Steam Condensor High temp. Generator Pump Chilled water out Cooling water out 8 Steam 3 6 0.01 ATM Evaporator 7 2 High temp. Hx Comp. Hx Low temp. Hx Absorber Evap. spray pump Chilled water in As the Boiler Should Be!!! GAS 230 and GAS 310 ECO SERIES 4 Absorber spray pump Purge pump Cooling water in Generator pump FIGURE 2. Double-effect absorption refrigeration cycle. pleting the absorber cycle. • Double-effect absorption chiller. The double-effect chiller condensing (condenser), expansion (expansion pipe), evaporation (evaporator), and absorption (absorber) steps are the same as the single-effect chiller. The double-effect chiller has an additional generator/concentrator step that improves the overall efficiency of the chiller (Figure 2). The following is a description of the double-effect chiller generator/concentration: • Generator/concentrator. The lithium-bromide solution enters the low-temperature generator/concentrator and is heated by the high temperature generator/concentrator vaporized refrigerant, raising the lithiumbromide solution to a temperature where the liquid refrigerant vaporizes and travels to the condenser. The high-temperature vaporized refrigerant discharges into the condenser. The concentrated lithium bromide solution takes one of two paths. One path has the lithium-bromide solution flowing down to the absorber, being mixed with higher concentrated lithium-bromide solution coming from the high temperature generator/ concentrator, heated, and discharged into absorber. The other path has the lithiumbromide solution being heated and pumped to the high temperature generator/concentrator where steam, hot water, or direct- fired heating is applied to raise the lithium bromide solution to a temperature where the liquid refrigerant vaporizes and travels to the condenser. The highly concentrated lithium bromide solution is mixed with the concentrated lithium bromide going to the absorber. CHILLER PERFORMANCE STANDARD The primary absorption chiller performance standard is ARI Standard 560 (2000 Standard for Absorption Water Chilling and Water Heating Packages). ARI Standard 560 applies to water cooled single-effect steam chillers, water cooled single-effect hot water chillers, water cooled double-effect steam chillers, water cooled double-effect hot water chillers, and water cooled double-effect direct-fired chillers. This standard provides testing standard conditions, rating requirements, minimum data requirements for published ratings, and integrated part load value (IPLV) or non-standard part load value (NPLV). For performing the IPLV testing, ARI Standard 560 has established standard conditions for absorption chillers including: • Entering condenser water temperature: 85° • Condenser water flow rate: 3.6 gpm/ton (single-effect indirect fired) • 4.0 gpm/ton (double-effect indirect fired, double-effect direct-fired) • Condenser water-side fouling factor: 0.00025 • Evaporator leaving water temperature: 44° • Evaporator water flow rate: 2.4 gpm/ton CONDENSING BOILERS c 99.9% Thermal Efficiency c Cast Aluminum Heat Exchanger c SCAQMD Certified to <20 ppm NOx c 9 Models Ranging from 300 to 2,000 MBH c 100 PSI Working Pressure c Lowest Pressure Drops c No Minimum Return Temperature c Best Warranty in the Industry c Noise Rating <60dBa c In Stock, Next Day Delivery!! WHEN YOU TH!NK BOILERS TH!NK Input 219 at www.esmagazine.com/instantproductinfo w w w. esmag a zin e. c o m 39 http://www.dedietrichboilers.com http://www.dedietrichboilers.com http://www.esmagazine.com/instantproductinfo http://www.esmagazine.com
Table of Contents Feed for the Digital Edition of Engineered Systems - March 2009 Engineered Systems - March 2009 Contents Editor’s Note Back2Basics Case In Point Commissioning Building Automation HVACR Designer Tips Application Checklist Teaching An Old School New Tricks Basics For Absorption Chillers A New Haven For Sustainable Schools Glossary Classifieds Advertiser Index Tomorrow’s Environment Engineered Systems - March 2009 Engineered Systems - March 2009 - (Page Intro) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page Cover1) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page Cover2) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page 3) Engineered Systems - March 2009 - Contents (Page 4) Engineered Systems - March 2009 - Contents (Page 5) Engineered Systems - March 2009 - Contents (Page 6) Engineered Systems - March 2009 - Contents (Page 7) Engineered Systems - March 2009 - Editor’s Note (Page 8) Engineered Systems - March 2009 - Editor’s Note (Page 9) Engineered Systems - March 2009 - Back2Basics (Page 10) Engineered Systems - March 2009 - Back2Basics (Page 11) Engineered Systems - March 2009 - Back2Basics (Page 12) Engineered Systems - March 2009 - Back2Basics (Page 13) Engineered Systems - March 2009 - Case In Point (Page 14) Engineered Systems - March 2009 - Case In Point (Page 15) Engineered Systems - March 2009 - Case In Point (Page 16) Engineered Systems - March 2009 - Case In Point (Page 17) Engineered Systems - March 2009 - Case In Point (Page 18) Engineered Systems - March 2009 - Case In Point (Page 19) Engineered Systems - March 2009 - Case In Point (Page 20) Engineered Systems - March 2009 - Case In Point (Page 21) Engineered Systems - March 2009 - Commissioning (Page 22) Engineered Systems - March 2009 - Commissioning (Page 23) Engineered Systems - March 2009 - Building Automation (Page 24) Engineered Systems - March 2009 - Building Automation (Page 25) Engineered Systems - March 2009 - HVACR Designer Tips (Page 26) Engineered Systems - March 2009 - HVACR Designer Tips (Page 27) Engineered Systems - March 2009 - Application Checklist (Page 28) Engineered Systems - March 2009 - Application Checklist (Page 29) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 30) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 31) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 32) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 33) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 34) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 35) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 36) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 37) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 38) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 39) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 40) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 41) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 42) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 43) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 44) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 45) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 46) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 47) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 48) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 49) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 50) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 51) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 52) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 53) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 54) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 55) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 56) Engineered Systems - March 2009 - Glossary (Page 57) Engineered Systems - March 2009 - Classifieds (Page 58) Engineered Systems - March 2009 - Classifieds (Page 59) Engineered Systems - March 2009 - Classifieds (Page 60) Engineered Systems - March 2009 - Advertiser Index (Page 61) Engineered Systems - March 2009 - Tomorrow’s Environment (Page 62) Engineered Systems - March 2009 - Tomorrow’s Environment (Page Cover3) Engineered Systems - March 2009 - Tomorrow’s Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.