Engineered Systems - March 2009 - (Page 41) www.dedietrichboilers.com Basics For Absorption Chillers 1 Condensor 0.10 0.09 0.08 2 Expansion 0.07 0.06 Pressure (ATM) 0.05 0.04 0.03 4 Absorber 0.02 3 Evaporator 0.01 0 0 40 60 80 100 120 140 160 180 200 220 240 260 ˚F 5 Generator concentrator As the Boiler Should Be!!! 6 Solution heat exchanger GT SERIES NEAR CONDENSING CAST IRON BOILERS Diagram 1. Single-effect Duhring diagram. • Evaporator waterside fouling factor: 0.0001 • Tube-side fouling factor (steam): 0.000 (indirect fired) • Tube-side fouling factor (hot water): 0.0001 (indirect fired) It is very important to understand that chillers rarely operate at their maximum capacity. ARI used typical building types and operations in 29 different cities to develop a chiller loading profile during a typical year. The resulting chiller loading profile is at 100% capacity about 1% of the time, 75% capacity about 42% of the time, 50% capacity about 45% of the time, and 25% capacity about 12% of the time. These values are incorporated into the IPLV equations, which are: IPLV = 0.01A + 0.42B + 0.45C + 0.12D (coefficient of performance [COP]) where: A = COP at 100% capacity (condenser water at 85° ) B = COP at 75% capacity (condenser water at 77.5° ) C = COP at 50% capacity (condenser water at 70°) D = COP at 25% capacity (condenser water at 70°) IPLV = 1 (MBtuh/ton) where: (0.01/A) + (0.42/B) + (0.45/C) + (0.12/D) A = MBtuh/ton at 100% capacity (condenser water at 85° ) B = MBtuh/ton at 75% capacity (condenser water at 77.5°) C = MBtuh/ton at 50% capacity (condenser water at 70°) D = MBtuh/ton at 25% capacity (condenser water at 70°) When evaluating different chiller energy usage, the IPLV provides the most accurate average chiller energy usage. When the known parameters are different than prescribed above, the c ABSOLUTELY THERMAL SHOCK PROOF!!! GUARANTEED!! c True Eutectic Cast Iron = flexibility in the casting c +88% Thermal Efficiency c Lowest Pressure Drops c Best Warranty in the Industry c 33 Models Ranging from 94 to 6,200 MBH c 90 PSI Working Pressure c Low NOx Burners Available c In Stock, Next Day Delivery!! WHEN YOU TH!NK BOILERS TH!NK Input 219 at www.esmagazine.com/instantproductinfo w w w. esmag a zine . c o m 41 http://www.dedietrichboilers.com http://www.dedietrichboilers.com http://www.esmagazine.com/instantproductinfo http://www.esmagazine.com
Table of Contents Feed for the Digital Edition of Engineered Systems - March 2009 Engineered Systems - March 2009 Contents Editor’s Note Back2Basics Case In Point Commissioning Building Automation HVACR Designer Tips Application Checklist Teaching An Old School New Tricks Basics For Absorption Chillers A New Haven For Sustainable Schools Glossary Classifieds Advertiser Index Tomorrow’s Environment Engineered Systems - March 2009 Engineered Systems - March 2009 - (Page Intro) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page Cover1) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page Cover2) Engineered Systems - March 2009 - Engineered Systems - March 2009 (Page 3) Engineered Systems - March 2009 - Contents (Page 4) Engineered Systems - March 2009 - Contents (Page 5) Engineered Systems - March 2009 - Contents (Page 6) Engineered Systems - March 2009 - Contents (Page 7) Engineered Systems - March 2009 - Editor’s Note (Page 8) Engineered Systems - March 2009 - Editor’s Note (Page 9) Engineered Systems - March 2009 - Back2Basics (Page 10) Engineered Systems - March 2009 - Back2Basics (Page 11) Engineered Systems - March 2009 - Back2Basics (Page 12) Engineered Systems - March 2009 - Back2Basics (Page 13) Engineered Systems - March 2009 - Case In Point (Page 14) Engineered Systems - March 2009 - Case In Point (Page 15) Engineered Systems - March 2009 - Case In Point (Page 16) Engineered Systems - March 2009 - Case In Point (Page 17) Engineered Systems - March 2009 - Case In Point (Page 18) Engineered Systems - March 2009 - Case In Point (Page 19) Engineered Systems - March 2009 - Case In Point (Page 20) Engineered Systems - March 2009 - Case In Point (Page 21) Engineered Systems - March 2009 - Commissioning (Page 22) Engineered Systems - March 2009 - Commissioning (Page 23) Engineered Systems - March 2009 - Building Automation (Page 24) Engineered Systems - March 2009 - Building Automation (Page 25) Engineered Systems - March 2009 - HVACR Designer Tips (Page 26) Engineered Systems - March 2009 - HVACR Designer Tips (Page 27) Engineered Systems - March 2009 - Application Checklist (Page 28) Engineered Systems - March 2009 - Application Checklist (Page 29) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 30) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 31) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 32) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 33) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 34) Engineered Systems - March 2009 - Teaching An Old School New Tricks (Page 35) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 36) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 37) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 38) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 39) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 40) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 41) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 42) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 43) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 44) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 45) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 46) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 47) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 48) Engineered Systems - March 2009 - Basics For Absorption Chillers (Page 49) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 50) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 51) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 52) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 53) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 54) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 55) Engineered Systems - March 2009 - A New Haven For Sustainable Schools (Page 56) Engineered Systems - March 2009 - Glossary (Page 57) Engineered Systems - March 2009 - Classifieds (Page 58) Engineered Systems - March 2009 - Classifieds (Page 59) Engineered Systems - March 2009 - Classifieds (Page 60) Engineered Systems - March 2009 - Advertiser Index (Page 61) Engineered Systems - March 2009 - Tomorrow’s Environment (Page 62) Engineered Systems - March 2009 - Tomorrow’s Environment (Page Cover3) Engineered Systems - March 2009 - Tomorrow’s Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.