Mission Critical - Winter 2008 - (Page 14) Digital Power Continued from page 12 solutions are available through a nationwide network of Vykon Distributors. ActiveLogix Charlotte, NC 704-578-9776 vykonsales@activelogix.com Advanced Power Control, Inc. Newark, DE 302-368-0443 vykonsales@adv-power.com BITS Waukesha, WI 877-334-9333 vykonsales@envsysinc.com Cochrane Supply Madison Heights, MI 248-588-9260 vykonsales@ cochranesupply.com Controlco Automation Distributors Concord, CA 925-602-7728 vykonsales@controlco.com Control Consultants, Inc. Weymouth, MA 781-335-8353 vykonsales@ controlconsultantsinc.com E.C. Smyers Co. Pittsburgh, PA 412-471-3222 vykonsales@smyers.com Industrial Control Distributors Wanamassa, NJ 732-918-9000 vykonsales@icdmail.com Jackson Control Company, Inc. Indianapolis, IN 800-772-9859 vykonsales@jacksoncontrol.com Long Building Technology Englewood, CO 303-975-2100 vykonsales@long.com Minvalco, Inc. Minneapolis, MN 952-920-0131 vykonsales@minvalco.com Temperature Control Systems, Inc. Dallas, TX 214-343-1444 vykonsales@tempconsys.com Universal Supply Group, Inc. Hawthorne, NJ 973-427-3320 vykonsales@usginc.com repository and to continually educate and train employees while enhancing and sharing “lesson learned” experiences. A comprehensive training program could include: • Providing fundamental training on facility electrical, mechanical, and life safety systems • Determining staff qualification criteria • Identifying training topics and developing specific modules • Creating testing content and certification methods • Maintaining employee training records and ongoing training requirements Prudent business practice recognizes the need to plan for employee succession, unexpected staff departure, orientation/training of new employees, as well as education of seasoned employees. An education and training program, coupled with a document management system, can address these concerns. Site-specific training courses can be developed to target subjects such as UPS switching procedures, emergency generator operation and testing, company policies and procedures, safety, and critical environment work rules. In the financial services industry, education and training that is standardized, comprehensive, and focused on the job at hand will create a pool of talented individuals possessing the knowledge and information necessary to solve problems during emergencies. This will lead to shorter and less frequent unplanned downtime. Documentation is essential not only to facilitate the ongoing education and training requirements of a company’s personnel, but also to maintain safety and to minimize risk to the company, assuring the integrity of a robust mission critical infrastructure and the institution’s bottom line. A living document system can produce a “database” of perpetually refreshed knowledge, providing the level of granularity necessary to operate a mission critical infrastructure. Such a system should be supplemented with a staff training and development program. Keeping the ever-changing document and training programs current can then be addressed each time a capital project is completed or an infrastructure change is made. Accurate and up-to-date information provides first responders with the intelligence and support necessary to make informed decisions during critical events, as well as allow for employee succession planning. The short-term dollars saved today by eliminating documentation and education/training program will result in an exponential monetary loss tomorrow. ■ ◗ REPRINTS OF THIS ARTICLE are available by contacting Jill DeVries at devriesj@bnpmedia.com or at 248-244-1726. FREE INFO: WRITE 32 14 | Mission Critical Winter 2008 4/13/07 10:20:23 AM ESM05074TridLH.indd 1 http://cochranesupply.com http://controlconsultantsinc.com
Table of Contents Feed for the Digital Edition of Mission Critical - Winter 2008 Mission Critical - Winter 2008 Table of Contents Editorial: What Have We Been Doing? Cronin’s Workshop: Imagining the Perfect Data Center Power And Cooling Solution Digital Power: The Next Edge in Business Resiliency Zinc Whiskers: Keeping Up With The Green Movement Mission Critical Care: Shipping, Staging, and Installation Legal Perspectives: “A Reliable Energy Supply Is Key to Data Center Success” Continued Payback, Instant Protection Beyond the Nines The Green Information Technology Revolution Health Care Network Offers Glimpse of the Future of Backup Power High-Density Data Centers – Discuss, Design, Deploy High Performance Data Centers Call for Innovative Cooling Techniques More Data in the Data Center Five Considerations for Powering Data Center Racks New Products Industry News Events Classifieds Letters Ad Index Datacenter Wiki: wiki-Mission Critical Mission Critical - Winter 2008 Mission Critical - Winter 2008 - Mission Critical - Winter 2008 (Page 1) Mission Critical - Winter 2008 - Mission Critical - Winter 2008 (Page 2) Mission Critical - Winter 2008 - Table of Contents (Page 3) Mission Critical - Winter 2008 - Table of Contents (Page 4) Mission Critical - Winter 2008 - Table of Contents (Page 5) Mission Critical - Winter 2008 - Editorial: What Have We Been Doing? (Page 6) Mission Critical - Winter 2008 - Editorial: What Have We Been Doing? (Page 7) Mission Critical - Winter 2008 - Cronin’s Workshop: Imagining the Perfect Data Center Power And Cooling Solution (Page 8) Mission Critical - Winter 2008 - Cronin’s Workshop: Imagining the Perfect Data Center Power And Cooling Solution (Page 9) Mission Critical - Winter 2008 - Cronin’s Workshop: Imagining the Perfect Data Center Power And Cooling Solution (Page 10) Mission Critical - Winter 2008 - Cronin’s Workshop: Imagining the Perfect Data Center Power And Cooling Solution (Page 11) Mission Critical - Winter 2008 - Digital Power: The Next Edge in Business Resiliency (Page 12) Mission Critical - Winter 2008 - Digital Power: The Next Edge in Business Resiliency (Page 13) Mission Critical - Winter 2008 - Digital Power: The Next Edge in Business Resiliency (Page 14) Mission Critical - Winter 2008 - Digital Power: The Next Edge in Business Resiliency (Page 15) Mission Critical - Winter 2008 - Zinc Whiskers: Keeping Up With The Green Movement (Page 16) Mission Critical - Winter 2008 - Zinc Whiskers: Keeping Up With The Green Movement (Page 17) Mission Critical - Winter 2008 - Zinc Whiskers: Keeping Up With The Green Movement (Page 18) Mission Critical - Winter 2008 - Zinc Whiskers: Keeping Up With The Green Movement (Page 19) Mission Critical - Winter 2008 - Mission Critical Care: Shipping, Staging, and Installation (Page 20) Mission Critical - Winter 2008 - Mission Critical Care: Shipping, Staging, and Installation (Page 21) Mission Critical - Winter 2008 - Mission Critical Care: Shipping, Staging, and Installation (Page 22) Mission Critical - Winter 2008 - Mission Critical Care: Shipping, Staging, and Installation (Page 23) Mission Critical - Winter 2008 - Legal Perspectives: “A Reliable Energy Supply Is Key to Data Center Success” (Page 24) Mission Critical - Winter 2008 - Legal Perspectives: “A Reliable Energy Supply Is Key to Data Center Success” (Page 25) Mission Critical - Winter 2008 - Legal Perspectives: “A Reliable Energy Supply Is Key to Data Center Success” (Page 26) Mission Critical - Winter 2008 - Legal Perspectives: “A Reliable Energy Supply Is Key to Data Center Success” (Page 27) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 28) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 29) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 30) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 31) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 32) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 33) Mission Critical - Winter 2008 - Beyond the Nines (Page 34) Mission Critical - Winter 2008 - Beyond the Nines (Page 35) Mission Critical - Winter 2008 - Beyond the Nines (Page 36) Mission Critical - Winter 2008 - Beyond the Nines (Page 37) Mission Critical - Winter 2008 - Beyond the Nines (Page 38) Mission Critical - Winter 2008 - Beyond the Nines (Page 39) Mission Critical - Winter 2008 - Beyond the Nines (Page 40) Mission Critical - Winter 2008 - Beyond the Nines (Page 41) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 42) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 43) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 44) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 45) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 46) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 47) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 48) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 49) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 50) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 51) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 52) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 53) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 54) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 55) Mission Critical - Winter 2008 - High-Density Data Centers – Discuss, Design, Deploy (Page 56) Mission Critical - Winter 2008 - High-Density Data Centers – Discuss, Design, Deploy (Page 57) Mission Critical - Winter 2008 - High-Density Data Centers – Discuss, Design, Deploy (Page 58) Mission Critical - Winter 2008 - High-Density Data Centers – Discuss, Design, Deploy (Page 59) Mission Critical - Winter 2008 - High Performance Data Centers Call for Innovative Cooling Techniques (Page 60) Mission Critical - Winter 2008 - High Performance Data Centers Call for Innovative Cooling Techniques (Page 61) Mission Critical - Winter 2008 - High Performance Data Centers Call for Innovative Cooling Techniques (Page 62) Mission Critical - Winter 2008 - High Performance Data Centers Call for Innovative Cooling Techniques (Page 63) Mission Critical - Winter 2008 - More Data in the Data Center (Page 64) Mission Critical - Winter 2008 - More Data in the Data Center (Page 65) Mission Critical - Winter 2008 - More Data in the Data Center (Page 66) Mission Critical - Winter 2008 - Five Considerations for Powering Data Center Racks (Page 67) Mission Critical - Winter 2008 - Five Considerations for Powering Data Center Racks (Page 68) Mission Critical - Winter 2008 - Five Considerations for Powering Data Center Racks (Page 69) Mission Critical - Winter 2008 - New Products (Page 70) Mission Critical - Winter 2008 - New Products (Page 71) Mission Critical - Winter 2008 - New Products (Page 72) Mission Critical - Winter 2008 - Events (Page 73) Mission Critical - Winter 2008 - Events (Page 74) Mission Critical - Winter 2008 - Classifieds (Page 75) Mission Critical - Winter 2008 - Classifieds (Page 76) Mission Critical - Winter 2008 - Ad Index (Page 77) Mission Critical - Winter 2008 - Datacenter Wiki: wiki-Mission Critical (Page 78) Mission Critical - Winter 2008 - Datacenter Wiki: wiki-Mission Critical (Page 79) Mission Critical - Winter 2008 - Datacenter Wiki: wiki-Mission Critical (Page 80)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.