Mission Critical - Winter 2008 - (Page 30) Instant Payback continued The front desk and lobby of Quilogy’s corporate headquarters in Saint Charles, MO “The hot air is then exhausted out the back of each rack and allowed to rise to the ceiling where it is returned to the air handler for cooling. The high ceilings in the room make the Trane cooling system even more effective. These ceilings are one of the benefits of being in an old building. Thus we have both a hot/cold horizontal aisle arrangement, as well as hot/cold vertical planes.” In late 2005, Quilogy moved its data center from a smaller room of the building to a new and significantly larger area. At the same time, the capacity of the data center was expanded to three times that of the previous one in terms of power capacity, redundant cooling capacity, and the floor space to add more racks in the future. Quilogy’s previous backup generator was a 25-kilowatt Generac Guardian natural gas-model that had been in service since 2000, which had performed well during outages. The new data center required a new larger unit. Both the facility design firm and a general contractor recommended diesel generators from other manufacturers, but Groh wanted to consider other options. After learning about the Generac QT Series, he was convinced that it was a superior solution, combining the numerous advantages of natural gas (no refueling, storage, spillage, spoilage, or odor) with a lower capital cost. “Our experience with the gaseous-fueled Guardian unit was favorable, so there was no reason to make a change,” Groh says. “By selecting the QT model, we easily saved more than $10,000 when compared to the diesel alternatives. It was an easy decision.” The Generac QT 130 kilowatt model has capacity to satisfy Quilogy’s evolving power requirements. The QT 130 can handle the upgraded 400-A, 208-V three phase electrical requirements. With Quilogy located in an historical area with shops and offices nearby, sound was another important factor in the decision to purchase the QT model. Because of its sound-attenuated enclosure and advanced airflow design, the generator is among the quietest in its class when operating under load. During weekly exercise, the Quiet-Test feature operates the gen set at a slower speed, making it even quieter. “Our generator is so quiet during the self-test that a person can not tell that it’s running without standing directly next to the unit,” says Mike Howells. Generac offers its QT products through several distribution channels. Quilogy’s purchase was made through Chicago-area distributor A.P. Electric. A new concrete Date Friday, April 14, 2006 Tuesday, April 18, 2006 Wednesday, July 19, 2006 Friday, July 21, 2006 Wednesday, August 9, 2006 Saturday, August 26, 2006 Sunday, October 8, 2006 Friday, December 1, 2006 Thursday, January 11, 2007 Saturday, January 13, 2007 Monday, August 13, 2007 Wednesday, August 29, 2007 Power outages averted at the Quilogy facility. Duration 3.7 hours .5 hours .4 hours 6.1 hours 0.4 hours 0.4 hours 4.6 hours 0.3 hours 0.4 hours 4.8 hours 0.2 hours 1.8 hours Cause Power line failure due to heat Severe weather Severe weather Severe weather Unknown Unknown Animal contact Severe ice storm Unknown Severe ice storm Severe weather Severe weather 30 | Mission Critical Winter 2008
Table of Contents Feed for the Digital Edition of Mission Critical - Winter 2008 Mission Critical - Winter 2008 Table of Contents Editorial: What Have We Been Doing? Cronin’s Workshop: Imagining the Perfect Data Center Power And Cooling Solution Digital Power: The Next Edge in Business Resiliency Zinc Whiskers: Keeping Up With The Green Movement Mission Critical Care: Shipping, Staging, and Installation Legal Perspectives: “A Reliable Energy Supply Is Key to Data Center Success” Continued Payback, Instant Protection Beyond the Nines The Green Information Technology Revolution Health Care Network Offers Glimpse of the Future of Backup Power High-Density Data Centers – Discuss, Design, Deploy High Performance Data Centers Call for Innovative Cooling Techniques More Data in the Data Center Five Considerations for Powering Data Center Racks New Products Industry News Events Classifieds Letters Ad Index Datacenter Wiki: wiki-Mission Critical Mission Critical - Winter 2008 Mission Critical - Winter 2008 - Mission Critical - Winter 2008 (Page 1) Mission Critical - Winter 2008 - Mission Critical - Winter 2008 (Page 2) Mission Critical - Winter 2008 - Table of Contents (Page 3) Mission Critical - Winter 2008 - Table of Contents (Page 4) Mission Critical - Winter 2008 - Table of Contents (Page 5) Mission Critical - Winter 2008 - Editorial: What Have We Been Doing? (Page 6) Mission Critical - Winter 2008 - Editorial: What Have We Been Doing? (Page 7) Mission Critical - Winter 2008 - Cronin’s Workshop: Imagining the Perfect Data Center Power And Cooling Solution (Page 8) Mission Critical - Winter 2008 - Cronin’s Workshop: Imagining the Perfect Data Center Power And Cooling Solution (Page 9) Mission Critical - Winter 2008 - Cronin’s Workshop: Imagining the Perfect Data Center Power And Cooling Solution (Page 10) Mission Critical - Winter 2008 - Cronin’s Workshop: Imagining the Perfect Data Center Power And Cooling Solution (Page 11) Mission Critical - Winter 2008 - Digital Power: The Next Edge in Business Resiliency (Page 12) Mission Critical - Winter 2008 - Digital Power: The Next Edge in Business Resiliency (Page 13) Mission Critical - Winter 2008 - Digital Power: The Next Edge in Business Resiliency (Page 14) Mission Critical - Winter 2008 - Digital Power: The Next Edge in Business Resiliency (Page 15) Mission Critical - Winter 2008 - Zinc Whiskers: Keeping Up With The Green Movement (Page 16) Mission Critical - Winter 2008 - Zinc Whiskers: Keeping Up With The Green Movement (Page 17) Mission Critical - Winter 2008 - Zinc Whiskers: Keeping Up With The Green Movement (Page 18) Mission Critical - Winter 2008 - Zinc Whiskers: Keeping Up With The Green Movement (Page 19) Mission Critical - Winter 2008 - Mission Critical Care: Shipping, Staging, and Installation (Page 20) Mission Critical - Winter 2008 - Mission Critical Care: Shipping, Staging, and Installation (Page 21) Mission Critical - Winter 2008 - Mission Critical Care: Shipping, Staging, and Installation (Page 22) Mission Critical - Winter 2008 - Mission Critical Care: Shipping, Staging, and Installation (Page 23) Mission Critical - Winter 2008 - Legal Perspectives: “A Reliable Energy Supply Is Key to Data Center Success” (Page 24) Mission Critical - Winter 2008 - Legal Perspectives: “A Reliable Energy Supply Is Key to Data Center Success” (Page 25) Mission Critical - Winter 2008 - Legal Perspectives: “A Reliable Energy Supply Is Key to Data Center Success” (Page 26) Mission Critical - Winter 2008 - Legal Perspectives: “A Reliable Energy Supply Is Key to Data Center Success” (Page 27) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 28) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 29) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 30) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 31) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 32) Mission Critical - Winter 2008 - Continued Payback, Instant Protection (Page 33) Mission Critical - Winter 2008 - Beyond the Nines (Page 34) Mission Critical - Winter 2008 - Beyond the Nines (Page 35) Mission Critical - Winter 2008 - Beyond the Nines (Page 36) Mission Critical - Winter 2008 - Beyond the Nines (Page 37) Mission Critical - Winter 2008 - Beyond the Nines (Page 38) Mission Critical - Winter 2008 - Beyond the Nines (Page 39) Mission Critical - Winter 2008 - Beyond the Nines (Page 40) Mission Critical - Winter 2008 - Beyond the Nines (Page 41) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 42) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 43) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 44) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 45) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 46) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 47) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 48) Mission Critical - Winter 2008 - The Green Information Technology Revolution (Page 49) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 50) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 51) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 52) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 53) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 54) Mission Critical - Winter 2008 - Health Care Network Offers Glimpse of the Future of Backup Power (Page 55) Mission Critical - Winter 2008 - High-Density Data Centers – Discuss, Design, Deploy (Page 56) Mission Critical - Winter 2008 - High-Density Data Centers – Discuss, Design, Deploy (Page 57) Mission Critical - Winter 2008 - High-Density Data Centers – Discuss, Design, Deploy (Page 58) Mission Critical - Winter 2008 - High-Density Data Centers – Discuss, Design, Deploy (Page 59) Mission Critical - Winter 2008 - High Performance Data Centers Call for Innovative Cooling Techniques (Page 60) Mission Critical - Winter 2008 - High Performance Data Centers Call for Innovative Cooling Techniques (Page 61) Mission Critical - Winter 2008 - High Performance Data Centers Call for Innovative Cooling Techniques (Page 62) Mission Critical - Winter 2008 - High Performance Data Centers Call for Innovative Cooling Techniques (Page 63) Mission Critical - Winter 2008 - More Data in the Data Center (Page 64) Mission Critical - Winter 2008 - More Data in the Data Center (Page 65) Mission Critical - Winter 2008 - More Data in the Data Center (Page 66) Mission Critical - Winter 2008 - Five Considerations for Powering Data Center Racks (Page 67) Mission Critical - Winter 2008 - Five Considerations for Powering Data Center Racks (Page 68) Mission Critical - Winter 2008 - Five Considerations for Powering Data Center Racks (Page 69) Mission Critical - Winter 2008 - New Products (Page 70) Mission Critical - Winter 2008 - New Products (Page 71) Mission Critical - Winter 2008 - New Products (Page 72) Mission Critical - Winter 2008 - Events (Page 73) Mission Critical - Winter 2008 - Events (Page 74) Mission Critical - Winter 2008 - Classifieds (Page 75) Mission Critical - Winter 2008 - Classifieds (Page 76) Mission Critical - Winter 2008 - Ad Index (Page 77) Mission Critical - Winter 2008 - Datacenter Wiki: wiki-Mission Critical (Page 78) Mission Critical - Winter 2008 - Datacenter Wiki: wiki-Mission Critical (Page 79) Mission Critical - Winter 2008 - Datacenter Wiki: wiki-Mission Critical (Page 80)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.