Pollution Engineering - November 2008 - (Page 39) Why tie your project to one method, one material, or uncertain completion, when you can buy all possible solutions and completion for one price? ERFS is the industry founder of Pay-for-Performance in-situ remediation since 1998. ERFS has the experience, techniques, and financial capability to design and deliver state-of-the-art innovative remediation of groundwater and soil. We develop and build our own specialized equipment. ERFS approaches each project with an extensive “tool-box” of capabilities and technologies customized per site; extensive planning on possible field adjustments; technology substitutions– with no additional charge; real-time monitoring, and senior staff support to yield the best results quickly. ERFS offers the following services: I High volume reagent injection through direct push piping, if requested under our ProxiOne services. Chemical or Biological Treatment – ERFS has developed reagent blends and sequences based on results of thousands of injections. ERFS has used 126 different remediation compounds in 9 years. Our experience includes: I Contracting – ERFS leads the industry in contracting flexibility where ”you can have it your way”. I Many forms of Fenton's Reagent – customized blends of catalysts and oxidizer sequences which vary throughout the project – optimal results with the elimination of heat and pressure by our techniques. Sodium persulfate – applied using elevated pH, or ferrous sulfate, or hydrogen peroxide. Potassium Permanganate – injected or recirculated. BioAug – high performance customized conditioner blends and DHE inoculum injected or recirculated. Liquid Biostimulation – highest level of DO enhancement without dependence on single method devices. Nano Iron– advanced injection and instrumentation methods. Metals precipitation – insoluble precipitates formed via geo-chemical condition shifts to remove dissolved lead and other metals. ERFS' SiteVision SM – based on advanced soil resistivity surveys to track real-time reagent migration and subsurface flow. Can be ordered as a separate service. ERFS' Signature SM – GPR-like signal generation mapping of ERFS physical devices and materials. Deflection Point Surveying – standard surveying techniques. Groundwater – ORP, DO, pH, temperature, specific conductance, NAPL. Vapor Head Space – LEL, PID, Oxygen, Carbon Dioxide. I Pay-for-Performance Lump Sum Contracts – no need for cost cap insurance, pay for results. ProxiOne – pick elements of our technologies, equipment, instrumentation or field staff to implement your design on a time and material basis for less than your costs. SM I I I I I EndPoint Property Services SM – ERFS can finance remediation or buy your contaminated property. ERFS also develops properties. I I Design – ERFS' P.E., P.G. and Ph.D. level staff prepare and design the technical scope and respond to review issues. Call us for: I I Bid Specifications, Bid Responses, and Remediation Work Plans I Injection Systems – ERFS combines and matches the injection system to meet project-specific needs using combinations of: I Propagations SM – inert injection structures installed through a 2 inch pipe at any depth; accomplish the work of 9 to 36 wells to form a single injection point; extensive experience in use around live tanks, retail stores, houses, office buildings, manufacturing plants, residences. Ideal for under buildings and roads. ConductivPlanz SM – Propagations supplemented with passive or active biological or chemical treatment reagents; can be nested for vertical columns of soil. Programmable Release Processors SM – automated subsurface injectors. Laterals SM– shallow soil treatment system. RECORS Wells SM – recirculating well design used for biological and chemical reagent circulation either top-to-bottom or bottom-to-top flow. ElectroPeroxidation System SM – for PCB remediation. Tension System – for fractured bedrock. SM I I I I Delivery – Our highly experienced field teams are the safest and best trained in the industry. OSHA trained and successfully OSHA inspected. 100% safety record. ERFS maintains a full inventory across the United States, plus international experience. I I I There is no other remediation company that can offer this level of technology, options and business solutions for one price. Most of our customers are repeat customers. The best way to get to know us is to see the level of solutions we will present to you for your project. Speak to a specialist direct! Need a bid? Have a question? Just call 866-855-ERFS (3737) to speak with a Client Services Representative, visit our website at www.erfs.com or email us at erfs_solutions@erfs.com for more information and free quotations. I I I Conversion of Existing System– convert existing recovery wells, SVE wells, etc. Supplemental Injection Wells – PVC injectors installed by direct push or auger. I Circle No. 51 http://www.erfs.com
Table of Contents Feed for the Digital Edition of Pollution Engineering - November 2008 Pollution Engineering - November 2008 Contents The Editor's Desk EnviroNews PE Events Legal Lookout Casebook Canada Environment Management The Green Files Waste Island Phase I ESAs and Vapor Intrusion Meeting the Mercury Target Wet ESPs - The Sky's the Limit Most Successful IFAT China Ever Thermoplastic to the Rescue Install a Trench Without Open Excavations Remediate Impacted Soils Without Accumulation of Metabolites Apply an Alternative to Wet ESP Solve These Common Pump Problems Minimize Risks Handling Ammonia Monitor International Regulatory Developments for Audits Skim Oil and Save Prevent Chemical Vapor Intrusion Spill Control and Containment Products Pumps and Systems Equipment PE Products Classified Marketplace Advertisers Index State Rules Pollution Engineering - November 2008 Pollution Engineering - November 2008 - Pollution Engineering - November 2008 (Page Cover1) Pollution Engineering - November 2008 - Pollution Engineering - November 2008 (Page Cover2) Pollution Engineering - November 2008 - Pollution Engineering - November 2008 (Page 3) Pollution Engineering - November 2008 - Contents (Page 4) Pollution Engineering - November 2008 - Contents (Page 5) Pollution Engineering - November 2008 - Contents (Page 6) Pollution Engineering - November 2008 - The Editor's Desk (Page 7) Pollution Engineering - November 2008 - The Editor's Desk (Page 8) Pollution Engineering - November 2008 - PE Events (Page 9) Pollution Engineering - November 2008 - PE Events (Page 10) Pollution Engineering - November 2008 - PE Events (Page 11) Pollution Engineering - November 2008 - PE Events (Page 12) Pollution Engineering - November 2008 - PE Events (Page 13) Pollution Engineering - November 2008 - PE Events (Page 14) Pollution Engineering - November 2008 - Legal Lookout (Page 15) Pollution Engineering - November 2008 - Legal Lookout (Page 16) Pollution Engineering - November 2008 - Casebook Canada (Page 17) Pollution Engineering - November 2008 - Casebook Canada (Page 18) Pollution Engineering - November 2008 - Environment Management (Page 19) Pollution Engineering - November 2008 - Environment Management (Page 20) Pollution Engineering - November 2008 - The Green Files (Page 21) Pollution Engineering - November 2008 - The Green Files (Page 22) Pollution Engineering - November 2008 - The Green Files (Page 23) Pollution Engineering - November 2008 - Waste Island (Page 24) Pollution Engineering - November 2008 - Waste Island (Page 25) Pollution Engineering - November 2008 - Waste Island (Page 26) Pollution Engineering - November 2008 - Waste Island (Page 27) Pollution Engineering - November 2008 - Waste Island (Page 28) Pollution Engineering - November 2008 - Phase I ESAs and Vapor Intrusion (Page 29) Pollution Engineering - November 2008 - Phase I ESAs and Vapor Intrusion (Page 30) Pollution Engineering - November 2008 - Phase I ESAs and Vapor Intrusion (Page 31) Pollution Engineering - November 2008 - Meeting the Mercury Target (Page 32) Pollution Engineering - November 2008 - Meeting the Mercury Target (Page 33) Pollution Engineering - November 2008 - Meeting the Mercury Target (Page 34) Pollution Engineering - November 2008 - Meeting the Mercury Target (Page 35) Pollution Engineering - November 2008 - Meeting the Mercury Target (Page 36) Pollution Engineering - November 2008 - Meeting the Mercury Target (Page 37) Pollution Engineering - November 2008 - Meeting the Mercury Target (Page 38) Pollution Engineering - November 2008 - Meeting the Mercury Target (Page 39) Pollution Engineering - November 2008 - Wet ESPs - The Sky's the Limit (Page 40) Pollution Engineering - November 2008 - Wet ESPs - The Sky's the Limit (Page 41) Pollution Engineering - November 2008 - Wet ESPs - The Sky's the Limit (Page 42) Pollution Engineering - November 2008 - Wet ESPs - The Sky's the Limit (Page 43) Pollution Engineering - November 2008 - Wet ESPs - The Sky's the Limit (Page 44) Pollution Engineering - November 2008 - Wet ESPs - The Sky's the Limit (Page 45) Pollution Engineering - November 2008 - Most Successful IFAT China Ever (Page 46) Pollution Engineering - November 2008 - Thermoplastic to the Rescue (Page 47) Pollution Engineering - November 2008 - Thermoplastic to the Rescue (Page 48) Pollution Engineering - November 2008 - Install a Trench Without Open Excavations (Page 49) Pollution Engineering - November 2008 - Install a Trench Without Open Excavations (Page 50) Pollution Engineering - November 2008 - Remediate Impacted Soils Without Accumulation of Metabolites (Page 51) Pollution Engineering - November 2008 - Remediate Impacted Soils Without Accumulation of Metabolites (Page 52) Pollution Engineering - November 2008 - Remediate Impacted Soils Without Accumulation of Metabolites (Page 53) Pollution Engineering - November 2008 - Apply an Alternative to Wet ESP (Page 54) Pollution Engineering - November 2008 - Apply an Alternative to Wet ESP (Page 55) Pollution Engineering - November 2008 - Apply an Alternative to Wet ESP (Page 56) Pollution Engineering - November 2008 - Solve These Common Pump Problems (Page 57) Pollution Engineering - November 2008 - Solve These Common Pump Problems (Page 58) Pollution Engineering - November 2008 - Minimize Risks Handling Ammonia (Page 59) Pollution Engineering - November 2008 - Monitor International Regulatory Developments for Audits (Page 60) Pollution Engineering - November 2008 - Skim Oil and Save (Page 61) Pollution Engineering - November 2008 - Prevent Chemical Vapor Intrusion (Page 62) Pollution Engineering - November 2008 - Prevent Chemical Vapor Intrusion (Page 63) Pollution Engineering - November 2008 - Prevent Chemical Vapor Intrusion (Page 64) Pollution Engineering - November 2008 - Prevent Chemical Vapor Intrusion (Page 65) Pollution Engineering - November 2008 - Pumps and Systems Equipment (Page 66) Pollution Engineering - November 2008 - PE Products (Page 67) Pollution Engineering - November 2008 - PE Products (Page 68) Pollution Engineering - November 2008 - Classified Marketplace (Page 69) Pollution Engineering - November 2008 - Classified Marketplace (Page 70) Pollution Engineering - November 2008 - Classified Marketplace (Page 71) Pollution Engineering - November 2008 - Classified Marketplace (Page 72) Pollution Engineering - November 2008 - Advertisers Index (Page 73) Pollution Engineering - November 2008 - State Rules (Page 74) Pollution Engineering - November 2008 - State Rules (Page Cover3) Pollution Engineering - November 2008 - State Rules (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.