Conformity Magazine - September 2007 - (Page 16) links either transmitted or received the RF power via fiber to minimize signal loss over large distances. A photo of this system is shown in Figure 2 for a typical setup. Data Processing in Time Domain The data were processed in a multiple-step signal processing sequence that permitted the separation of the desired propagation events. This time-domain processing of densely packed data allows for the efficient manipulation of the OATS transmission loss data to corrected free-space values. The signal processing sequence used to quantify the desired propagation events is shown in Figure 3 and is further described in [9]. The procedure can be summarized in four basic steps: 1. 2. 3. 4. Inverse Fourier transform CW magnitude and phase data, S21, to obtain a time-domain data waveform. Time-gate the insertion loss waveform to isolate the direct path propagation from any scattering events. Fourier transform the time-gated waveform of step 2 back to CW magnitude and phase data, S21. Process this time-gated CW insertion loss data using the two-antenna method and Friis equation to determine the free-space antenna factors. To find the FSAF we used Equation 24 from [7]: AF = 10•log (F/d) + ½ [IL + Corr –16.0 ] (1) with Corr = 0 for free space and the insertion loss term (IL) replaced with the time gated value obtained from the time domain signal processing: IL = | FT {IL gated} | (2) In Equation 2, FT denotes the Fourier transform of the enclosed term. This term is now just the direct signal after the reflected data was removed through time-domain processing. We have neglected the contributions of internal antenna Correction In our August issue, the article entitled The Development of CISPR 22 as the Basic International EMI Standard for Information Technology Equipment includes two tables that may be confusing to readers. The tables, which appear on page 20 of the issue, show limits for measurements above 1 GHz, but the headings for the columns “Average” and “Peak” were erroneously reversed. The corrected tables are printed below: We apologize to our readers for any confusion that this error may have caused. Limits for radiated emissions of Class A ITE at a 3m measurement: Frequency Range [GHz] Average [dBμv/m] 1 to 3 3 to 6 56 60 Peak [dBμv/ m] 76 80 Limits for radiated emissions of Class B ITE at a 3m measurement: Frequency Range [GHz] 1 to 3 3 to 6 Average [dBμv/m] 50 54 Peak [dBμv/m] 70 74 Figure 4: (a) Time-domain waveforms for the DRG antennas, (b) time-domain waveforms for the large DRG antennas, and (c) timedomain waveforms for the biconical antennas 16 Conformity September 2007
Table of Contents Feed for the Digital Edition of Conformity Magazine - September 2007 Contents Editor’s Note FCC Extends Disability Access Requirements to VOIP Commission Fines Importer $3 Million Over Non-Compliant TVs FCC Gets Tough on Retailers Over Analog TV Tuner Labeling Analog Cellular Service Sunset Date Reaffirmed Commission Adopts Recommendations of Katrina Panel Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing Editorial Correction ESD Open Forum An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD Practical Advice for Meeting the DFS Testing Requirements of the FCC The EMC Impact of Embedded Software ESD Design Buyer's Guide Tate Renominated to the FCC EPA Releases Report on U.S. Electronic Waste Additional Standards For The EU’s Toy Directive Medical Device Manufacturer Enters Consent Order Updated Guidance Document on Laser Products Issued FDA Offers Advice on Defective Heating Pads CPSC Issues China Product Safety Program Report Other CPSC Actions In The News IEC Standards Update Product Reviews Product News UL Standards Update From Our “You Can’t Make This Stuff Up” Department Looking Back: Items from Past Issues of Conformity Advertisers Conformity Magazine - September 2007 Conformity Magazine - September 2007 - (Page Cover1) Conformity Magazine - September 2007 - (Page Cover2) Conformity Magazine - September 2007 - (Page 3) Conformity Magazine - September 2007 - Contents (Page 4) Conformity Magazine - September 2007 - Contents (Page 5) Conformity Magazine - September 2007 - Editor’s Note (Page 6) Conformity Magazine - September 2007 - Editor’s Note (Page 7) Conformity Magazine - September 2007 - Editor’s Note (Page 8) Conformity Magazine - September 2007 - Editor’s Note (Page 9) Conformity Magazine - September 2007 - FCC Gets Tough on Retailers Over Analog TV Tuner Labeling (Page 10) Conformity Magazine - September 2007 - Commission Adopts Recommendations of Katrina Panel (Page 11) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 12) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 13) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 14) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 15) Conformity Magazine - September 2007 - Editorial Correction (Page 16) Conformity Magazine - September 2007 - Editorial Correction (Page 17) Conformity Magazine - September 2007 - Editorial Correction (Page 18) Conformity Magazine - September 2007 - Editorial Correction (Page 19) Conformity Magazine - September 2007 - Editorial Correction (Page 20) Conformity Magazine - September 2007 - Editorial Correction (Page 21) Conformity Magazine - September 2007 - ESD Open Forum (Page 22) Conformity Magazine - September 2007 - ESD Open Forum (Page 23) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 24) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 25) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 26) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 27) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 28) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 29) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 30) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 31) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 32) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 33) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 34) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 35) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 36) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 37) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 38) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 39) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 40) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 41) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 42) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 43) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 44) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 45) Conformity Magazine - September 2007 - ESD Design (Page 46) Conformity Magazine - September 2007 - ESD Design (Page 47) Conformity Magazine - September 2007 - ESD Design (Page 48) Conformity Magazine - September 2007 - ESD Design (Page 49) Conformity Magazine - September 2007 - ESD Design (Page 50) Conformity Magazine - September 2007 - ESD Design (Page 51) Conformity Magazine - September 2007 - ESD Design (Page 52) Conformity Magazine - September 2007 - ESD Design (Page 53) Conformity Magazine - September 2007 - Buyer's Guide (Page 54) Conformity Magazine - September 2007 - Buyer's Guide (Page 55) Conformity Magazine - September 2007 - Buyer's Guide (Page 56) Conformity Magazine - September 2007 - Buyer's Guide (Page 57) Conformity Magazine - September 2007 - Buyer's Guide (Page 58) Conformity Magazine - September 2007 - Buyer's Guide (Page 59) Conformity Magazine - September 2007 - Buyer's Guide (Page 60) Conformity Magazine - September 2007 - Buyer's Guide (Page 61) Conformity Magazine - September 2007 - Buyer's Guide (Page 62) Conformity Magazine - September 2007 - Buyer's Guide (Page 63) Conformity Magazine - September 2007 - Buyer's Guide (Page 64) Conformity Magazine - September 2007 - Buyer's Guide (Page 65) Conformity Magazine - September 2007 - Medical Device Manufacturer Enters Consent Order (Page 66) Conformity Magazine - September 2007 - Other CPSC Actions In The News (Page 67) Conformity Magazine - September 2007 - IEC Standards Update (Page 68) Conformity Magazine - September 2007 - Product Reviews (Page 69) Conformity Magazine - September 2007 - Product News (Page 70) Conformity Magazine - September 2007 - Product News (Page 71) Conformity Magazine - September 2007 - UL Standards Update (Page 72) Conformity Magazine - September 2007 - Looking Back: Items from Past Issues of Conformity (Page 73) Conformity Magazine - September 2007 - Advertisers (Page 74) Conformity Magazine - September 2007 - Advertisers (Page Cover3) Conformity Magazine - September 2007 - Advertisers (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.