Conformity Magazine - September 2007 - (Page 17) reflections and cable reflections, and assumed the radiation aperture is known. Measurement Results Determination of the Time Gate Determination of the time gate was critical in obtaining clean and accurate results. Errors can occur when too much of the data waveform has been truncated. Familiarization with the antenna waveform shape and experimentation with different gate times will reduce this error. Figures 4(a-c) show time-domain waveforms of the three antennas measured at different separations. Nominal times used for gating in this investigation are given in Table 1. Ray-tracing was used to find the direct and ground plane reflected paths. Path times for the direct and primary reflected signal wavelets are given in Table 2. A one ns/ft ratio was used to obtain these values. Upon examining Figures 4(a-c), it can be seen that the DRG has a fairly clean antenna waveform for all the distances measured; due to its relatively short ring-down time. However, the analysis for the two lower frequency antennas is not so simple. Their longer ring-down times cause the direct and ground reflected signal waveforms to be intermingled at the longer separation distances. This required a slight shortening of the time gates for these configurations to obtain usable time-gated data, but with slightly larger errors. The biconical also exhibited an additional time delay when compared to the Figure 5: Comparison of (a) ungated and (b) gated AF differences for the DRG antenna Figure 6: Comparison of (a) ungated and (b) gated AF differences for the large DRG antenna September 2007 Conformity 17 http://www.amphenol-aerospace.com/filtercatalogs http://www.amphenol-aerospace.com/filtercatalogs http://www.amphenol-aerospace.com http://www.amphenol-canada.com
Table of Contents Feed for the Digital Edition of Conformity Magazine - September 2007 Contents Editor’s Note FCC Extends Disability Access Requirements to VOIP Commission Fines Importer $3 Million Over Non-Compliant TVs FCC Gets Tough on Retailers Over Analog TV Tuner Labeling Analog Cellular Service Sunset Date Reaffirmed Commission Adopts Recommendations of Katrina Panel Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing Editorial Correction ESD Open Forum An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD Practical Advice for Meeting the DFS Testing Requirements of the FCC The EMC Impact of Embedded Software ESD Design Buyer's Guide Tate Renominated to the FCC EPA Releases Report on U.S. Electronic Waste Additional Standards For The EU’s Toy Directive Medical Device Manufacturer Enters Consent Order Updated Guidance Document on Laser Products Issued FDA Offers Advice on Defective Heating Pads CPSC Issues China Product Safety Program Report Other CPSC Actions In The News IEC Standards Update Product Reviews Product News UL Standards Update From Our “You Can’t Make This Stuff Up” Department Looking Back: Items from Past Issues of Conformity Advertisers Conformity Magazine - September 2007 Conformity Magazine - September 2007 - (Page Cover1) Conformity Magazine - September 2007 - (Page Cover2) Conformity Magazine - September 2007 - (Page 3) Conformity Magazine - September 2007 - Contents (Page 4) Conformity Magazine - September 2007 - Contents (Page 5) Conformity Magazine - September 2007 - Editor’s Note (Page 6) Conformity Magazine - September 2007 - Editor’s Note (Page 7) Conformity Magazine - September 2007 - Editor’s Note (Page 8) Conformity Magazine - September 2007 - Editor’s Note (Page 9) Conformity Magazine - September 2007 - FCC Gets Tough on Retailers Over Analog TV Tuner Labeling (Page 10) Conformity Magazine - September 2007 - Commission Adopts Recommendations of Katrina Panel (Page 11) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 12) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 13) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 14) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 15) Conformity Magazine - September 2007 - Editorial Correction (Page 16) Conformity Magazine - September 2007 - Editorial Correction (Page 17) Conformity Magazine - September 2007 - Editorial Correction (Page 18) Conformity Magazine - September 2007 - Editorial Correction (Page 19) Conformity Magazine - September 2007 - Editorial Correction (Page 20) Conformity Magazine - September 2007 - Editorial Correction (Page 21) Conformity Magazine - September 2007 - ESD Open Forum (Page 22) Conformity Magazine - September 2007 - ESD Open Forum (Page 23) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 24) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 25) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 26) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 27) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 28) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 29) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 30) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 31) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 32) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 33) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 34) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 35) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 36) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 37) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 38) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 39) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 40) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 41) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 42) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 43) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 44) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 45) Conformity Magazine - September 2007 - ESD Design (Page 46) Conformity Magazine - September 2007 - ESD Design (Page 47) Conformity Magazine - September 2007 - ESD Design (Page 48) Conformity Magazine - September 2007 - ESD Design (Page 49) Conformity Magazine - September 2007 - ESD Design (Page 50) Conformity Magazine - September 2007 - ESD Design (Page 51) Conformity Magazine - September 2007 - ESD Design (Page 52) Conformity Magazine - September 2007 - ESD Design (Page 53) Conformity Magazine - September 2007 - Buyer's Guide (Page 54) Conformity Magazine - September 2007 - Buyer's Guide (Page 55) Conformity Magazine - September 2007 - Buyer's Guide (Page 56) Conformity Magazine - September 2007 - Buyer's Guide (Page 57) Conformity Magazine - September 2007 - Buyer's Guide (Page 58) Conformity Magazine - September 2007 - Buyer's Guide (Page 59) Conformity Magazine - September 2007 - Buyer's Guide (Page 60) Conformity Magazine - September 2007 - Buyer's Guide (Page 61) Conformity Magazine - September 2007 - Buyer's Guide (Page 62) Conformity Magazine - September 2007 - Buyer's Guide (Page 63) Conformity Magazine - September 2007 - Buyer's Guide (Page 64) Conformity Magazine - September 2007 - Buyer's Guide (Page 65) Conformity Magazine - September 2007 - Medical Device Manufacturer Enters Consent Order (Page 66) Conformity Magazine - September 2007 - Other CPSC Actions In The News (Page 67) Conformity Magazine - September 2007 - IEC Standards Update (Page 68) Conformity Magazine - September 2007 - Product Reviews (Page 69) Conformity Magazine - September 2007 - Product News (Page 70) Conformity Magazine - September 2007 - Product News (Page 71) Conformity Magazine - September 2007 - UL Standards Update (Page 72) Conformity Magazine - September 2007 - Looking Back: Items from Past Issues of Conformity (Page 73) Conformity Magazine - September 2007 - Advertisers (Page 74) Conformity Magazine - September 2007 - Advertisers (Page Cover3) Conformity Magazine - September 2007 - Advertisers (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.