Conformity Magazine - September 2007 - (Page 20) expected values. This additional delay is most likely due to its internal cabling and balun. Results of Applying Time Gating Once the insertion data were time-gated and Fourier transformed back to the frequency domain, they were used to find the FSAF of these antennas. We used the free-space Friis equation to determine the antenna factor (AF). The difference due to the various distances and between the gated and ungated data for each antenna was investigated. Figure 5(a, b) shows the differences for the DRG, Figure 6(a, b) for the large DRG and Figure 7(a, b) for the biconicals. The difference data was normalized to the average of the gated data for each antenna. All three antennas exhibit similar improvements in repeatability for different distances with the removal of the ground-reflected signal. The DRG shows the best clustering due to its relatively short pulse waveform. The biconical shows the largest spread of repeatability. This is due to its long pulse waveform and the non-ideal time gating applied to the data at the larger distances. The ungated biconical data show the expected nulls from ground bounce across its frequency range. The biconical data were also compared to the near freespace values used in [1]. The modeled three meter free space insertion loss was used to determine AF. As shown in Figure 7(b) these modeled data compares well to the measured gated values. This comparison indicates that this method would fit well with current EMC standards methods. One additional benefit from the time-domain processing is a lower system noise floor. As seen in Figure 8, there is an improvement of about 20-30 dB in this level. Even the spurious FM and cell phone bands levels have been lowered. Conclusions The use of time-domain signal processing for determining the free-space antenna factors for several EMC antennas has been outlined. Results for different separation distances are compared. Valid results highly depend on correct time-gating to allow for the full direct signal waveform while removing the reflected signals. Reliable and repeatable data can be obtained using this method. Separation of the direct and reflected waveforms provide a unique perspective for this evaluation. Items that affect the outcome of this method include the ring-down time of the antenna and the relation of the direct to the reflected path times. These conditions are favorable when the ring-down time is relatively short compared to the difference in the direct to reflected path times. Favorable conditions allow for improved accuracy in the determination of free-space antenna factors. This method fits well with current EMC standards methods. Visit: www.elgar.com • Call: 858.458.0223 20 CONFORMITY SEPTEMBER 2007 Figure 7: Comparison of (a) ungated and (b) gated AF differences for the biconical antenna http://www.elgar.com http://www.elgar.com
Table of Contents Feed for the Digital Edition of Conformity Magazine - September 2007 Contents Editor’s Note FCC Extends Disability Access Requirements to VOIP Commission Fines Importer $3 Million Over Non-Compliant TVs FCC Gets Tough on Retailers Over Analog TV Tuner Labeling Analog Cellular Service Sunset Date Reaffirmed Commission Adopts Recommendations of Katrina Panel Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing Editorial Correction ESD Open Forum An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD Practical Advice for Meeting the DFS Testing Requirements of the FCC The EMC Impact of Embedded Software ESD Design Buyer's Guide Tate Renominated to the FCC EPA Releases Report on U.S. Electronic Waste Additional Standards For The EU’s Toy Directive Medical Device Manufacturer Enters Consent Order Updated Guidance Document on Laser Products Issued FDA Offers Advice on Defective Heating Pads CPSC Issues China Product Safety Program Report Other CPSC Actions In The News IEC Standards Update Product Reviews Product News UL Standards Update From Our “You Can’t Make This Stuff Up” Department Looking Back: Items from Past Issues of Conformity Advertisers Conformity Magazine - September 2007 Conformity Magazine - September 2007 - (Page Cover1) Conformity Magazine - September 2007 - (Page Cover2) Conformity Magazine - September 2007 - (Page 3) Conformity Magazine - September 2007 - Contents (Page 4) Conformity Magazine - September 2007 - Contents (Page 5) Conformity Magazine - September 2007 - Editor’s Note (Page 6) Conformity Magazine - September 2007 - Editor’s Note (Page 7) Conformity Magazine - September 2007 - Editor’s Note (Page 8) Conformity Magazine - September 2007 - Editor’s Note (Page 9) Conformity Magazine - September 2007 - FCC Gets Tough on Retailers Over Analog TV Tuner Labeling (Page 10) Conformity Magazine - September 2007 - Commission Adopts Recommendations of Katrina Panel (Page 11) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 12) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 13) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 14) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 15) Conformity Magazine - September 2007 - Editorial Correction (Page 16) Conformity Magazine - September 2007 - Editorial Correction (Page 17) Conformity Magazine - September 2007 - Editorial Correction (Page 18) Conformity Magazine - September 2007 - Editorial Correction (Page 19) Conformity Magazine - September 2007 - Editorial Correction (Page 20) Conformity Magazine - September 2007 - Editorial Correction (Page 21) Conformity Magazine - September 2007 - ESD Open Forum (Page 22) Conformity Magazine - September 2007 - ESD Open Forum (Page 23) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 24) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 25) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 26) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 27) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 28) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 29) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 30) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 31) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 32) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 33) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 34) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 35) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 36) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 37) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 38) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 39) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 40) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 41) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 42) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 43) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 44) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 45) Conformity Magazine - September 2007 - ESD Design (Page 46) Conformity Magazine - September 2007 - ESD Design (Page 47) Conformity Magazine - September 2007 - ESD Design (Page 48) Conformity Magazine - September 2007 - ESD Design (Page 49) Conformity Magazine - September 2007 - ESD Design (Page 50) Conformity Magazine - September 2007 - ESD Design (Page 51) Conformity Magazine - September 2007 - ESD Design (Page 52) Conformity Magazine - September 2007 - ESD Design (Page 53) Conformity Magazine - September 2007 - Buyer's Guide (Page 54) Conformity Magazine - September 2007 - Buyer's Guide (Page 55) Conformity Magazine - September 2007 - Buyer's Guide (Page 56) Conformity Magazine - September 2007 - Buyer's Guide (Page 57) Conformity Magazine - September 2007 - Buyer's Guide (Page 58) Conformity Magazine - September 2007 - Buyer's Guide (Page 59) Conformity Magazine - September 2007 - Buyer's Guide (Page 60) Conformity Magazine - September 2007 - Buyer's Guide (Page 61) Conformity Magazine - September 2007 - Buyer's Guide (Page 62) Conformity Magazine - September 2007 - Buyer's Guide (Page 63) Conformity Magazine - September 2007 - Buyer's Guide (Page 64) Conformity Magazine - September 2007 - Buyer's Guide (Page 65) Conformity Magazine - September 2007 - Medical Device Manufacturer Enters Consent Order (Page 66) Conformity Magazine - September 2007 - Other CPSC Actions In The News (Page 67) Conformity Magazine - September 2007 - IEC Standards Update (Page 68) Conformity Magazine - September 2007 - Product Reviews (Page 69) Conformity Magazine - September 2007 - Product News (Page 70) Conformity Magazine - September 2007 - Product News (Page 71) Conformity Magazine - September 2007 - UL Standards Update (Page 72) Conformity Magazine - September 2007 - Looking Back: Items from Past Issues of Conformity (Page 73) Conformity Magazine - September 2007 - Advertisers (Page 74) Conformity Magazine - September 2007 - Advertisers (Page Cover3) Conformity Magazine - September 2007 - Advertisers (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.