Conformity Magazine - September 2007 - (Page 44) values, as follows: Code Comment :sub32 start of sub routine LDA &code load accumulator with code value LDB &ghost load ghost value CMP compare value and ghost BNE #error jump to error routine if values do not match XXX otherwise proceed with program section). If a setting of the port from logical outputs to inputs causes a large switch in internal states of an IC, resulting in a large current demand, an intermediate state may be available that has only a fraction of the transient current demand when switched (Figure 7). Using the intermediate state between transitions requires only one additional code instruction and will reduce transient supply demand and hence conducted noise levels. The intermediate state transition technique may be applicable to other circuits, such as clearing selective flags prior to rewriting, and may save the number of actual data or address lines driven, thereby again reduce transient demand. Actual transient savings in many circuits will be negligible, and the idea is best reserved for those functions that are known to require larger current supply (e.g., line drivers, interface circuits and bidirectional ports). Another technique that can help with interfaces is to use a coding scheme, such as Manchester coding, which has only a few frequencies in the transmission. In Manchester coding, only 2 frequencies are used: a ‘1’ is indicated by a single transition, and a ‘0’ by a double transition within the clock cycle (Figure 8). The signal is therefore always changing state, and a latched condition or end of transmission are also easy to detect. The receiving circuit can potentially determine if the sender is experiencing EMC problems. With standard non-return to zero (NRZ) coding, the frequencies present in the transmission can be from the clock frequency to whatever the maximum bit code length period is (i.e., 1/8 the clock frequency for an 8-bit code, as shown in Figure 9). Manchester coding makes filtering easier, if required, and allows for a simpler method of triggering on levels rather than edges that will also improve immunity. The clock of the transmission circuit is derivable from the signal; hence, using a fixed offset delay, a level triggered receive circuit is easy to implement in either software (using a delay routine) or in hardware (using a delay line). Converting standard edge triggered circuits to level triggered is possible at specific ports by using a software code delay to allow the value to settle prior to reading. The length of delay will depend on the function, but should allow the ringing or overshoot to settle and consequently not affect the value read at the port (Figure 10). A typical settling time This method is a memory implementation of the oversampling technique and could be extended if necessary, although at some cost if there is a lot of code (i.e., 3 or 4 copies could be used for comparison). If multiple ghost values are used, a mathematical method of selecting the correct value could be applied (e.g., numerical digital average of each bit). The method can also be selectively applied to code or data values from a known problematic location or EMC critical area of the system or program. Other Techniques There are other techniques that are more specific to the hardware being used and the best methods of operating interfaces and associated circuits (for example, the interface with a tristate setting mentioned in the first part of this Surge protection for: • AC Power UL 1449 2nd Edition • Data lines like T1/ E1, RS232, RS422, RS485, POE and HDSL • COAXIAL lines N, 7/16 DIN, TNC, SMA Ideal for Radio, Wireless and Cellular base stations. Surge Arrester Gas Tubes for PCB. Available in surface mount and through hole. Any voltage from 75V to 2500V. (305) 621-0022 • Fax (305) 621-0766 • e-mail: citel@citelprotection.com 1-800-CITEL-4U www.citelprotection.com Figure 10: Setting the port prior to reading can flush any noise built on the terminal pins when in a high impedance state. 44 Conformity September 2007 http://www.citelprotection.com http://www.citelprotection.com
Table of Contents Feed for the Digital Edition of Conformity Magazine - September 2007 Contents Editor’s Note FCC Extends Disability Access Requirements to VOIP Commission Fines Importer $3 Million Over Non-Compliant TVs FCC Gets Tough on Retailers Over Analog TV Tuner Labeling Analog Cellular Service Sunset Date Reaffirmed Commission Adopts Recommendations of Katrina Panel Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing Editorial Correction ESD Open Forum An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD Practical Advice for Meeting the DFS Testing Requirements of the FCC The EMC Impact of Embedded Software ESD Design Buyer's Guide Tate Renominated to the FCC EPA Releases Report on U.S. Electronic Waste Additional Standards For The EU’s Toy Directive Medical Device Manufacturer Enters Consent Order Updated Guidance Document on Laser Products Issued FDA Offers Advice on Defective Heating Pads CPSC Issues China Product Safety Program Report Other CPSC Actions In The News IEC Standards Update Product Reviews Product News UL Standards Update From Our “You Can’t Make This Stuff Up” Department Looking Back: Items from Past Issues of Conformity Advertisers Conformity Magazine - September 2007 Conformity Magazine - September 2007 - (Page Cover1) Conformity Magazine - September 2007 - (Page Cover2) Conformity Magazine - September 2007 - (Page 3) Conformity Magazine - September 2007 - Contents (Page 4) Conformity Magazine - September 2007 - Contents (Page 5) Conformity Magazine - September 2007 - Editor’s Note (Page 6) Conformity Magazine - September 2007 - Editor’s Note (Page 7) Conformity Magazine - September 2007 - Editor’s Note (Page 8) Conformity Magazine - September 2007 - Editor’s Note (Page 9) Conformity Magazine - September 2007 - FCC Gets Tough on Retailers Over Analog TV Tuner Labeling (Page 10) Conformity Magazine - September 2007 - Commission Adopts Recommendations of Katrina Panel (Page 11) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 12) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 13) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 14) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 15) Conformity Magazine - September 2007 - Editorial Correction (Page 16) Conformity Magazine - September 2007 - Editorial Correction (Page 17) Conformity Magazine - September 2007 - Editorial Correction (Page 18) Conformity Magazine - September 2007 - Editorial Correction (Page 19) Conformity Magazine - September 2007 - Editorial Correction (Page 20) Conformity Magazine - September 2007 - Editorial Correction (Page 21) Conformity Magazine - September 2007 - ESD Open Forum (Page 22) Conformity Magazine - September 2007 - ESD Open Forum (Page 23) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 24) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 25) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 26) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 27) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 28) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 29) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 30) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 31) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 32) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 33) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 34) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 35) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 36) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 37) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 38) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 39) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 40) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 41) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 42) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 43) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 44) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 45) Conformity Magazine - September 2007 - ESD Design (Page 46) Conformity Magazine - September 2007 - ESD Design (Page 47) Conformity Magazine - September 2007 - ESD Design (Page 48) Conformity Magazine - September 2007 - ESD Design (Page 49) Conformity Magazine - September 2007 - ESD Design (Page 50) Conformity Magazine - September 2007 - ESD Design (Page 51) Conformity Magazine - September 2007 - ESD Design (Page 52) Conformity Magazine - September 2007 - ESD Design (Page 53) Conformity Magazine - September 2007 - Buyer's Guide (Page 54) Conformity Magazine - September 2007 - Buyer's Guide (Page 55) Conformity Magazine - September 2007 - Buyer's Guide (Page 56) Conformity Magazine - September 2007 - Buyer's Guide (Page 57) Conformity Magazine - September 2007 - Buyer's Guide (Page 58) Conformity Magazine - September 2007 - Buyer's Guide (Page 59) Conformity Magazine - September 2007 - Buyer's Guide (Page 60) Conformity Magazine - September 2007 - Buyer's Guide (Page 61) Conformity Magazine - September 2007 - Buyer's Guide (Page 62) Conformity Magazine - September 2007 - Buyer's Guide (Page 63) Conformity Magazine - September 2007 - Buyer's Guide (Page 64) Conformity Magazine - September 2007 - Buyer's Guide (Page 65) Conformity Magazine - September 2007 - Medical Device Manufacturer Enters Consent Order (Page 66) Conformity Magazine - September 2007 - Other CPSC Actions In The News (Page 67) Conformity Magazine - September 2007 - IEC Standards Update (Page 68) Conformity Magazine - September 2007 - Product Reviews (Page 69) Conformity Magazine - September 2007 - Product News (Page 70) Conformity Magazine - September 2007 - Product News (Page 71) Conformity Magazine - September 2007 - UL Standards Update (Page 72) Conformity Magazine - September 2007 - Looking Back: Items from Past Issues of Conformity (Page 73) Conformity Magazine - September 2007 - Advertisers (Page 74) Conformity Magazine - September 2007 - Advertisers (Page Cover3) Conformity Magazine - September 2007 - Advertisers (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.