Conformity Magazine - September 2007 - (Page 55) Your Test Is Only As Good As The Sum Of Its Parts. + AT5080 Log Periodic Antenna 80 MHz – 5 GHz, 5,000 watt input power Starmonitor Field Monitor FM7004 ® + ® + NE3000 Noise Emitter 9 kHz – 2 GHz. + + Starprobe 3 Laser Powered Probe (Model FL7018) 3 MHz – 18 GHz / 1 – 1000 V/m. + DC7350A 4 – 8 GHz, 350 Watt Microwave Horns 0.8 – 50 GHz + ® + PM2002 Two-Channel Power Meter 10 kHz – 40 GHz Starprobe 1 Laser Powered Probe (Model FL7030) 5 kHz – 30 MHz / 1.5 – 300 V/m And FI7000 Probe Interface SW1006 EMC Test Software + LN1G11 Low Noise Amp 1.0 – 11.0 GHz. + + SG1200 Signal Generator 9 kHz – 1.2 GHz + SC1000 System Controller DC – 40 GHz = Battery-powered E&H field probes 100 kHz – 60 GHz. BI30000 Tubular Wave Couplers 150 kHz – 3 GHz If you've got AR amplifiers, you obviously recognize the importance of quality and ultimate reliability. But now that you're about to add accessories, this is no time for a weak link. All it takes is one component in your test set-up that doesn't perform as well as it should, and all your test results become questionable. Why take chances? AR offers a complete selection of accessory products that give you a competitive edge, the most reliable results, and complete peace of mind. Field monitors, probes, software, system controllers, couplers, signal generators, and more. All matched to our amplifiers to make your set-up as easy as possible. And all AR products are backed by the most comprehensive warranty in the business; and a global support network that's second to none. We're here to help you, today, tomorrow and always. To learn more, visit www.ar-worldwide.com or call us at 215-723-8181. ISO 9001:2000 Certified Infinite Solutions for All Your Testing Needs. rf/microwave instrumentation Other ar divisions: modular rf • receiver systems • ar europe USA 215-723-8181. For an applications engineer, call 800-933-8181. In Europe, call ar emv United Kingdom 441-908-282766 • ar emv France 33 -1-47-91-75-30 • emv Germany 89-614-1710 • emv Netherlands 31-172-423-000 Copyright© 2007 AR. The orange stripe on AR products is Reg. U.S. Pat. & TM. Off. http://www.ar-worldwide.com http://www.ar-worldwide.com
Table of Contents Feed for the Digital Edition of Conformity Magazine - September 2007 Contents Editor’s Note FCC Extends Disability Access Requirements to VOIP Commission Fines Importer $3 Million Over Non-Compliant TVs FCC Gets Tough on Retailers Over Analog TV Tuner Labeling Analog Cellular Service Sunset Date Reaffirmed Commission Adopts Recommendations of Katrina Panel Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing Editorial Correction ESD Open Forum An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD Practical Advice for Meeting the DFS Testing Requirements of the FCC The EMC Impact of Embedded Software ESD Design Buyer's Guide Tate Renominated to the FCC EPA Releases Report on U.S. Electronic Waste Additional Standards For The EU’s Toy Directive Medical Device Manufacturer Enters Consent Order Updated Guidance Document on Laser Products Issued FDA Offers Advice on Defective Heating Pads CPSC Issues China Product Safety Program Report Other CPSC Actions In The News IEC Standards Update Product Reviews Product News UL Standards Update From Our “You Can’t Make This Stuff Up” Department Looking Back: Items from Past Issues of Conformity Advertisers Conformity Magazine - September 2007 Conformity Magazine - September 2007 - (Page Cover1) Conformity Magazine - September 2007 - (Page Cover2) Conformity Magazine - September 2007 - (Page 3) Conformity Magazine - September 2007 - Contents (Page 4) Conformity Magazine - September 2007 - Contents (Page 5) Conformity Magazine - September 2007 - Editor’s Note (Page 6) Conformity Magazine - September 2007 - Editor’s Note (Page 7) Conformity Magazine - September 2007 - Editor’s Note (Page 8) Conformity Magazine - September 2007 - Editor’s Note (Page 9) Conformity Magazine - September 2007 - FCC Gets Tough on Retailers Over Analog TV Tuner Labeling (Page 10) Conformity Magazine - September 2007 - Commission Adopts Recommendations of Katrina Panel (Page 11) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 12) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 13) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 14) Conformity Magazine - September 2007 - Free-Space Antenna Factors Through the Use of Time-Domain Signal Processing (Page 15) Conformity Magazine - September 2007 - Editorial Correction (Page 16) Conformity Magazine - September 2007 - Editorial Correction (Page 17) Conformity Magazine - September 2007 - Editorial Correction (Page 18) Conformity Magazine - September 2007 - Editorial Correction (Page 19) Conformity Magazine - September 2007 - Editorial Correction (Page 20) Conformity Magazine - September 2007 - Editorial Correction (Page 21) Conformity Magazine - September 2007 - ESD Open Forum (Page 22) Conformity Magazine - September 2007 - ESD Open Forum (Page 23) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 24) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 25) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 26) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 27) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 28) Conformity Magazine - September 2007 - An Update on Revisions to IEC 61000-4-2, the Basic Standard on ESD (Page 29) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 30) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 31) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 32) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 33) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 34) Conformity Magazine - September 2007 - Practical Advice for Meeting the DFS Testing Requirements of the FCC (Page 35) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 36) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 37) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 38) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 39) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 40) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 41) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 42) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 43) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 44) Conformity Magazine - September 2007 - The EMC Impact of Embedded Software (Page 45) Conformity Magazine - September 2007 - ESD Design (Page 46) Conformity Magazine - September 2007 - ESD Design (Page 47) Conformity Magazine - September 2007 - ESD Design (Page 48) Conformity Magazine - September 2007 - ESD Design (Page 49) Conformity Magazine - September 2007 - ESD Design (Page 50) Conformity Magazine - September 2007 - ESD Design (Page 51) Conformity Magazine - September 2007 - ESD Design (Page 52) Conformity Magazine - September 2007 - ESD Design (Page 53) Conformity Magazine - September 2007 - Buyer's Guide (Page 54) Conformity Magazine - September 2007 - Buyer's Guide (Page 55) Conformity Magazine - September 2007 - Buyer's Guide (Page 56) Conformity Magazine - September 2007 - Buyer's Guide (Page 57) Conformity Magazine - September 2007 - Buyer's Guide (Page 58) Conformity Magazine - September 2007 - Buyer's Guide (Page 59) Conformity Magazine - September 2007 - Buyer's Guide (Page 60) Conformity Magazine - September 2007 - Buyer's Guide (Page 61) Conformity Magazine - September 2007 - Buyer's Guide (Page 62) Conformity Magazine - September 2007 - Buyer's Guide (Page 63) Conformity Magazine - September 2007 - Buyer's Guide (Page 64) Conformity Magazine - September 2007 - Buyer's Guide (Page 65) Conformity Magazine - September 2007 - Medical Device Manufacturer Enters Consent Order (Page 66) Conformity Magazine - September 2007 - Other CPSC Actions In The News (Page 67) Conformity Magazine - September 2007 - IEC Standards Update (Page 68) Conformity Magazine - September 2007 - Product Reviews (Page 69) Conformity Magazine - September 2007 - Product News (Page 70) Conformity Magazine - September 2007 - Product News (Page 71) Conformity Magazine - September 2007 - UL Standards Update (Page 72) Conformity Magazine - September 2007 - Looking Back: Items from Past Issues of Conformity (Page 73) Conformity Magazine - September 2007 - Advertisers (Page 74) Conformity Magazine - September 2007 - Advertisers (Page Cover3) Conformity Magazine - September 2007 - Advertisers (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.