Conformity Magazine - November 2007 - (Page 20) Section 5.1.6 Extended Outages Extended outages are times when commercial power cannot be restored quickly due to bad weather or a natural disaster, and the facility for network communication is not in service. These outages can last a few days to a week until network personnel can visit the location and correct any commercial and/or network powerpath problems (i.e., broken load power lines). During these times, it is critical for batteries with electronic management to retain their charge while AC and network power problems are being corrected. The charge retention capabilities of the battery are dependent on the activity of its electronic management system. Electronic batteries maintain various modes of operation. The operations of these electronics drain cell energy as soon as the battery is turned on. Active electronics can force a battery to shut down permanently or reverse. When in service, the circuitry that controls the electrochemistry is constantly operating and becomes a parasitic drain to the electrochemistry when the battery is in open circuit or when the battery is in discharge. The electronics are needed to optimize safety and efficiency; however, care should be taken to ensure that the battery management consumes minimal energy from the battery. When network power paths are restored, it is important that the batteries provide a certain level of performance to ensure resumption of network operations. Batteries that fail to do this will place an additional strain on network personnel. For the Level III extended outages test, batteries with management systems are required to function for a minimum of 7 days at an ambient temperature of 35C (95 F) after being discharged to 42 V. Following the 1 week period, the batteries are recharged and are required to provide a certain level of performance when discharged to 42 V. An objective for two weeks of battery functionality during an extended outage is also detailed in the GR. 20 Conformity noVEmBEr 2007 Battery crushing is considered extreme and rare. For compliance, battery explosion and ignition is disallowed; however, battery venting or leaking is anticipated and permitted. When tested, batteries are unpackaged and charged to the manufacturer’s normal shipping SoC and slowly crushed between two flat non-conductive surfaces by a force of 9000 lbs (4,082 kgs). The battery is crushed in its longitudinal and traverse orientations. Crush test test setups are shown in Figure 5. Section 4.6.3.3. Low-Level Vibration Resistance Batteries may be subjected to low-level vibration in service caused by nearby rotating equipment, adjacent rail or truck traffic, or construction work in nearby spaces or buildings. This vibration can cause circuit board “walkout,” malfunctions, or other service interruptions or failures. For testing, a fully assembled and charged battery’s resistance to a low-level vibration profile which simulates nearby rotating equipment, adjacent rail or truck traffic, or construction work in nearby spaces or buildings is evaluated. Batteries are required to sustain normal operation, without manual rebooting or replacement of components, during the exposure. Testing is performed according to the requirements detailed in the latest issue of GR-3108-CORE, Generic Requirememts for Network Equipment in the Outside Plant (OSP). Low-level vibration resistance is a Level III test. Other Sections of GR-1350 Also included in GR-3150 are Sections 5 and 6, which detail lithium battery performance and service life requirements, respectively, and appendices providing a list of referenced documents (Appendix A), a list of acronyms used in this GR (Appendix B), and a glossary (Appendix C). Section descriptions are provided here. Requirements in Section 5, Performance Criteria, address lithium battery electrical and environmental performance. Float voltage and capacity (Section 5.1.1), recharge time (Section 5.1.2), end of discharge (eod) voltage (Section 5.1.3), cycling (5.1.4), shelf-life and charge retention (5.1.5), extended outages (5.1.6) requirements are defined in Section 5.1, Electrical Criteria. For Section 5.2, Environmental Criteria, requirements addressing temperature and humidity shock during transportation and storage, cold temperature start, salt fog exposure, particulate containment and resistance to corrosive gases performance are provided. Section 6, Service Life Criteria, provides service life guidelines and rationale for Arrhenius-based accelerated life testing. This is an introduction to a possible method for determining service life by accelerated testing. Criteria for determining service life is not provided in the GR because: 1) the technology is new thus insufficient experience exists to predict all possible battery failure modes; and 2) the broad
Table of Contents Feed for the Digital Edition of Conformity Magazine - November 2007 Conformity - November 2007 Contents Editor’s Note Commission Sets Date, Terms for 700 MHz Auction FCC Reaffirms Roaming Obligations Commission Moves to Improve USF Management FCC Proposes Fines for Violations of E911 Handset Requirements Commission Levies $1 Million Plus Fines for Unsolicited Fax Advertisements GR-3150 - Lithium Battery Certification Levels Based on Criteria for General Product, Safety, and Performance, Part 2 ESD Open Forum Machinery Field Evaluation for the United States Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety Thermal/EMC Simulation Addresses New Mechanical Design Challenges Product Safety Equipment Buyer’s Guide FCC Releases Report on Telephone Numbering Resource Utilization Canada Still Has PCS Spectrum to Assign Updated Standards List for the EU’s Medical Devices Directive Updated Standards List for EU Directive on Active Implantable Medical Devices Call for Papers for the 2008 EOS/ESD Symposium Announced Mobile Phone Use in Hospitals May Be Dangerous CPSC Actions in the News IEC Standards Update UL Standards Update Telcordia Standards Update From Our “You Can’t Make This Stuff Up” Department Product Reviews Looking Back: Items from Past Issues of Conformity Upcoming Events Advertisers Conformity Magazine - November 2007 Conformity Magazine - November 2007 - Conformity - November 2007 (Page Cover1) Conformity Magazine - November 2007 - Conformity - November 2007 (Page Cover2) Conformity Magazine - November 2007 - Conformity - November 2007 (Page 3) Conformity Magazine - November 2007 - Contents (Page 4) Conformity Magazine - November 2007 - Contents (Page 5) Conformity Magazine - November 2007 - Editor’s Note (Page 6) Conformity Magazine - November 2007 - Editor’s Note (Page 7) Conformity Magazine - November 2007 - Editor’s Note (Page 8) Conformity Magazine - November 2007 - Editor’s Note (Page 9) Conformity Magazine - November 2007 - Commission Moves to Improve USF Management (Page 10) Conformity Magazine - November 2007 - Commission Levies $1 Million Plus Fines for Unsolicited Fax Advertisements (Page 11) Conformity Magazine - November 2007 - GR-3150 - Lithium Battery Certification Levels Based on Criteria for General Product, Safety, and Performance, Part 2 (Page 12) Conformity Magazine - November 2007 - GR-3150 - Lithium Battery Certification Levels Based on Criteria for General Product, Safety, and Performance, Part 2 (Page 13) Conformity Magazine - November 2007 - GR-3150 - Lithium Battery Certification Levels Based on Criteria for General Product, Safety, and Performance, Part 2 (Page 14) Conformity Magazine - November 2007 - GR-3150 - Lithium Battery Certification Levels Based on Criteria for General Product, Safety, and Performance, Part 2 (Page 15) Conformity Magazine - November 2007 - GR-3150 - Lithium Battery Certification Levels Based on Criteria for General Product, Safety, and Performance, Part 2 (Page 16) Conformity Magazine - November 2007 - GR-3150 - Lithium Battery Certification Levels Based on Criteria for General Product, Safety, and Performance, Part 2 (Page 17) Conformity Magazine - November 2007 - GR-3150 - Lithium Battery Certification Levels Based on Criteria for General Product, Safety, and Performance, Part 2 (Page 18) Conformity Magazine - November 2007 - GR-3150 - Lithium Battery Certification Levels Based on Criteria for General Product, Safety, and Performance, Part 2 (Page 19) Conformity Magazine - November 2007 - GR-3150 - Lithium Battery Certification Levels Based on Criteria for General Product, Safety, and Performance, Part 2 (Page 20) Conformity Magazine - November 2007 - GR-3150 - Lithium Battery Certification Levels Based on Criteria for General Product, Safety, and Performance, Part 2 (Page 21) Conformity Magazine - November 2007 - ESD Open Forum (Page 22) Conformity Magazine - November 2007 - ESD Open Forum (Page 23) Conformity Magazine - November 2007 - Machinery Field Evaluation for the United States (Page 24) Conformity Magazine - November 2007 - Machinery Field Evaluation for the United States (Page 25) Conformity Magazine - November 2007 - Machinery Field Evaluation for the United States (Page 26) Conformity Magazine - November 2007 - Machinery Field Evaluation for the United States (Page 27) Conformity Magazine - November 2007 - Machinery Field Evaluation for the United States (Page 28) Conformity Magazine - November 2007 - Machinery Field Evaluation for the United States (Page 29) Conformity Magazine - November 2007 - Machinery Field Evaluation for the United States (Page 30) Conformity Magazine - November 2007 - Machinery Field Evaluation for the United States (Page 31) Conformity Magazine - November 2007 - Machinery Field Evaluation for the United States (Page 32) Conformity Magazine - November 2007 - Machinery Field Evaluation for the United States (Page 33) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 34) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 35) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 36) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 37) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 38) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 39) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 40) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 41) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 42) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 43) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 44) Conformity Magazine - November 2007 - Validation, Verification, and Immunity Testing Techniques for EMC for Functional Safety (Page 45) Conformity Magazine - November 2007 - Thermal/EMC Simulation Addresses New Mechanical Design Challenges (Page 46) Conformity Magazine - November 2007 - Thermal/EMC Simulation Addresses New Mechanical Design Challenges (Page 47) Conformity Magazine - November 2007 - Thermal/EMC Simulation Addresses New Mechanical Design Challenges (Page 48) Conformity Magazine - November 2007 - Thermal/EMC Simulation Addresses New Mechanical Design Challenges (Page 49) Conformity Magazine - November 2007 - Thermal/EMC Simulation Addresses New Mechanical Design Challenges (Page 50) Conformity Magazine - November 2007 - Thermal/EMC Simulation Addresses New Mechanical Design Challenges (Page 51) Conformity Magazine - November 2007 - Thermal/EMC Simulation Addresses New Mechanical Design Challenges (Page 52) Conformity Magazine - November 2007 - Thermal/EMC Simulation Addresses New Mechanical Design Challenges (Page 53) Conformity Magazine - November 2007 - Product Safety Equipment (Page 54) Conformity Magazine - November 2007 - Product Safety Equipment (Page 55) Conformity Magazine - November 2007 - Product Safety Equipment (Page 56) Conformity Magazine - November 2007 - Product Safety Equipment (Page 57) Conformity Magazine - November 2007 - Product Safety Equipment (Page 58) Conformity Magazine - November 2007 - Product Safety Equipment (Page 59) Conformity Magazine - November 2007 - Buyer’s Guide (Page 60) Conformity Magazine - November 2007 - Buyer’s Guide (Page 61) Conformity Magazine - November 2007 - Buyer’s Guide (Page 62) Conformity Magazine - November 2007 - Call for Papers for the 2008 EOS/ESD Symposium Announced (Page 63) Conformity Magazine - November 2007 - CPSC Actions in the News (Page 64) Conformity Magazine - November 2007 - IEC Standards Update (Page 65) Conformity Magazine - November 2007 - From Our “You Can’t Make This Stuff Up” Department (Page 66) Conformity Magazine - November 2007 - Product Reviews (Page 67) Conformity Magazine - November 2007 - Looking Back: Items from Past Issues of Conformity (Page 68) Conformity Magazine - November 2007 - Upcoming Events (Page 69) Conformity Magazine - November 2007 - Advertisers (Page 70) Conformity Magazine - November 2007 - Advertisers (Page Cover3) Conformity Magazine - November 2007 - Advertisers (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.