EnergyBiz - January/February 2008 - (Page 29) Who provides the greatest path of certainty for new nuclear generation in the near term? The Olkiluoto 3 EPR project under construction in Finland. AREVA has the most reliable knowledge base for certainty of cost, licensing and construction for new nuclear generation. The U.S. EPR is a proven, safe, economical design that is part of a standardized global fleet being deployed now. And it’s the only Gen III+ plant design in the world that is actually being built. At least two EPR units will be operating when the first U.S. units go online. So only AREVA can offer a reliable basis for project certainty to help ensure America’s energy security — in the near term. http://www.us.areva-np.com/USEPR http://www.us.areva.com http://www.us.areva-np.com/USEPR http://www.us.areva.com
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.