Louisiana TIMED Program Annual Report 2007-2008 - (Page 31) ta M il Le Pr l P % Co es og ro ng Co ns in ra jec th m tr m te (M pl uc Co d et ile ti st on e s) Project s To Co m St ar tD 1 pl et io n at e Da te U.S. 61 U.S. 90 U.S. 165 2 $95 M $256 M 19.6 24.9 7.4 0 91.3 72.3 29.8 0 0 0 0 0 3.2 14.6 0 0 43% 100% 76% 63% 83% 100% 91% 100% 100% 100% 19% 46% 100% 100% 2001 1991 1991 1995 1990 1992 1996 1994 1990 1992 2005 2006 1990 1990 2010 1999 2010 2010 2009 2007 2010 2004 1993 2006 2013 2010 1995 1995 $920 M 172.9 $688 M 112.2 $605 M 121.3 $87 M 28.4 2.8 4 1 5 3.2 14.6 0 0 U.S. 1673 U.S. 171 LA 15 LA 3241 4 Bonding the TIMED Program allows money to be borrowed against future tax revenue so the accelerated schedule can be met. The more traditional method of pay-as-you-go funding would require the gas tax to be collected before work could progress. The bond revenues provide funding so that projects can proceed sooner. The TIMED tax provides the revenue to complete the TIMED Projects and repay the bonds. Additional bond sales are scheduled in future years to maintain the accelerated Program. The total projected cost of the Louisiana TIMED Program is $4.6 billion. (This cost does not include LA 3241 or the Florida Avenue Bridge.) $20 M $51 M $33 M $69 M $1.159 B $403 M $75 M $100 M Earhart Boulevard Tchoupitoulas Street West Bank Expressway West Napoleon Florida Avenue Bridge4 Huey P. Long Bridge John James Audubon Bridge Louis Armstrong International Airport Port of New Orleans 1 2 Progress (% complete) based on expenditures through June 30, 2008. Completion date excludes Red River Bridge - Fort Buhlow. 3 Completion date excludes State Route in Dry Prong. 4 Limited funding is available for these projects. Scopes and schedules are being reassessed. Costs not included in the $4.6 billion total projected program cost. 31 TIMED Annual Report | www.timedla.com | 2008 http://www.timedla.com
Table of Contents Feed for the Digital Edition of Louisiana TIMED Program Annual Report 2007-2008 Louisiana Time Manager Annual Report 2008-2009 Contents Introduction Letter from the Director Timed Projects Under Construction Huey P. Long Bridge John James Audubon Bridge U.S. 165 U.S. 167 U.S. 171 U.S. 61 Earhart Boulevard Completed West Napoleon, Tchoupitoulas Street and U.S. 90 West Bank Expressway, Port of New Orleans and Louis Armstrong International Airport LA 15 Pre-Construction LA 3241 U.S. 167 State Route in Dry Prong Segment and Florida Avenue Bridge Community Outreach TIMED Education Programs 2008 Accomplishments Timed Program Funding Louisiana TIMED Program Annual Report 2007-2008 Louisiana TIMED Program Annual Report 2007-2008 - Louisiana Time Manager Annual Report 2008-2009 (Page Cover1) Louisiana TIMED Program Annual Report 2007-2008 - Louisiana Time Manager Annual Report 2008-2009 (Page 1) Louisiana TIMED Program Annual Report 2007-2008 - Contents (Page 2) Louisiana TIMED Program Annual Report 2007-2008 - Letter from the Director (Page 3) Louisiana TIMED Program Annual Report 2007-2008 - Letter from the Director (Page 4) Louisiana TIMED Program Annual Report 2007-2008 - Under Construction (Page 5) Louisiana TIMED Program Annual Report 2007-2008 - Huey P. Long Bridge (Page 6) Louisiana TIMED Program Annual Report 2007-2008 - John James Audubon Bridge (Page 7) Louisiana TIMED Program Annual Report 2007-2008 - John James Audubon Bridge (Page 8) Louisiana TIMED Program Annual Report 2007-2008 - U.S. 165 (Page 9) Louisiana TIMED Program Annual Report 2007-2008 - U.S. 165 (Page 10) Louisiana TIMED Program Annual Report 2007-2008 - U.S. 165 (Page 11) Louisiana TIMED Program Annual Report 2007-2008 - U.S. 167 (Page 12) Louisiana TIMED Program Annual Report 2007-2008 - U.S. 171 (Page 13) Louisiana TIMED Program Annual Report 2007-2008 - U.S. 171 (Page 14) Louisiana TIMED Program Annual Report 2007-2008 - U.S. 171 (Page 15) Louisiana TIMED Program Annual Report 2007-2008 - U.S. 61 (Page 16) Louisiana TIMED Program Annual Report 2007-2008 - Earhart Boulevard (Page 17) Louisiana TIMED Program Annual Report 2007-2008 - Earhart Boulevard (Page 18) Louisiana TIMED Program Annual Report 2007-2008 - Completed (Page 19) Louisiana TIMED Program Annual Report 2007-2008 - West Napoleon, Tchoupitoulas Street and U.S. 90 (Page 20) Louisiana TIMED Program Annual Report 2007-2008 - West Bank Expressway, Port of New Orleans and Louis Armstrong International Airport (Page 21) Louisiana TIMED Program Annual Report 2007-2008 - West Bank Expressway, Port of New Orleans and Louis Armstrong International Airport (Page 22) Louisiana TIMED Program Annual Report 2007-2008 - West Bank Expressway, Port of New Orleans and Louis Armstrong International Airport (Page 23) Louisiana TIMED Program Annual Report 2007-2008 - LA 15 (Page 24) Louisiana TIMED Program Annual Report 2007-2008 - LA 3241 (Page 25) Louisiana TIMED Program Annual Report 2007-2008 - U.S. 167 State Route in Dry Prong Segment and Florida Avenue Bridge (Page 26) Louisiana TIMED Program Annual Report 2007-2008 - Community Outreach (Page 27) Louisiana TIMED Program Annual Report 2007-2008 - TIMED Education Programs (Page 28) Louisiana TIMED Program Annual Report 2007-2008 - 2008 Accomplishments (Page 29) Louisiana TIMED Program Annual Report 2007-2008 - 2008 Accomplishments (Page 30) Louisiana TIMED Program Annual Report 2007-2008 - Timed Program Funding (Page 31) Louisiana TIMED Program Annual Report 2007-2008 - Timed Program Funding (Page 32)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.