Precast Solutions - July/August 2008 - (Page 14) STRUCTURALLY SOUND The ER-POST trusses may have been the darlings of the precast concrete products used in the Turtle Creek Casino renovation, but there is much more than meets the eye. Precast concrete was used extensively throughout the project, and was supplied by Kerkstra Precast Inc., Grandville, Mich. Product Double-Ts Columns Beams Trusses Solid walls for elevator shaft Quantity 28 34 33 14 62 Dimensions Approx. 13,000 sq. ft. 1,340 linear ft. 670 linear ft. 11 ft., 11 in. deep by 58 ft., 2 in. long 19,200 sq. ft. Approx 2,000 sq. ft. 79,100 sq. ft. Solid floor slabs for cantilevered balconies 24 Hollowcore plank 648 Although the project met with major design revisions and inclement weather, Kerkstra was able to produce and deliver these 843 pieces (including the redesigned ones) on time. Drawings were submitted Jan. 5, 2007, and production began less than a week later. All pieces were shipped on 198 loads during 49 work days between March 22, 2007, and May 31. Precast concrete proved to be cost-effective because of its installation speed and atplant cost savings. which can be “gutted and renovated relatively easily” because there are no interior columns to work around. “It also allowed other parts of the structural system to be poured – and the precast panels, parts and pieces made – during the winter months,” says La Pointe. “With the foundations done, we were able to start erecting the building in the spring.” Looking forward to a grand opening celebration, La Pointe says the precast trusses and overall construction of the project exceeded expectations. “It worked out very well,” says La Pointe, “and saved us a lot of time.” Bridget McCrea is a freelance writer who covers manufacturing, industry and technology. She is the winner of the 2007 Florida Magazine Association's Gold Award for best trade/technical feature statewide. 14 PRECAST SOLUTIONS | JULY/AUGUST 2008
Table of Contents Feed for the Digital Edition of Precast Solutions - July/August 2008 Precast Solutions - July/August 2008 Contents What You Should Know About UHPC A Winning Hand Fresno Federal Expanding U.S. Wind Power Precast Concrete Pipe Precast Solutions - July/August 2008 Precast Solutions - July/August 2008 - Precast Solutions - July/August 2008 (Page Cover1) Precast Solutions - July/August 2008 - Precast Solutions - July/August 2008 (Page Cover2) Precast Solutions - July/August 2008 - Contents (Page 3) Precast Solutions - July/August 2008 - What You Should Know About UHPC (Page 4) Precast Solutions - July/August 2008 - What You Should Know About UHPC (Page 5) Precast Solutions - July/August 2008 - What You Should Know About UHPC (Page 6) Precast Solutions - July/August 2008 - What You Should Know About UHPC (Page 7) Precast Solutions - July/August 2008 - What You Should Know About UHPC (Page 8) Precast Solutions - July/August 2008 - What You Should Know About UHPC (Page 9) Precast Solutions - July/August 2008 - A Winning Hand (Page 10) Precast Solutions - July/August 2008 - A Winning Hand (Page 11) Precast Solutions - July/August 2008 - A Winning Hand (Page 12) Precast Solutions - July/August 2008 - A Winning Hand (Page 13) Precast Solutions - July/August 2008 - A Winning Hand (Page 14) Precast Solutions - July/August 2008 - A Winning Hand (Page 15) Precast Solutions - July/August 2008 - Fresno Federal (Page 16) Precast Solutions - July/August 2008 - Fresno Federal (Page 17) Precast Solutions - July/August 2008 - Fresno Federal (Page 18) Precast Solutions - July/August 2008 - Fresno Federal (Page 19) Precast Solutions - July/August 2008 - Fresno Federal (Page 20) Precast Solutions - July/August 2008 - Fresno Federal (Page 21) Precast Solutions - July/August 2008 - Expanding U.S. Wind Power (Page 22) Precast Solutions - July/August 2008 - Expanding U.S. Wind Power (Page 23) Precast Solutions - July/August 2008 - Expanding U.S. Wind Power (Page 24) Precast Solutions - July/August 2008 - Expanding U.S. Wind Power (Page 25) Precast Solutions - July/August 2008 - Expanding U.S. Wind Power (Page 26) Precast Solutions - July/August 2008 - Expanding U.S. Wind Power (Page 27) Precast Solutions - July/August 2008 - Expanding U.S. Wind Power (Page 28) Precast Solutions - July/August 2008 - Expanding U.S. Wind Power (Page 29) Precast Solutions - July/August 2008 - Precast Concrete Pipe (Page 30) Precast Solutions - July/August 2008 - Precast Concrete Pipe (Page Cover3) Precast Solutions - July/August 2008 - Precast Concrete Pipe (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.