Precast Solutions - November/December 2008 - (Page 24) Campbell had to use a single crane to set the ribs into place on the stretch of U.S. 101, just a stone's throw from the Pacific. SPIN-N-LOK™ XT BOOTH 1429 THE PRECAST SHOW Closeup of rib resting on the sandbag-topped support. • 10,000 lbs CAPACITY • GREATER RANGE OF MOTION • ONE-POINT PICK CAPABILITY CONCRETE PIPE AND MANHOLE LIFTER Crews set the fascia panels on the side of the bridge that faces the water. The panels are cosmetic, hiding a utility drain pipe from view. for the crane, we worked to ensure proper placement of all components and to guarantee public safety throughout," Downs explained. "We're happy with the results," said Potisuk, "and the arches look great. I'm involved in another project on I-5, and we've chosen precast again because it's 1-800-423-4425 • americandrillbushing.com 24 PRECAST SOLUTIONS faster. We can drop it in from the decks, and there's no need for false work or form work on site," he added. | NOVEMBER/DECEMBER 2008 http://www.americandrillbushing.com http://www.americandrillbushing.com
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.