Centerlines - June 2008 - (Page 25) ENVIRONMENT than those 20 on the roofs of these buildings,” Sleiman says. “But before we install any more, we want to go through six to eight months, maybe nine months’ evaluation period to understand continued from page 21 Inc., of Monrovia, Calif., and were installed in March by Groom Energy Solutions of Salem, Mass. They already are producing electricity. “Basically, when they produce electricity, we use that whole electricity,” Sleiman says. “When they’re not producing electricity— when we have a calm day and there isn’t any wind—we are meeting our needs from the grid, from the electrical suppliers.” Terry Civic, Massport’s manager, utility control, says the wind turbine blades and motor housing are made of polycarbonate plastic, while the base of the 90-lb. system is galvanized steel, with stainless steel boltings. Electricity being produced by the turbines is fed through electrical connections in conduits on the roof into four inverters and hooked into the building’s electrical infrastructure. The system is monitored electronically. “There’s an independent meter dedicated to the output of all 20 wind turbines,” Civic says, “with a data logger that feeds us back information on the production of the turbines on a real-time basis.” Maintenance needs are minimal, she adds, basically involving a visual inspection from the roof to make sure, for instance, that electrical connections are tight and the structural bolts are properly torqued. There is a strong possibility there will be more wind turbines at Logan. “We have many buildings on the water edge here at Massport and there is a potential for a lot more throughout the year how much electricity they produce and whether they meet our expectations.” With an overall program cost of about $150,000, it will take about 12 to 13 years for the electricity generated to pay for the wind turbine installation. “But it’s not just about payback,” he says. “It’s about producing some renewable energy and being environmentally responsible and starting to make some difference in our sustainability at Massport.” Time to ReCharge your Ad Program? Time to ReCharge your Ad Program? Before After Alliance designed, fabricated and installed sponsored ReCharge Zones in old payphone locations at LAS. Alliance has the boost you need. "We asked for an attractive workspace fixture for McCarran – one that blended with the terminal traffic, made use of dead areas, and generated revenue. Alliance delivered it all." Scott Kichline, Manager, Commercial/Business Development "Revenue was key and Alliance delivered more than they promised." Randall H. Walker, Director of Aviation Alliance. Advertising that works for you. Call us to review your program today. LAS• BUR • SLC • PDX 877-809-9029 www.aci-na.org | CENTERLINES 25 http://www.allianceairportadvertising.com http://www.aci-na.org
Table of Contents Feed for the Digital Edition of Centerlines - June 2008 Centerlines - June 2008 Contents President’s Message Canadian Airports Associates’ Corner Guest Column On the Hill and On the Stump Policy Center Cover Story: Hotter Than Last July? Revenue Arena: Building Non-Aeronautical Revenue Environment: Wind Turbines at Boston Logan Passenger Focus: Des Moines Deals with the Iowa Caucuses Safety and Security: Inline Explosives Detection Systems Air Service Recruitment: Holding on to What You’ve Got On Management: Managing Capital Programs Now Underway Grand Opening Conference Previews and Reviews New Members Index of Advertisers/Advertiser.com Box Scores Centerlines - June 2008 Centerlines - June 2008 - Centerlines - June 2008 (Page Cover1) Centerlines - June 2008 - Centerlines - June 2008 (Page Cover2) Centerlines - June 2008 - Centerlines - June 2008 (Page 3) Centerlines - June 2008 - Centerlines - June 2008 (Page 4) Centerlines - June 2008 - Contents (Page 5) Centerlines - June 2008 - Contents (Page 6) Centerlines - June 2008 - President’s Message (Page 7) Centerlines - June 2008 - President’s Message (Page 8) Centerlines - June 2008 - Canadian Airports (Page 9) Centerlines - June 2008 - Associates’ Corner (Page 10) Centerlines - June 2008 - Guest Column (Page 11) Centerlines - June 2008 - On the Hill and On the Stump (Page 12) Centerlines - June 2008 - Policy Center (Page 13) Centerlines - June 2008 - Cover Story: Hotter Than Last July? (Page 14) Centerlines - June 2008 - Cover Story: Hotter Than Last July? (Page 15) Centerlines - June 2008 - Cover Story: Hotter Than Last July? (Page 16) Centerlines - June 2008 - Cover Story: Hotter Than Last July? (Page 17) Centerlines - June 2008 - Revenue Arena: Building Non-Aeronautical Revenue (Page 18) Centerlines - June 2008 - Revenue Arena: Building Non-Aeronautical Revenue (Page 19) Centerlines - June 2008 - Revenue Arena: Building Non-Aeronautical Revenue (Page 20) Centerlines - June 2008 - Environment: Wind Turbines at Boston Logan (Page 21) Centerlines - June 2008 - Passenger Focus: Des Moines Deals with the Iowa Caucuses (Page 22) Centerlines - June 2008 - Passenger Focus: Des Moines Deals with the Iowa Caucuses (Page 23) Centerlines - June 2008 - Passenger Focus: Des Moines Deals with the Iowa Caucuses (Page 24) Centerlines - June 2008 - Passenger Focus: Des Moines Deals with the Iowa Caucuses (Page 25) Centerlines - June 2008 - Passenger Focus: Des Moines Deals with the Iowa Caucuses (Page 26) Centerlines - June 2008 - Safety and Security: Inline Explosives Detection Systems (Page 27) Centerlines - June 2008 - Safety and Security: Inline Explosives Detection Systems (Page 28) Centerlines - June 2008 - Safety and Security: Inline Explosives Detection Systems (Page 29) Centerlines - June 2008 - Safety and Security: Inline Explosives Detection Systems (Page 30) Centerlines - June 2008 - Air Service Recruitment: Holding on to What You’ve Got (Page 31) Centerlines - June 2008 - Air Service Recruitment: Holding on to What You’ve Got (Page 32) Centerlines - June 2008 - Air Service Recruitment: Holding on to What You’ve Got (Page 33) Centerlines - June 2008 - On Management: Managing Capital Programs (Page 34) Centerlines - June 2008 - On Management: Managing Capital Programs (Page 35) Centerlines - June 2008 - On Management: Managing Capital Programs (Page 36) Centerlines - June 2008 - Now Underway (Page 37) Centerlines - June 2008 - Now Underway (Page 38) Centerlines - June 2008 - Grand Opening (Page 39) Centerlines - June 2008 - Conference Previews and Reviews (Page 40) Centerlines - June 2008 - Conference Previews and Reviews (Page 41) Centerlines - June 2008 - Conference Previews and Reviews (Page 42) Centerlines - June 2008 - New Members (Page 43) Centerlines - June 2008 - New Members (Page 44) Centerlines - June 2008 - Index of Advertisers/Advertiser.com (Page 45) Centerlines - June 2008 - Box Scores (Page 46) Centerlines - June 2008 - Box Scores (Page Cover3) Centerlines - June 2008 - Box Scores (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.