Public Power - July/August 2008 - (Page 27) cost-competitive generators in many locations by about 2030.” The Western Governors’ Association has said concentrating solar power could be competitive with natural gas by 2015 if a long-term investment tax credit is approved and resources are deployed on a scale of 2 to 4 GW. The goal of the Solar American Initiative is to bring concentrating solar power down to less than 10 cents/kWh by 2015. Solar Energy Industries Association said the cost for concentrating solar power is between 12 to 14 cents/kWh but projects it will decline to 8 cents as new plants come on line. The developer of the Nevada Solar One parabolic trough concentrating solar power signed 20-year contracts under which Nevada Power Co. purchases 43.5 MW and Sierra Pacific Power Co. 20.45 MW. Sierra Pacific Power Co. reported to FERC that it bought a total 17,505 MWh from NSO for approximately $2.9 million during 2007. The figures work out to an average of $167.64/MWh. But that includes “testing power” and should not be assumed to reflect the contract price, which is confidential, Sierra Pacific said. Southern California Edison, which buys output from the Solar Energy Generation Station under seven contracts, told FERC it bought 624,566 MWh in 2007, paid demand charges of $56.95 million and energy charges totaling $44.6 million, which works out to $162.6/MWh. Assuming the investment tax credit is applied, Arizona Public Service will pay about 14 cents/kWh for the output of the proposed 280-MW Abengoa plant, four cents more than it would pay for peak power from a natural gas-fired plant, according to reporting by The Arizona Republic. APS said it expects to spend $40 billion to buy power from the plant over 30 years. ❚ Ben Tansey is an energy writer in Seattle. He can be reached at btansey@newsdata.com MERCURY CONTROL A TurnKey Approach ONE STOP MERCURY CONTROL SOLUTION FROM IAC We’ve done the hard work for you IAC developed your mercury removal strategy IAC Three Step Program 1. Demonstration IAC Fully Equipped 48’ Long Test Rig Trailer WE BURN IT AT BOTH ENDS. 2. Select PAC Sorbent Gas Stream Removal Testing at Evolution 3. Install Permanent PAC Equipment IAC Design/Build TurnKey Solution THAT MEANS YOU DON’T HAVE TO. With POWER, rest assured that your project is getting done and done right. Sure, all projects have risks, but we identify and manage those risks with a proven, project-driven approach. www.powereng.com OVERHEAD & UNDERGROUND TRANSMISSION SUBSTATIONS | CONSTRUCTION MANAGEMENT ROUTING & SITING | ELECTRICAL SYSTEMS STUDIES | TESTING & COMMISSIONING GEOGRAPHIC INFORMATION SYSTEMS | UTILITY AUTOMATION | GAS TURBINE PLANT DESIGN COAL & SOLID FUEL PLANTS | RENEWABLE POWER | TELECOMMUNICATION SYSTEMS Call Today for YOUR plant’s Mercury Analysis RELIABLE & COMPREHENSIVE 1-800-334-7431 IAC is a worldwide leader in fabric filter baghouses, bulk storage and pneumatic conveying design/build equipment technology. Industrial Accessories Company 4800 Lamar Ave. Mission, KS 66202 www.iac-intl.com www.APPAnet.org JULY-AUGUST 2008 27 http://iac-intl.com/contact.htm http://www.powereng.com http://www.APPAnet.org
Table of Contents Feed for the Digital Edition of Public Power - July/August 2008 Public Power- July/August 2008 Contents Perspective 10 Questions Solar Energy Rising Sacramento's Solar Shares Gainesville Crowns a Conservation Idol By the Numbers Curbing Costs of Outages Reliability Green Energy Hometown Connections Customer Service Parting Shot Public Power - July/August 2008 Public Power - July/August 2008 - Public Power- July/August 2008 (Page Cover1) Public Power - July/August 2008 - Public Power- July/August 2008 (Page Cover2) Public Power - July/August 2008 - Public Power- July/August 2008 (Page 1) Public Power - July/August 2008 - Public Power- July/August 2008 (Page 2) Public Power - July/August 2008 - Contents (Page 3) Public Power - July/August 2008 - Contents (Page 4) Public Power - July/August 2008 - Contents (Page 5) Public Power - July/August 2008 - Contents (Page 6) Public Power - July/August 2008 - Contents (Page 7) Public Power - July/August 2008 - Contents (Page 8) Public Power - July/August 2008 - Contents (Page 9) Public Power - July/August 2008 - Perspective (Page 10) Public Power - July/August 2008 - Perspective (Page 11) Public Power - July/August 2008 - 10 Questions (Page 12) Public Power - July/August 2008 - 10 Questions (Page 13) Public Power - July/August 2008 - 10 Questions (Page 14) Public Power - July/August 2008 - 10 Questions (Page 15) Public Power - July/August 2008 - Solar Energy Rising (Page 16) Public Power - July/August 2008 - Solar Energy Rising (Page 17) Public Power - July/August 2008 - Solar Energy Rising (Page 18) Public Power - July/August 2008 - Solar Energy Rising (Page 19) Public Power - July/August 2008 - Solar Energy Rising (Page 20) Public Power - July/August 2008 - Solar Energy Rising (Page 21) Public Power - July/August 2008 - Solar Energy Rising (Page 22) Public Power - July/August 2008 - Solar Energy Rising (Page 23) Public Power - July/August 2008 - Solar Energy Rising (Page 24) Public Power - July/August 2008 - Solar Energy Rising (Page 25) Public Power - July/August 2008 - Solar Energy Rising (Page 26) Public Power - July/August 2008 - Solar Energy Rising (Page 27) Public Power - July/August 2008 - Sacramento's Solar Shares (Page 28) Public Power - July/August 2008 - Sacramento's Solar Shares (Page 29) Public Power - July/August 2008 - Sacramento's Solar Shares (Page 30) Public Power - July/August 2008 - Sacramento's Solar Shares (Page 31) Public Power - July/August 2008 - Gainesville Crowns a Conservation Idol (Page 32) Public Power - July/August 2008 - Gainesville Crowns a Conservation Idol (Page 33) Public Power - July/August 2008 - Gainesville Crowns a Conservation Idol (Page 34) Public Power - July/August 2008 - Gainesville Crowns a Conservation Idol (Page 35) Public Power - July/August 2008 - By the Numbers (Page 36) Public Power - July/August 2008 - By the Numbers (Page 37) Public Power - July/August 2008 - Curbing Costs of Outages (Page 38) Public Power - July/August 2008 - Curbing Costs of Outages (Page 39) Public Power - July/August 2008 - Reliability (Page 40) Public Power - July/August 2008 - Reliability (Page 41) Public Power - July/August 2008 - Green Energy (Page 42) Public Power - July/August 2008 - Green Energy (Page 43) Public Power - July/August 2008 - Green Energy (Page 44) Public Power - July/August 2008 - Hometown Connections (Page 45) Public Power - July/August 2008 - Customer Service (Page 46) Public Power - July/August 2008 - Customer Service (Page 47) Public Power - July/August 2008 - Parting Shot (Page 48) Public Power - July/August 2008 - Parting Shot (Page Cover3) Public Power - July/August 2008 - Parting Shot (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.