Hot Mix Asphalt Technology - January/February 2008 - (Page 40) Illinois Tollway Tests RAP continued Tollway has conducted regarding ground tire rubber (GTR) modified asphalt. • The N50 19.0-mm and N50 subbase mixtures are being used to compare the properties of PG 58-22 and PG 58-28 asphalt binders in higher-RAP mixtures. The last item listed above involves determining the degree of “softness” required when incorporating higher percentages of RAP into HMA. The industry agrees that a softer PG grade is required when using higher percentages of RAP. The analysis of the mixtures that contain the same mix proportions and vary the PG grade will help the Tollway determine which softer grade will be the most acceptable for its HMA. Through the Tollway’s advance work contract on I-90, the higherRAP HMA mix designs have already been created, the highOne issue with fast-tracking any research work involves funding, and the Tollway has limited research funding in its current budget to dedicate to this work. Mindful of the long-term benefits that this work could provide, these organizations contributed time, money and effort to make this research possible: • Rockford Blacktop • Rock Road Companies • Heritage Slag Products/The Levy Company • Rocky Mountain Enterprises, Inc. • Seneca Petroleum • Astec Mobile Screens • Illinois DOT speed processors to fractionate RAP have been set up, and several of the mixes have been produced successfully by Rockford Blacktop and Rock Road Companies to verify that the specified volumetric properties of each mix can be obtained. These higher-RAP densegraded and SMA test production mixes were developed through the Tollway’s materials consultant, S.T.A.T.E. Testing, and will be analyzed for fatigue and durability at the University of Illinois, and for moisture susceptibility by IDOT. The test results may be part of an upcoming University of Illinois research project sponsored by IDOT to study the impact of higher RAP contents on pavement structural performance. That study would be performed using high-RAP laboratory mixes with specific material resources taken from the Tollway’s I-90 project to allow for future comparison to high-RAP production mixes to be placed on the I-90 project. HMAT Ross Bentsen of Bloom Consultants, LLC, is providing materials engineering services to the Illinois Tollway. Steve Gillen is the materials manager for the Illinois Tollway. With advancements in burner development and combustion control systems, Hauck continues to provide the industry with products to • Increase Profitability • Lower NOx Emissions to Ultra-low Levels Without FGR • Support the Use of Multiple Fuels for maximum flexibility • Improve Energy Efficiency Through the Use of VFD and Mass Flow Control Designs Data Collection System BCS 6000 Control Panel PO Box 90, Lebanon, PA 17042 Phone: 717-272-3051 Fax: 717-273-9882 Hauck Manufacturing Company 40 • Hot Mix Asphalt Technology – JANUARY/FEBRUARY 2008 http://www.hauckburner.com
Table of Contents Feed for the Digital Edition of Hot Mix Asphalt Technology - January/February 2008 Hot Mix Asphalt Technology - January/February 2008 Contents Chairman's Commentary President's Perspective A Conversation with the New NCAT Director NCAT Test Track: Real-Time Testing for Real-World Results Warm Mix: The Lights are Green Illinois Tollway Tests RAP in Fast Forwarded Research Big Creek Teams with TxDOT to Pave Using Innovative Asphalt Mix Diamond Achievement Commendation Issues a Call for Quality Calendar of Events CONEXPO-CON/AGG Product Review Index of Advertisers Advertisers.com Hot Mix Asphalt Technology - January/February 2008 Hot Mix Asphalt Technology - January/February 2008 - Hot Mix Asphalt Technology - January/February 2008 (Page Cover1) Hot Mix Asphalt Technology - January/February 2008 - Hot Mix Asphalt Technology - January/February 2008 (Page Cover2) Hot Mix Asphalt Technology - January/February 2008 - Hot Mix Asphalt Technology - January/February 2008 (Page 3) Hot Mix Asphalt Technology - January/February 2008 - Hot Mix Asphalt Technology - January/February 2008 (Page 4) Hot Mix Asphalt Technology - January/February 2008 - Hot Mix Asphalt Technology - January/February 2008 (Page 5) Hot Mix Asphalt Technology - January/February 2008 - Hot Mix Asphalt Technology - January/February 2008 (Page 6) Hot Mix Asphalt Technology - January/February 2008 - Contents (Page 7) Hot Mix Asphalt Technology - January/February 2008 - Contents (Page 8) Hot Mix Asphalt Technology - January/February 2008 - Chairman's Commentary (Page 9) Hot Mix Asphalt Technology - January/February 2008 - President's Perspective (Page 10) Hot Mix Asphalt Technology - January/February 2008 - President's Perspective (Page 11) Hot Mix Asphalt Technology - January/February 2008 - A Conversation with the New NCAT Director (Page 12) Hot Mix Asphalt Technology - January/February 2008 - A Conversation with the New NCAT Director (Page 13) Hot Mix Asphalt Technology - January/February 2008 - A Conversation with the New NCAT Director (Page 14) Hot Mix Asphalt Technology - January/February 2008 - A Conversation with the New NCAT Director (Page 15) Hot Mix Asphalt Technology - January/February 2008 - A Conversation with the New NCAT Director (Page 16) Hot Mix Asphalt Technology - January/February 2008 - NCAT Test Track: Real-Time Testing for Real-World Results (Page 17) Hot Mix Asphalt Technology - January/February 2008 - NCAT Test Track: Real-Time Testing for Real-World Results (Page 18) Hot Mix Asphalt Technology - January/February 2008 - NCAT Test Track: Real-Time Testing for Real-World Results (Page 19) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 20) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 21) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 22) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 23) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 24) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 25) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 26) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 27) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 28) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 29) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 30) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 31) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 32) Hot Mix Asphalt Technology - January/February 2008 - Warm Mix: The Lights are Green (Page 33) Hot Mix Asphalt Technology - January/February 2008 - Illinois Tollway Tests RAP in Fast Forwarded Research (Page 34) Hot Mix Asphalt Technology - January/February 2008 - Illinois Tollway Tests RAP in Fast Forwarded Research (Page 35) Hot Mix Asphalt Technology - January/February 2008 - Illinois Tollway Tests RAP in Fast Forwarded Research (Page 36) Hot Mix Asphalt Technology - January/February 2008 - Illinois Tollway Tests RAP in Fast Forwarded Research (Page 37) Hot Mix Asphalt Technology - January/February 2008 - Illinois Tollway Tests RAP in Fast Forwarded Research (Page 38) Hot Mix Asphalt Technology - January/February 2008 - Illinois Tollway Tests RAP in Fast Forwarded Research (Page 39) Hot Mix Asphalt Technology - January/February 2008 - Illinois Tollway Tests RAP in Fast Forwarded Research (Page 40) Hot Mix Asphalt Technology - January/February 2008 - Illinois Tollway Tests RAP in Fast Forwarded Research (Page 41) Hot Mix Asphalt Technology - January/February 2008 - Illinois Tollway Tests RAP in Fast Forwarded Research (Page 42) Hot Mix Asphalt Technology - January/February 2008 - Illinois Tollway Tests RAP in Fast Forwarded Research (Page 43) Hot Mix Asphalt Technology - January/February 2008 - Illinois Tollway Tests RAP in Fast Forwarded Research (Page 44) Hot Mix Asphalt Technology - January/February 2008 - Big Creek Teams with TxDOT to Pave Using Innovative Asphalt Mix (Page 45) Hot Mix Asphalt Technology - January/February 2008 - Big Creek Teams with TxDOT to Pave Using Innovative Asphalt Mix (Page 46) Hot Mix Asphalt Technology - January/February 2008 - Big Creek Teams with TxDOT to Pave Using Innovative Asphalt Mix (Page 47) Hot Mix Asphalt Technology - January/February 2008 - Big Creek Teams with TxDOT to Pave Using Innovative Asphalt Mix (Page 48) Hot Mix Asphalt Technology - January/February 2008 - Big Creek Teams with TxDOT to Pave Using Innovative Asphalt Mix (Page 49) Hot Mix Asphalt Technology - January/February 2008 - Diamond Achievement Commendation Issues a Call for Quality (Page 50) Hot Mix Asphalt Technology - January/February 2008 - Diamond Achievement Commendation Issues a Call for Quality (Page 51) Hot Mix Asphalt Technology - January/February 2008 - Diamond Achievement Commendation Issues a Call for Quality (Page 52) Hot Mix Asphalt Technology - January/February 2008 - Diamond Achievement Commendation Issues a Call for Quality (Page 53) Hot Mix Asphalt Technology - January/February 2008 - Diamond Achievement Commendation Issues a Call for Quality (Page 54) Hot Mix Asphalt Technology - January/February 2008 - Diamond Achievement Commendation Issues a Call for Quality (Page 55) Hot Mix Asphalt Technology - January/February 2008 - Diamond Achievement Commendation Issues a Call for Quality (Page 56) Hot Mix Asphalt Technology - January/February 2008 - Diamond Achievement Commendation Issues a Call for Quality (Page 57) Hot Mix Asphalt Technology - January/February 2008 - Diamond Achievement Commendation Issues a Call for Quality (Page 58) Hot Mix Asphalt Technology - January/February 2008 - Diamond Achievement Commendation Issues a Call for Quality (Page 59) Hot Mix Asphalt Technology - January/February 2008 - Calendar of Events (Page 60) Hot Mix Asphalt Technology - January/February 2008 - Calendar of Events (Page 61) Hot Mix Asphalt Technology - January/February 2008 - CONEXPO-CON/AGG Product Review (Page 62) Hot Mix Asphalt Technology - January/February 2008 - CONEXPO-CON/AGG Product Review (Page 63) Hot Mix Asphalt Technology - January/February 2008 - CONEXPO-CON/AGG Product Review (Page 64) Hot Mix Asphalt Technology - January/February 2008 - CONEXPO-CON/AGG Product Review (Page 65) Hot Mix Asphalt Technology - January/February 2008 - CONEXPO-CON/AGG Product Review (Page 66) Hot Mix Asphalt Technology - January/February 2008 - CONEXPO-CON/AGG Product Review (Page 67) Hot Mix Asphalt Technology - January/February 2008 - CONEXPO-CON/AGG Product Review (Page 68) Hot Mix Asphalt Technology - January/February 2008 - CONEXPO-CON/AGG Product Review (Page 69) Hot Mix Asphalt Technology - January/February 2008 - CONEXPO-CON/AGG Product Review (Page 70) Hot Mix Asphalt Technology - January/February 2008 - CONEXPO-CON/AGG Product Review (Page 71) Hot Mix Asphalt Technology - January/February 2008 - Index of Advertisers (Page 72) Hot Mix Asphalt Technology - January/February 2008 - Index of Advertisers (Page 73) Hot Mix Asphalt Technology - January/February 2008 - Advertisers.com (Page 74) Hot Mix Asphalt Technology - January/February 2008 - Advertisers.com (Page Cover3) Hot Mix Asphalt Technology - January/February 2008 - Advertisers.com (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.