Hot Mix Asphalt Technology - March/April 2008 - (Page 48) San Diego Uses Porous Asphalt continued the porous pavement and underlying stone bed is cleaner than water washing off a traditional parking lot. Impurities such as drippings from cars, pesticides, and other materials can be trapped in the body of the pavement and in the stone bed. Proper care of the porous lot is important, however. The surface should not be sealcoated, but rather vacuumed to keep sand, dirt, and other materials from clogging up the pores at the asphalt surface and preventing water from filtering through the pavement structure. “Water quality is becoming very important to states and counties,” said Tom Cahill, president of Cahill Associates, who designed the lots for San Diego County. “Stormwater pollutants tend to get into the groundwater and streams. Porous asphalt pavements are proving to be an effective means of keeping pollutants from entering the water table.” Although the porous pavements do not require specialized training or equipment, they do require attention to best practices. ABC Construction did the laydown on all three lots. Vulcan Materials produced the asphalt and provided the aggregate. Construction at the Flinn Springs County Park parking lot began with a geotextile fabric over the subgrade to prevent fines from working upward into the stone recharge bed. Perforated pipes were installed to further assist water in draining into the water table. Construction crews then loaded a foot of rock on top of the subgrade (1.5 to 3.0-inch rock), followed by a 1-inch layer of small, single-sized stone. Paving crews laid 3 inches of asphalt with in 20 percent air voids on top of the rock. The to project required 570 pr tons of asphalt. “We to took the extra precaution of installing drains at the top of the pavement, so that if we get more than eight inches of rain, we have means to handle the overflow and not have it run directly into the creek,” said Dane Clingan, project manager for San Diego County. Paving practices Paving crews found the mix to be stickier than a traditional mix. “We had to make sure the truck drivers used a release agent on their tires to keep them from tracking the mix into the streets,” said Clingan. “During the construction, we also tried to keep the heavy equipment off the subgrade and to do limited compaction on the rock.” Clingan supervised the construction of all three lots, and sees a bright future for porous asphalt. “The projects look great and are holding up well,” he said. “I can see that in the future more lots will need to be porous pavements; they are an excellent means of managing stormwater.” HMAT The porous asphalt lot (right) absorbs water during a rainstorm while the traditional lot creates runoff. 48 • Hot Mix Asphalt Technology – MARCH/APRIL 2008
Table of Contents Feed for the Digital Edition of Hot Mix Asphalt Technology - March/April 2008 Hot Mix Asphalt Technology - March/April 2008 Contents Chairman’s Commentary Industry News Top-notch Teams Overcome Obstacles to Build the Nation’s Finest Roads Ecological Award Winners: Environmentally Sound, Neighbor Friendly Safety Award Winners: Rewards, Reminders and Technology Roadway Safety Program Trains Workers Preventing Back-overs Is Serious Business Driving Through Work Zones: Be Careful! San Diego Uses Porous Asphalt Lots for Stormwater Management Legislative Messages Tools for the Trade Calendar of Events Index of Advertisers Advertiser.com NAPA Roadmap to CONEXPO-CON/AGG Hot Mix Asphalt Technology - March/April 2008 Hot Mix Asphalt Technology - March/April 2008 - Hot Mix Asphalt Technology - March/April 2008 (Page Cover1) Hot Mix Asphalt Technology - March/April 2008 - Hot Mix Asphalt Technology - March/April 2008 (Page Cover2) Hot Mix Asphalt Technology - March/April 2008 - Hot Mix Asphalt Technology - March/April 2008 (Page 3) Hot Mix Asphalt Technology - March/April 2008 - Hot Mix Asphalt Technology - March/April 2008 (Page 4) Hot Mix Asphalt Technology - March/April 2008 - Hot Mix Asphalt Technology - March/April 2008 (Page 5) Hot Mix Asphalt Technology - March/April 2008 - Hot Mix Asphalt Technology - March/April 2008 (Page 6) Hot Mix Asphalt Technology - March/April 2008 - Contents (Page 7) Hot Mix Asphalt Technology - March/April 2008 - Contents (Page 8) Hot Mix Asphalt Technology - March/April 2008 - Chairman’s Commentary (Page 9) Hot Mix Asphalt Technology - March/April 2008 - Chairman’s Commentary (Page 10) Hot Mix Asphalt Technology - March/April 2008 - Industry News (Page 11) Hot Mix Asphalt Technology - March/April 2008 - Top-notch Teams Overcome Obstacles to Build the Nation’s Finest Roads (Page 12) Hot Mix Asphalt Technology - March/April 2008 - Top-notch Teams Overcome Obstacles to Build the Nation’s Finest Roads (Page 13) Hot Mix Asphalt Technology - March/April 2008 - Top-notch Teams Overcome Obstacles to Build the Nation’s Finest Roads (Page 14) Hot Mix Asphalt Technology - March/April 2008 - Top-notch Teams Overcome Obstacles to Build the Nation’s Finest Roads (Page 15) Hot Mix Asphalt Technology - March/April 2008 - Top-notch Teams Overcome Obstacles to Build the Nation’s Finest Roads (Page 16) Hot Mix Asphalt Technology - March/April 2008 - Top-notch Teams Overcome Obstacles to Build the Nation’s Finest Roads (Page 17) Hot Mix Asphalt Technology - March/April 2008 - Top-notch Teams Overcome Obstacles to Build the Nation’s Finest Roads (Page 18) Hot Mix Asphalt Technology - March/April 2008 - Top-notch Teams Overcome Obstacles to Build the Nation’s Finest Roads (Page 19) Hot Mix Asphalt Technology - March/April 2008 - Top-notch Teams Overcome Obstacles to Build the Nation’s Finest Roads (Page 20) Hot Mix Asphalt Technology - March/April 2008 - Ecological Award Winners: Environmentally Sound, Neighbor Friendly (Page 21) Hot Mix Asphalt Technology - March/April 2008 - Ecological Award Winners: Environmentally Sound, Neighbor Friendly (Page 22) Hot Mix Asphalt Technology - March/April 2008 - Ecological Award Winners: Environmentally Sound, Neighbor Friendly (Page 23) Hot Mix Asphalt Technology - March/April 2008 - Ecological Award Winners: Environmentally Sound, Neighbor Friendly (Page 24) Hot Mix Asphalt Technology - March/April 2008 - Ecological Award Winners: Environmentally Sound, Neighbor Friendly (Page 25) Hot Mix Asphalt Technology - March/April 2008 - Ecological Award Winners: Environmentally Sound, Neighbor Friendly (Page 26) Hot Mix Asphalt Technology - March/April 2008 - Safety Award Winners: Rewards, Reminders and Technology (Page 27) Hot Mix Asphalt Technology - March/April 2008 - Safety Award Winners: Rewards, Reminders and Technology (Page 28) Hot Mix Asphalt Technology - March/April 2008 - Safety Award Winners: Rewards, Reminders and Technology (Page 29) Hot Mix Asphalt Technology - March/April 2008 - Safety Award Winners: Rewards, Reminders and Technology (Page 30) Hot Mix Asphalt Technology - March/April 2008 - Safety Award Winners: Rewards, Reminders and Technology (Page 31) Hot Mix Asphalt Technology - March/April 2008 - Safety Award Winners: Rewards, Reminders and Technology (Page 32) Hot Mix Asphalt Technology - March/April 2008 - Safety Award Winners: Rewards, Reminders and Technology (Page 33) Hot Mix Asphalt Technology - March/April 2008 - Safety Award Winners: Rewards, Reminders and Technology (Page 34) Hot Mix Asphalt Technology - March/April 2008 - Safety Award Winners: Rewards, Reminders and Technology (Page 35) Hot Mix Asphalt Technology - March/April 2008 - Safety Award Winners: Rewards, Reminders and Technology (Page 36) Hot Mix Asphalt Technology - March/April 2008 - Roadway Safety Program Trains Workers (Page 37) Hot Mix Asphalt Technology - March/April 2008 - Roadway Safety Program Trains Workers (Page 38) Hot Mix Asphalt Technology - March/April 2008 - Preventing Back-overs Is Serious Business (Page 39) Hot Mix Asphalt Technology - March/April 2008 - Preventing Back-overs Is Serious Business (Page 40) Hot Mix Asphalt Technology - March/April 2008 - Preventing Back-overs Is Serious Business (Page 41) Hot Mix Asphalt Technology - March/April 2008 - Preventing Back-overs Is Serious Business (Page 42) Hot Mix Asphalt Technology - March/April 2008 - Preventing Back-overs Is Serious Business (Page 43) Hot Mix Asphalt Technology - March/April 2008 - Preventing Back-overs Is Serious Business (Page 44) Hot Mix Asphalt Technology - March/April 2008 - Driving Through Work Zones: Be Careful! (Page 45) Hot Mix Asphalt Technology - March/April 2008 - Driving Through Work Zones: Be Careful! (Page 46) Hot Mix Asphalt Technology - March/April 2008 - San Diego Uses Porous Asphalt Lots for Stormwater Management (Page 47) Hot Mix Asphalt Technology - March/April 2008 - San Diego Uses Porous Asphalt Lots for Stormwater Management (Page 48) Hot Mix Asphalt Technology - March/April 2008 - San Diego Uses Porous Asphalt Lots for Stormwater Management (Page 49) Hot Mix Asphalt Technology - March/April 2008 - San Diego Uses Porous Asphalt Lots for Stormwater Management (Page 50) Hot Mix Asphalt Technology - March/April 2008 - Legislative Messages (Page 51) Hot Mix Asphalt Technology - March/April 2008 - Legislative Messages (Page 52) Hot Mix Asphalt Technology - March/April 2008 - Tools for the Trade (Page 53) Hot Mix Asphalt Technology - March/April 2008 - Tools for the Trade (Page 54) Hot Mix Asphalt Technology - March/April 2008 - Tools for the Trade (Page 55) Hot Mix Asphalt Technology - March/April 2008 - Tools for the Trade (Page 56) Hot Mix Asphalt Technology - March/April 2008 - Tools for the Trade (Page 57) Hot Mix Asphalt Technology - March/April 2008 - Calendar of Events (Page 58) Hot Mix Asphalt Technology - March/April 2008 - Calendar of Events (Page 59) Hot Mix Asphalt Technology - March/April 2008 - Calendar of Events (Page 60) Hot Mix Asphalt Technology - March/April 2008 - Index of Advertisers (Page 61) Hot Mix Asphalt Technology - March/April 2008 - Index of Advertisers (Page 62) Hot Mix Asphalt Technology - March/April 2008 - Index of Advertisers (Page 63) Hot Mix Asphalt Technology - March/April 2008 - Index of Advertisers (Page 64) Hot Mix Asphalt Technology - March/April 2008 - Advertiser.com (Page 65) Hot Mix Asphalt Technology - March/April 2008 - Advertiser.com (Page 66) Hot Mix Asphalt Technology - March/April 2008 - Advertiser.com (Page Cover3) Hot Mix Asphalt Technology - March/April 2008 - Advertiser.com (Page Cover4) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-1) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-2) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-3) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-4) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-5) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-6) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-7) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-8) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-9) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-10) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-11) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-12) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-13) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-14) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-15) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-16) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-17) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-18) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-19) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-20) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-21) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-22) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-23) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-24) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-25) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-26) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-27) Hot Mix Asphalt Technology - March/April 2008 - NAPA Roadmap to CONEXPO-CON/AGG (Page Expo-28)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.