PRSM 2012 Best Practices - (Page 35)

rETrOFiTTiNg SigNAgE wiTh LEd TEChNOLOgy AUTHOR elena boone, director of Facilities COMPANY guitar center AUTHOR gregg ross, director of sales COMPANY broadway national sign & lighting chAllenge: Guitar Center, the largest retailer of musical instruments in the world with 224 locations throughout the United States, sought a strategy to retrofit its legacy building signage from neon to LED technology. This program aimed to provide significant energy cost reductions, mitigate maintenance costs and offer uniformity across the company’s signage portfolio without causing any delay in rectifying sign outages. Guitar Center’s interest in achieving these benefits was tempered by the upfront capital costs associated with retrofitting all signage in one time frame; hence, Guitar Center opted to retrofit its signage upon a maintenancetriggering event, or, as needed. This approach of retrofitting “as needed” led to an even greater challenge of having sign outages persist due to the lead times associated with scheduling service to identify repairs, as well as surveying signage for potential retrofit, performing ROI studies, material lead times and the scheduling of the retrofit. best PrActice: Upon meeting with Guitar Center’s national signage maintenance provider, a program was designed that avoided significant upfront capital and ensured the lead time of converting a sign would be consistent with the allowable time to repair it. The program included the following steps performed by the retailer’s service provider: 1. Surveyed all stores that had never been serviced to capture letter heights and depth of channel letters, identify if transformers were wired remotely or self-contained channel letters, etc. 2. Identified available utility rebates and filing requirements to qualify for incentives. 3. Provided a menu pricing schedule, including all associated costs, to retrofit each location’s signage (either by store or signage dimensions). 4. Included a payback analysis for each store that addresses energy savings, estimated maintenance savings, return on investment, etc. results: When Guitar Center stores’ report a service request for a signage repair, the company can immediately identify the costs and the ROI to retrofit the signage in real time. The company dispatches a request to retrofit the sign and the service provider is prepared to have the necessary materials, equipment and technicians on site within the standard SLA allowed for signage repairs. This practice is an effective way to retrofit Neon to LED signage at the time the signage requires service and makes the best use of Guitar Center’s capital, which in turn frees up additional funds to complete other projects. VeriFicAtion oF eFFiciency And sAVings cAPtured: Sample Scenario: • Signage Retrofit Project Cost: $2,475 • Average Signage Repair Cost: $550 • Average Number of Signage Repairs Per Store/Year: 2 • Annual Maintenance Savings: $1,100 • Estimated Annual Energy Savings: $287 • Total Annual Savings: $1,387 • Payback in Years: 1.8 years • Warranty: 5 years • Time Savings: Substantial administrative savings 2012 Best Practices | 35 http://www.prsm.com/bestpractices

Table of Contents for the Digital Edition of PRSM 2012 Best Practices

Conducting Multi-Site Paving Improvements to Ensure Continuity
Conducting Multi-Site Paving Improvements to Ensure Continuity
Exterior Rebranding
Exterior Rebranding
Getting the Most Value Out of Roof Management
Getting the Most Value Out of Roof Management
Pervious Concrete Pavement Solves Drainage Challenge
Pervious Concrete Pavement Solves Drainage Challenge
Pervious Pavement: Concrete Solutions to Driveway Stormwater Drainage and Sustainability Problems
Pervious Pavement: Concrete Solutions to Driveway Stormwater Drainage and Sustainability Problems
Applying Bipolar Ionization to Improve Indoor Air Quality and Save Energy
Determining Responsibility for Ceiling Leaks
HVAC Maintenance and Repairs Quote Review
Managing HVAC Energy Usage Without Installing an Energy Management System
Solving HVAC Issues on Landlord Operated Systems
Creating a Standardized Cleaning Chemical Program
Floor Replacement Planning and Execution
Improving Pest Control Monitoring to Maintain Store Cleanliness
Streamlining Store Cleaning Through Internal Benchmarking
LED Conversion Bolsters Ambiance, Bottom Line and Environment.
LED Gas Canopy Lighting Upgrade
Lighting Maintenance
Retrofitting Signage with LED Technology
Performing Basic Troubleshooting to Save Money
Implementing Repair Audits to Ensure Customer Safety
Improving Quality, Cost and Schedule Through Safety Education
Managing Extended Power Outages Through Emergency Response
Managing Risk Through Slip Resistance Testing
Creating Energy Teams to Pursue Opportunities
Formulating Green Solutions
Making Data Centers LEED Compliant
Outfitting Facilities with an Eye on ENERGY STAR Certification
Recycling Cooling Water From Air Conditioning Systems for Toilet and Landscaping Use
Sustainability-How the Facilities Team Can Contribute
Driving Down Waste Expense
Reducing Trash and Recycling Expense for Retail Locations
Transferring Compactor Maintenance to a Service Vendor
Waste Service Efficiency and Compliance
Waste Evaluation and Right Sizing to Reduce Cost
Asset and Service Warranty Tracking and Management: More Fully Realizing the Value of Budget Expenditures
Conducting an Organized Meeting
Proactive Maintenance Scheduling and Delivery
Repair Reductions by Participating in Design and Construction Table
Streamlining the Store Closing Process
Achieving Process Improvement Through Onsite Assessment of KPIs
Forecasting a Maintenance and Repair Budget
How to Calculate Return on Investment
Tracking Finances for Facilities
Centralizing Vendor Training and Management
Creating a Service Vendor Call Center to Save End Users’ Money
Answering a Call Status Challenge with an IVR Solution
Communicating Product Recalls Using a CMMS-Inspired Module
Doing More with Less and Saving Money in the Process
Ensuring the Accuracy of Web-Based Maintenance Requests
Establishing an End to End Procure-to-Pay Process
Leveraging Existing Technologies to Provide Updated Process Improvements
Quality Management of Bundled Periodic Services
Reduced Dashboard Time at Supply Houses
Parking Lot Management
Creating Best-In-Class Snow and Ice Management White Paper
Energy Savings/HVAC Air Filter Bypass
Managing a Retail Lighting Retrofit Project – Bright Ways to Improve Your Lighting and Your Bottom Line!
Managing Energy Usage with Interval Meter Calibration
Navigating the Department of Energy’s Higher Efficiency Regulations
Supplier Insights into Competitive Sourcing White Paper
Testing HVAC System Options to Reduce Costs and Labor
Understanding Retail Facilities Sourcing White Paper
Glossary of Acronyms and Terms
Index.

PRSM 2012 Best Practices

http://www.nxtbook.com/nxtbooks/naylor/PRSS0113
http://www.nxtbook.com/nxtbooks/naylor/PRSG0012
http://www.nxtbook.com/nxtbooks/naylor/PRSS0612
http://www.nxtbook.com/nxtbooks/naylor/PRSS0512
http://www.nxtbook.com/nxtbooks/naylor/PRSS0412
http://www.nxtbook.com/nxtbooks/naylor/PRSMBestPractices2012
http://www.nxtbook.com/nxtbooks/naylor/PRSS0312
http://www.nxtbook.com/nxtbooks/naylor/PRSS0212
http://www.nxtbook.com/nxtbooks/naylor/PRSS0112
http://www.nxtbook.com/nxtbooks/naylor/PRSG0011
http://www.nxtbook.com/nxtbooks/naylor/PRSS0611
http://www.nxtbook.com/nxtbooks/naylor/PRSS0511
http://www.nxtbook.com/nxtbooks/naylor/PRSS0411
http://www.nxtbook.com/nxtbooks/naylor/PRSS0311
http://www.nxtbook.com/nxtbooks/naylor/PRSS0211
http://www.nxtbook.com/nxtbooks/naylor/PRSS0111
http://www.nxtbook.com/nxtbooks/naylor/PRSS0610
http://www.nxtbook.com/nxtbooks/naylor/PRSS0510
http://www.nxtbook.com/nxtbooks/naylor/PRSS0410
http://www.nxtbook.com/nxtbooks/naylor/PRSS0310
http://www.nxtbook.com/nxtbooks/naylor/PRSS0210
http://www.nxtbook.com/nxtbooks/naylor/PRSS0110
http://www.nxtbook.com/nxtbooks/naylor/PRSS0609
http://www.nxtbook.com/nxtbooks/naylor/PRSS0509
http://www.nxtbook.com/nxtbooks/naylor/PRSS0409
http://www.nxtbook.com/nxtbooks/naylor/PRSS0309
http://www.nxtbook.com/nxtbooks/naylor/PRSS0209
http://www.nxtbook.com/nxtbooks/naylor/PRSS0109
http://www.nxtbookMEDIA.com