Contract - July/August 2013 - (Page 133)
First Floor Plan
6
7
3
5
Ground Floor Plan
4
3
2
1
Botín Foundation
Architect MVN Arquitectos
Designer Juan Luis Líbano
Client Botín Foundation
Where Madrid, Spain
What 16,600 total square feet
on two floors and a basement
Cost/sf $140
For a full project source
list, see page 146 or
visit contractdesign.com.
1
2
3
4
5
6
7
Entrance
Reception
Atrium
Public space
Boardroom
Open work area
Private office
Líbano, maintained the building’s industrial character by revealing its
original brickwork. The HVAC, lighting, and mechanical equipment
are also exposed.
Straightforward materials echo the building’s simple typology.
Steel painted black, glass, and oak define the interior throughout the
ground floor public space and first floor offices. Light oak flooring and
red oak longitudinal wall and ceiling slats differentiate the surfaces.
Polycarbonate panels let in natural light, afforded by the building’s
centerpiece: a two-story atrium and two skylights in the roof.
A living backdrop for public events
The skylight above the office space is outfitted with thermal glass to
reduce heat, but the skylight above the atrium must allow in ultraviolet
light to nourish the trees planted below. The architects removed a steel
truss to make room for the large wood “lantern” atop the atrium that
directs sunlight downward toward the trees and away from the office
space. The idea to plant trees grew from the need for something
vertical in that space to direct the eye upward. At first, Varela de Ugarte
considered a low-hanging light, but he later settled on the tall, straight
trees. “The living creatures give you the sensation of being outside in a
park,” he says. “It is the space people use most—many of the events are
under the trees.” Plant-like Vegetal chairs by Ronan & Erwan Bouroullec
are the perfect complement.
The ground floor space is uniquely flexible with an open plan
and two easily moveable partitions—one composed of transparent
glass and the other of opaque timber. The staff moves them nearly
every day for events, just as Botín Foundation envisioned. “The design
reflects the foundation’s commitment to transforming, creating, and
doing things differently,” says Iñigo Sáenz de Miera Cárdenas, the
foundation’s general director.
And as for that forboding alleyway, it was redesigned to guide
visitors to the entrance while telegraphing the warm, pared down
design language to be found inside. One wall is planted with vegetation
and the other is outfitted with a series of staggered and top-lit slatted
wood seats. “The scale of the cladding reduces the scale of the
buildings on both sides,” Varela de Ugarte says. “It gives you the
sensation of being embraced.” c
contract
http://www.contractdesign.com
Table of Contents for the Digital Edition of Contract - July/August 2013
Contract - July/August 2013
Contents
Editorial
Industry News
Columnist: Tips on Developing Winning Proposals
Product Focus: Geometry Rules
Product Focus: From Brazil to London
Product Focus: Drawn from the Sea
best of NeoCon®
Google Dublin
Autodesk Milan
Dental Clinic
Botín Foundation
Penhaligon’s
Competition: Inspirations Awards
Designers Select: Surfacing
Sources
Ad Index
Exhibition: MoMA Explores the Design Mind of Le Corbusier
Contract - July/August 2013
https://www.nxtbook.com/nxtbooks/contract/201405
https://www.nxtbook.com/nxtbooks/contract/201404
https://www.nxtbook.com/nxtbooks/contract/201403
https://www.nxtbook.com/nxtbooks/contract/iida_red2014
https://www.nxtbook.com/nxtbooks/contract/201401
https://www.nxtbook.com/nxtbooks/nielsen/contract_201312
https://www.nxtbook.com/nxtbooks/nielsen/contract_201311
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310_v2
https://www.nxtbook.com/nxtbooks/nielsen/contract_201309
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708_neocon_supplement
https://www.nxtbook.com/nxtbooks/nielsen/contract_201306
https://www.nxtbook.com/nxtbooks/nielsen/contract_201305
https://www.nxtbook.com/nxtbooks/nielsen/contract_201304
https://www.nxtbook.com/nxtbooks/nielsen/contract_201303
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130102
https://www.nxtbook.com/nxtbooks/nielsen/contract_201212
https://www.nxtbook.com/nxtbooks/nielsen/contract_201211
https://www.nxtbook.com/nxtbooks/nielsen/contract_201210
https://www.nxtbook.com/nxtbooks/nielsen/contract_201209
https://www.nxtbook.com/nxtbooks/nielsen/contract_ncw_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201206
https://www.nxtbook.com/nxtbooks/nielsen/contract_201205
https://www.nxtbook.com/nxtbooks/nielsen/contract_201204
https://www.nxtbook.com/nxtbooks/nielsen/contract_201203
https://www.nxtbook.com/nxtbooks/nielsen/contract_20120102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20111112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201110
https://www.nxtbook.com/nxtbooks/nielsen/contract_201109
https://www.nxtbook.com/nxtbooks/nielsen/contract_2011neoconwinners
https://www.nxtbook.com/nxtbooks/nielsen/contract_201108
https://www.nxtbook.com/nxtbooks/nielsen/contract_201106
https://www.nxtbook.com/nxtbooks/nielsen/contract_201105
https://www.nxtbook.com/nxtbooks/nielsen/contract_201104
https://www.nxtbook.com/nxtbooks/nielsen/contract_201103
https://www.nxtbook.com/nxtbooks/nielsen/contract_20110102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20101112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201010
https://www.nxtbook.com/nxtbooks/nielsen/contract_201009
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100708
https://www.nxtbook.com/nxtbooks/nielsen/contract_201006
https://www.nxtbook.com/nxtbooks/nielsen/contract_201005
https://www.nxtbook.com/nxtbooks/nielsen/contract_201004
https://www.nxtbook.com/nxtbooks/nielsen/contract_201003
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100102
https://www.nxtbook.com/nxtbooks/nielsen/contract_200911
https://www.nxtbook.com/nxtbooks/nielsen/contract_200909
https://www.nxtbook.com/nxtbooks/nielsen/contract_200910
https://www.nxtbook.com/nxtbooks/nielsen/contract_200908
https://www.nxtbook.com/nxtbooks/nielsen/contract_200907
https://www.nxtbook.com/nxtbooks/nielsen/contract_200906
https://www.nxtbook.com/nxtbooks/nielsen/contract_200905
https://www.nxtbook.com/nxtbooks/nielsen/contract_200904
https://www.nxtbook.com/nxtbooks/nielsen/contract_200903
https://www.nxtbook.com/nxtbooks/nielsen/contract_200902
https://www.nxtbook.com/nxtbooks/nielsen/contract_200901
https://www.nxtbookmedia.com