Chemical Processing - April 2008 - (Page 36) hemical plants vary widely in size and complexity — and so do the types of compressors used in them, and the compressors’ capacity control systems. The units often differ significantly from those at most industrial manufacturing plants using compressed air, where the most common compressor now is the oil-injected rotary screw. While chemical plants generally pose less variation in flow requirements from shift to shift than other manufacturing facilities, there can be differences in pressure requirements for the various processes, plus instrument air. Air quality requirements, including dryness, also may be stricter for some processes, requiring different drying and filtration methods. Each of these aspects may require segregation of some systems for more efficient operation. In addition, the cost of loss of production, due to an interruption of air supply, must be considered. We’ll look at these considerations. Demand profile It’s essential to know how, where and in what quantities compressed air is being used. List each process or application, together with the minimum, average and peak 36 • April 2008 C rates of ow and any cycle times on and off. Staggering the timing of peak demands can reduce the total maximum demand. One common problem is that distribution piping is sized for the average demand, with pressure drop based on that. When peak demand is signi cantly higher, the pressure drop also will be signi cantly higher, resulting in a lower pressure at the point of use or requiring a higher discharge pressure from the compressor(s). So, size distribution piping for the peak ow rate with an air velocity in the pipe not to exceed 30 ft/sec. Also, establish the required operating pressure for each process or application. Significant differences in required operating pressure may identify potential segregation of processes or applications for overall system efficiency. Operating the total compressed air supply at the highest required pressure results in increased power consumption (an approximately 1% increase for every 2 psi). Having a separate air supply at the required pressure for a specific process or application can improve overall system efficiency. In each case, ensure that sufficient backup air supply is available. While adequate primary compressed air storage (near the compressors) is essential for ef cient capacity control of www.chemicalprocessing.com http://www.chemicalprocessing.com
Table of Contents Feed for the Digital Edition of Chemical Processing - April 2008 Chemical Processing - April 2008 Contents From the Editor ChemicalProcessing.com Field Notes In Process Energy Saver Compliance Advisor Is It a Tragedy or Comedy for Engineers? Better Understanding Boosts Mixer Scale-up Don't Err With Air Compressors Control Performance Supervision Enhances Revamp Process Puzzler Plant InSites Equipment & Services Product Spotlight/Classifieds Ad Index End Point Chemical Processing - April 2008 Chemical Processing - April 2008 - Chemical Processing - April 2008 (Page Cover1) Chemical Processing - April 2008 - Chemical Processing - April 2008 (Page Cover2) Chemical Processing - April 2008 - Chemical Processing - April 2008 (Page 3) Chemical Processing - April 2008 - Chemical Processing - April 2008 (Page 4) Chemical Processing - April 2008 - Contents (Page 5) Chemical Processing - April 2008 - Contents (Page 6) Chemical Processing - April 2008 - From the Editor (Page 7) Chemical Processing - April 2008 - From the Editor (Page 8) Chemical Processing - April 2008 - ChemicalProcessing.com (Page 9) Chemical Processing - April 2008 - ChemicalProcessing.com (Page 10) Chemical Processing - April 2008 - Field Notes (Page 11) Chemical Processing - April 2008 - Field Notes (Page 12) Chemical Processing - April 2008 - In Process (Page 13) Chemical Processing - April 2008 - In Process (Page 14) Chemical Processing - April 2008 - In Process (Page 15) Chemical Processing - April 2008 - In Process (Page 16) Chemical Processing - April 2008 - Energy Saver (Page 17) Chemical Processing - April 2008 - Energy Saver (Page 18) Chemical Processing - April 2008 - Compliance Advisor (Page 19) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 20) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 21) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 22) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 23) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 24) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 25) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 26) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 27) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 28) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 29) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 30) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 31) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 32) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 33) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 34) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 35) Chemical Processing - April 2008 - Don't Err With Air Compressors (Page 36) Chemical Processing - April 2008 - Don't Err With Air Compressors (Page 37) Chemical Processing - April 2008 - Don't Err With Air Compressors (Page 38) Chemical Processing - April 2008 - Don't Err With Air Compressors (Page 39) Chemical Processing - April 2008 - Don't Err With Air Compressors (Page 40) Chemical Processing - April 2008 - Control Performance Supervision Enhances Revamp (Page 41) Chemical Processing - April 2008 - Control Performance Supervision Enhances Revamp (Page 42) Chemical Processing - April 2008 - Control Performance Supervision Enhances Revamp (Page 43) Chemical Processing - April 2008 - Control Performance Supervision Enhances Revamp (Page 44) Chemical Processing - April 2008 - Process Puzzler (Page 45) Chemical Processing - April 2008 - Process Puzzler (Page 46) Chemical Processing - April 2008 - Process Puzzler (Page 47) Chemical Processing - April 2008 - Plant InSites (Page 48) Chemical Processing - April 2008 - Equipment & Services (Page 49) Chemical Processing - April 2008 - Equipment & Services (Page 50) Chemical Processing - April 2008 - Equipment & Services (Page 51) Chemical Processing - April 2008 - Product Spotlight/Classifieds (Page 52) Chemical Processing - April 2008 - Product Spotlight/Classifieds (Page 53) Chemical Processing - April 2008 - Product Spotlight/Classifieds (Page 54) Chemical Processing - April 2008 - Product Spotlight/Classifieds (Page 55) Chemical Processing - April 2008 - Product Spotlight/Classifieds (Page 56) Chemical Processing - April 2008 - Ad Index (Page 57) Chemical Processing - April 2008 - End Point (Page 58) Chemical Processing - April 2008 - End Point (Page Cover3) Chemical Processing - April 2008 - End Point (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.