Chemical Processing - April 2008 - (Page 44) >> making it work perature controls have been notoriously difficult. Previous manual attempts at improving controller performance left us with controls that worked but were less than optimal. Using the integrated tuning and loop optimization tools within PlantTriage allowed us to push controller performance closer to optimal. The results were immediately apparent (Figure 3). The robust controller tuning approach eliminated loop cycling and interactions, adding a great deal of stability to the process. This, in turn, allowed APC to be used to the fullest, actively pushing the entire process toward optimum performance. We also focused on the control valve, because it’s the most likely point of failure in a control loop. Using valve travel diagnostics, we’ve been able to identify control valves with the highest level of wear. The root cause usually is related to tuning or inadequate instrument signal filters — and so can be addressed quite easily. Appropriate filtering and tuning can dramatically reduce valve travel. >> Improved performance Figure 3. Effective tuning provided close-to-optimal control of process variable. We’re now using the performance supervision tools to identify and eliminate bottlenecks, further increasing production. Standard measurements and thresholds — e.g., for valve stiction, valve hysteresis and instrument noise band — will guide future maintenance action for valves and instrumentation. Setting an accurate metric and a definite threshold helps in two ways, by: 1. drawing attention to valves and instruments as they start to deteriorate; and 2. reducing unnecessary maintenance. Hardware that performs within the thresholds receives low priority from the maintenance team. impressive results The startup was the quickest in our plant’s history. Borealis achieved production at the new nameplate capacity within 20 days after startup, with all product on-spec. The plant now is exceeding design output. It’s impossible to separately measure the return on investment from the operator training, advanced controls and performance supervision. However, the net effect was to reduce the start-up curve by several days. These investments also have paid for themselves in the ability to run the plant closer to bottlenecks. With 44 • April 2008 the increased capacity, Porvoo is pushing the process further and simultaneously hitting several new bottlenecks. These tools enable Borealis to drive closer to new production limits while at the same time adding stability and safety. “This was a fantastic start-up. The tools and techniques used at Porvoo are state-of-the-art, and helped us to deliver a high rate of return to our business,” says Hannu Luoto, Plant Manager at Porvoo. Maintaining good control performance and equipment reliability are key goals for the future. But Borealis also is continuing to find opportunities to improve. We’re now using the performance supervision tools to identify and eliminate bottlenecks, further increasing production. With most of the obvious constraints eliminated, we’re applying some of the more advanced tools to find and remove oscillations, improving efficiency even more and pushing production rates higher. As we integrate performance supervision into our daily routine, we expect to continue to uncover more opportunities not just to sustain but to continually improve plant performance. Borealis also is looking at the possibilities of applying these tools and techniques at plants around the world. CP Mikko Rönkä is an automation engineer with Borealis Polymers Oy, Porvoo, Finland. E-mail him at mikko.ronka@borealisgroup.com. George Buckbee, P.E., is director of product development at ExperTune, Inc., Hartland, Wis. E-mail him at george.buckbee@expertune.com. www.chemicalprocessing.com http://www.chemicalprocessing.com
Table of Contents Feed for the Digital Edition of Chemical Processing - April 2008 Chemical Processing - April 2008 Contents From the Editor ChemicalProcessing.com Field Notes In Process Energy Saver Compliance Advisor Is It a Tragedy or Comedy for Engineers? Better Understanding Boosts Mixer Scale-up Don't Err With Air Compressors Control Performance Supervision Enhances Revamp Process Puzzler Plant InSites Equipment & Services Product Spotlight/Classifieds Ad Index End Point Chemical Processing - April 2008 Chemical Processing - April 2008 - Chemical Processing - April 2008 (Page Cover1) Chemical Processing - April 2008 - Chemical Processing - April 2008 (Page Cover2) Chemical Processing - April 2008 - Chemical Processing - April 2008 (Page 3) Chemical Processing - April 2008 - Chemical Processing - April 2008 (Page 4) Chemical Processing - April 2008 - Contents (Page 5) Chemical Processing - April 2008 - Contents (Page 6) Chemical Processing - April 2008 - From the Editor (Page 7) Chemical Processing - April 2008 - From the Editor (Page 8) Chemical Processing - April 2008 - ChemicalProcessing.com (Page 9) Chemical Processing - April 2008 - ChemicalProcessing.com (Page 10) Chemical Processing - April 2008 - Field Notes (Page 11) Chemical Processing - April 2008 - Field Notes (Page 12) Chemical Processing - April 2008 - In Process (Page 13) Chemical Processing - April 2008 - In Process (Page 14) Chemical Processing - April 2008 - In Process (Page 15) Chemical Processing - April 2008 - In Process (Page 16) Chemical Processing - April 2008 - Energy Saver (Page 17) Chemical Processing - April 2008 - Energy Saver (Page 18) Chemical Processing - April 2008 - Compliance Advisor (Page 19) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 20) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 21) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 22) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 23) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 24) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 25) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 26) Chemical Processing - April 2008 - Is It a Tragedy or Comedy for Engineers? (Page 27) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 28) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 29) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 30) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 31) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 32) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 33) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 34) Chemical Processing - April 2008 - Better Understanding Boosts Mixer Scale-up (Page 35) Chemical Processing - April 2008 - Don't Err With Air Compressors (Page 36) Chemical Processing - April 2008 - Don't Err With Air Compressors (Page 37) Chemical Processing - April 2008 - Don't Err With Air Compressors (Page 38) Chemical Processing - April 2008 - Don't Err With Air Compressors (Page 39) Chemical Processing - April 2008 - Don't Err With Air Compressors (Page 40) Chemical Processing - April 2008 - Control Performance Supervision Enhances Revamp (Page 41) Chemical Processing - April 2008 - Control Performance Supervision Enhances Revamp (Page 42) Chemical Processing - April 2008 - Control Performance Supervision Enhances Revamp (Page 43) Chemical Processing - April 2008 - Control Performance Supervision Enhances Revamp (Page 44) Chemical Processing - April 2008 - Process Puzzler (Page 45) Chemical Processing - April 2008 - Process Puzzler (Page 46) Chemical Processing - April 2008 - Process Puzzler (Page 47) Chemical Processing - April 2008 - Plant InSites (Page 48) Chemical Processing - April 2008 - Equipment & Services (Page 49) Chemical Processing - April 2008 - Equipment & Services (Page 50) Chemical Processing - April 2008 - Equipment & Services (Page 51) Chemical Processing - April 2008 - Product Spotlight/Classifieds (Page 52) Chemical Processing - April 2008 - Product Spotlight/Classifieds (Page 53) Chemical Processing - April 2008 - Product Spotlight/Classifieds (Page 54) Chemical Processing - April 2008 - Product Spotlight/Classifieds (Page 55) Chemical Processing - April 2008 - Product Spotlight/Classifieds (Page 56) Chemical Processing - April 2008 - Ad Index (Page 57) Chemical Processing - April 2008 - End Point (Page 58) Chemical Processing - April 2008 - End Point (Page Cover3) Chemical Processing - April 2008 - End Point (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.