Chemical Processing - May 2008 - (Page 23) forts underway. This does seem to send a confusing message to end users who are looking for a single standard. (Incidentally, instrument vendors also would like a single standard and development path.) However, these groups have made huge strides in working together to allow us to obtain a successful wireless instrument network. HART 7 and ISA. HCF has provided the WirelessHART specification to SP100 — a joint analysis team has already identified a pathway forward to use WirelessHART at the instrument level. Don’t forget that ISA SP100 is a family of protocols; WirelessHART would fit in very well at the instrument level. HART 7 and Fieldbus. The Wireless Cooperation Team (WCT) is working towards a topology where WirelessHART can be used at the instrument level with Foundation Fieldbus or Profibus as the backbone to the host system. The WCT meets regularly and includes experts from all three protocols. With such cooperative efforts progressing and end-user pilots complete, there’s no reason to wait much longer to consider a WirelessHART project. Evolution not revolution The HART 7 specification has built upon the existing HART specification by adding wireless connectivity and other features to ensure reliability, security and simplicity of operation (Figure 5). So, yes, we can employ existing software tools including HART hand-held configurators; yes, the network is self-building and self-healing; and, yes, existing instruments can be used via a WirelessHART adapter. The WirelessHART topology. Every WirelessHART network has three main elements: 1. A gateway: It connects the control system (via Ethernet, Profibus, etc.) to the wireless network; 2. A network manager: This normally is part of the gateway and automatically builds the wireless network and manages its operation; and 3. Field instruments and devices: These usually consist of pressure, temperature, position or other instruments but also can include adapters. WirelessHART is an instrument level network using existing and new HART commands to access information. The instrument network connects to a WirelessHART gateway that builds the mesh topology and also connects to the host system via standard high-speed backbones such as Ethernet. How often is the information updated? The rate at which process information is transmitted over a wireless network directly impacts battery life for those instruments using battery power. WirelessHART offers several mechanisms to maximize battery life and use of the network capacity: • Transmit measurements at different rates for different instruments — for instance, level every 20 or 30 seconds, and flow every 1 or 2 seconds; www.chemicalprocessing.com http://www.discoversolex.com http://www.discoversolex.com http://www.chemicalprocessing.com
Table of Contents Feed for the Digital Edition of Chemical Processing - May 2008 From the Editor ChemicalProcessing.com Field Notes In Process Energy Saver Compliance Advisor WirelessHART signals a change at plants Avoid costly fabrication mistakes Watch out with variable speed pumping Hot cutover boosts control system migration Plant InSites Process Puzzler Equipment & Services Product Spotlight/Classifieds Ad Index End Point Chemical Processing - May 2008 Chemical Processing - May 2008 - (Page Cover1) Chemical Processing - May 2008 - (Page Cover2) Chemical Processing - May 2008 - (Page 3) Chemical Processing - May 2008 - (Page 4) Chemical Processing - May 2008 - (Page 5) Chemical Processing - May 2008 - (Page 6) Chemical Processing - May 2008 - (Page 7) Chemical Processing - May 2008 - (Page 8) Chemical Processing - May 2008 - From the Editor (Page 9) Chemical Processing - May 2008 - From the Editor (Page 10) Chemical Processing - May 2008 - ChemicalProcessing.com (Page 11) Chemical Processing - May 2008 - ChemicalProcessing.com (Page 12) Chemical Processing - May 2008 - Field Notes (Page 13) Chemical Processing - May 2008 - In Process (Page 14) Chemical Processing - May 2008 - In Process (Page 15) Chemical Processing - May 2008 - Energy Saver (Page 16) Chemical Processing - May 2008 - Compliance Advisor (Page 17) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 18) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 19) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 20) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 21) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 22) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 23) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 24) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 25) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 26) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 27) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 28) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 29) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 30) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 31) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 32) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 33) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 34) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 35) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 36) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 37) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 38) Chemical Processing - May 2008 - Hot cutover boosts control system migration (Page 39) Chemical Processing - May 2008 - Hot cutover boosts control system migration (Page 40) Chemical Processing - May 2008 - Hot cutover boosts control system migration (Page 41) Chemical Processing - May 2008 - Hot cutover boosts control system migration (Page 42) Chemical Processing - May 2008 - Process Puzzler (Page 43) Chemical Processing - May 2008 - Plant InSites (Page 44) Chemical Processing - May 2008 - Equipment & Services (Page 45) Chemical Processing - May 2008 - Product Spotlight/Classifieds (Page 46) Chemical Processing - May 2008 - Product Spotlight/Classifieds (Page 47) Chemical Processing - May 2008 - Product Spotlight/Classifieds (Page 48) Chemical Processing - May 2008 - Ad Index (Page 49) Chemical Processing - May 2008 - End Point (Page 50) Chemical Processing - May 2008 - End Point (Page Cover3) Chemical Processing - May 2008 - End Point (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.