Chemical Processing - May 2008 - (Page 41) < > >> Room for expansion Figure 2. This new cabinet houses a controller and I/O for a portion of the acrylonitrile unit. CPU and power supply modules (upper left) are redundant. times but never affected product, equipment or output. Much of the hot cutover was physically aided by hand jacks and bypasses. I’ve come to believe that every regulating valve should have a bypass if safety isn’t an issue. Hand jacks require too much care with settings to avoid the valve becoming fully opened or fully closed. We cut over the acrylonitrile unit without a process trip. However, failure of an associated ac power device due to a wiring error made after cutover caused a trip, but this wasn’t attributable to the automation or its cutover. Only one element of the former controls remained: a standalone PLC running truck and railcar loading. It was served by two HMIs in a setup that wouldn’t allow the operator to shift from one PC to the other once loading started. These controls were replaced at the end of the project with an HMI that communicates with the PLC over Modbus. This improvement will allow for loading to be controlled from anywhere on the system’s network. Significant benefits The hot cutover provided substantial savings. At our plant, the cost per day in lost acrylonitrile production is roughly $100,000 at today’s product value. A simple trip requires a 1.5-day restart. In addition, we’re gained a number of advantages from the new system: • There haven’t been any control failures due to the automation since conversion. • The plant turnaround in 2010 won’t be complicated or extended by the installation and startup of a new automation system. • The new system’s scalability and flexibility allows www.chemicalprocessing.com us to relatively easily add, enhance and change automation hardware, software and strategies to suit operations. One cabinet has already been fitted with a Modbus TCP/IP card for the fastest communications with Modbus devices. All cabinets have plenty of room for expansion with 20% spare conventional I/O capacity (Figures 2 and 3). Every new cabinet has a Foundation Fieldbus card and power conditioner even though no fieldbus has been installed yet. The adjacent catalysts plant,relies upon field devices very successfully served by Foundation Fieldbus, AS-Interface bus and Profibus DP segments. So, we aim to employ bus connections in the future in our units. • We’re finally using data from HART instrumentation that’s been in place for years. Secondary variables from Coriolis mass flow meters have been especially helpful, plus indications of oscillations in some valves, thanks to position feedback that couldn’t be sensed before. • The DeltaV Analyze tool is helping to identify nuisance alarms, and the system is enabling us to quash such alarms by suppressing a particular parameter alone, not the entire tag. For instance, we temporar- MONITOR VISCOSITY SIMPLY Sense Motor Horsepower with Universal Power Cell EASY INSTALLATION • No holes in tanks or pipes • Away from sensitive processes VERSATILE • One size adjusts for motors, from small up to 150 HP • Works on 3 phase, fixed or variable frequency, DC and single phase power SENSITIVE • 10 times more sensitive than just sensing amps CONVENIENT OUTPUTS • For meters, controllers, computers 4-20 milliamps, 0-10 volts CALL NOW FOR YOUR FREE 30-DAY TRIAL 888-600-3247 WWW.LOADCONTROLS.COM http://WWW.LOADCONTROLS.COM http://www.chemicalprocessing.com
Table of Contents Feed for the Digital Edition of Chemical Processing - May 2008 From the Editor ChemicalProcessing.com Field Notes In Process Energy Saver Compliance Advisor WirelessHART signals a change at plants Avoid costly fabrication mistakes Watch out with variable speed pumping Hot cutover boosts control system migration Plant InSites Process Puzzler Equipment & Services Product Spotlight/Classifieds Ad Index End Point Chemical Processing - May 2008 Chemical Processing - May 2008 - (Page Cover1) Chemical Processing - May 2008 - (Page Cover2) Chemical Processing - May 2008 - (Page 3) Chemical Processing - May 2008 - (Page 4) Chemical Processing - May 2008 - (Page 5) Chemical Processing - May 2008 - (Page 6) Chemical Processing - May 2008 - (Page 7) Chemical Processing - May 2008 - (Page 8) Chemical Processing - May 2008 - From the Editor (Page 9) Chemical Processing - May 2008 - From the Editor (Page 10) Chemical Processing - May 2008 - ChemicalProcessing.com (Page 11) Chemical Processing - May 2008 - ChemicalProcessing.com (Page 12) Chemical Processing - May 2008 - Field Notes (Page 13) Chemical Processing - May 2008 - In Process (Page 14) Chemical Processing - May 2008 - In Process (Page 15) Chemical Processing - May 2008 - Energy Saver (Page 16) Chemical Processing - May 2008 - Compliance Advisor (Page 17) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 18) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 19) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 20) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 21) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 22) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 23) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 24) Chemical Processing - May 2008 - WirelessHART signals a change at plants (Page 25) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 26) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 27) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 28) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 29) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 30) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 31) Chemical Processing - May 2008 - Avoid costly fabrication mistakes (Page 32) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 33) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 34) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 35) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 36) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 37) Chemical Processing - May 2008 - Watch out with variable speed pumping (Page 38) Chemical Processing - May 2008 - Hot cutover boosts control system migration (Page 39) Chemical Processing - May 2008 - Hot cutover boosts control system migration (Page 40) Chemical Processing - May 2008 - Hot cutover boosts control system migration (Page 41) Chemical Processing - May 2008 - Hot cutover boosts control system migration (Page 42) Chemical Processing - May 2008 - Process Puzzler (Page 43) Chemical Processing - May 2008 - Plant InSites (Page 44) Chemical Processing - May 2008 - Equipment & Services (Page 45) Chemical Processing - May 2008 - Product Spotlight/Classifieds (Page 46) Chemical Processing - May 2008 - Product Spotlight/Classifieds (Page 47) Chemical Processing - May 2008 - Product Spotlight/Classifieds (Page 48) Chemical Processing - May 2008 - Ad Index (Page 49) Chemical Processing - May 2008 - End Point (Page 50) Chemical Processing - May 2008 - End Point (Page Cover3) Chemical Processing - May 2008 - End Point (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.