Plant Services - March 2008 - (Page 20) CRITICAL CLEANING DEMANDS GOODWAY. CHILLER TUBE CLEANERS FOR SMOOTH AND ENHANCED TUBES Goodway’s line of Ream-A-Matics® makes tough tube cleaning a simple, one-person operation. Each machines uses a variety of quick connect brushes and cleaning tools mounted to the tip of a rotating flexible shaft, along with a simultaneous water flush, to remove deposits. Both electric and air powered units are available, as well as units with reversible shaft rotation, a shaft feeder gun, chemical injection, and a 500 PSI power flush. So the next time you need to clean your chiller — clean it the good way. To find out more, call Goodway today at 800-333-7467, or visit us online at www.goodway.com. Cold room reconstructed Problem-solvers meet trouble on a tight schedule emolition and reconstruction of a two-story, 11,000-sq.-ft. cold room within Sigma-Aldrich’s St. Louis chemical plant had barely begun when construction workers made a significant discovery. “We were working on one of the building’s exterior walls when we discovered the columns were rotted at the bottom,” says Tom Kreher, vice president for McCarthy (www.mc carthy.com). The company served as construction manager on the $9 million project. The problem was that the plans called for these columns to be reused. That was the first of several surprises that awaited the project team as they dug deeper into the 1930s-era structure. “You can plan and plan on a project like this,” Kreher says. AM Page 1 11:58 “But until you start the demolition process, you can’t be 100% sure of what you’re working with.” There were a few things, however, about which the project team could be absolutely certain. They knew they had 120 days to demolish and rebuild the space, without disturbing the chemical processing going on all around. They also knew that even a single day of overrun could wreak havoc for Sigma-Aldrich, which uses the 45°F cold room to produce more than 160 enzymes, proteins and other materials used in pharmaceutical research and production. Originally a foundry, the cold room had been built on a concrete slab with cinderblock walls. Inside sat 24 1,000- to 12,000- gallon tanks and more than 20 columns. With as many as 10 products in production at any given time, the tanks were plumbed by quick-connect hoses for production flexibility. Among the goals of the new construction was to improve the cold room’s throughput by simplifying and speeding the D ® www.goodway.com Innovative Maintenance Solutions Falk Complete Solution - 3.27 x 4.89.qxp 7/25/2007 FALKTM DRIVE ONE® The complete drive solution! Falk Drive One has the complete solution for conveyors, mixing, pumping, and most heavy duty drive applications. Call for details USA: 414-342-3131, South America: 56-2-231-5647, Europe: 44-1484-401842, Asia-Pacific: 65-6-444-0388, China: 86-21-64977890, Australia: 61-2-4962-8000 New, cleanable interior surfaces, well-organized piping runs and speedier product transitions were the preplanned parts of the project. www.rexnord.com 1-866-REXNORD 20 www.PLANTSERVICES.com March 2008 http://www.goodway.com http://www.mccarthy.com http://www.mccarthy.com http://www.goodway.com http://www.goodway.com http://www.rexnord.com http://www.PLANTSERVICES.com
Table of Contents Feed for the Digital Edition of Plant Services - March 2008 Plant Services - March 2008 Contents From The Editor Letters The PS Files Up and Running Crisis Corner What Works Asset Manager: Enterprise Thinking Technology Toolbox: Hydrogen In Action Cover Story: Get Real Electrical: Reliable Distribution Power Transmission: When the Belt Breaks Web Hunter: Tooting Horns In the Trenches Product Picks Classifieds Fast Facts Energy Expert: Energy versus Sustainability Plant Services - March 2008 Plant Services - March 2008 - Plant Services - March 2008 (Page Cover1) Plant Services - March 2008 - Plant Services - March 2008 (Page Cover2) Plant Services - March 2008 - Plant Services - March 2008 (Page 3) Plant Services - March 2008 - Plant Services - March 2008 (Page 4) Plant Services - March 2008 - Contents (Page 5) Plant Services - March 2008 - Contents (Page 6) Plant Services - March 2008 - From The Editor (Page 7) Plant Services - March 2008 - From The Editor (Page 8) Plant Services - March 2008 - Letters (Page 9) Plant Services - March 2008 - Letters (Page 10) Plant Services - March 2008 - The PS Files (Page 11) Plant Services - March 2008 - The PS Files (Page 12) Plant Services - March 2008 - Up and Running (Page 13) Plant Services - March 2008 - Up and Running (Page 14) Plant Services - March 2008 - Up and Running (Page 15) Plant Services - March 2008 - Up and Running (Page 16) Plant Services - March 2008 - Crisis Corner (Page 17) Plant Services - March 2008 - Crisis Corner (Page 18) Plant Services - March 2008 - What Works (Page 19) Plant Services - March 2008 - What Works (Page 20) Plant Services - March 2008 - What Works (Page 21) Plant Services - March 2008 - What Works (Page 22) Plant Services - March 2008 - Asset Manager: Enterprise Thinking (Page 23) Plant Services - March 2008 - Asset Manager: Enterprise Thinking (Page 24) Plant Services - March 2008 - Technology Toolbox: Hydrogen In Action (Page 25) Plant Services - March 2008 - Cover Story: Get Real (Page 26) Plant Services - March 2008 - Cover Story: Get Real (Page 27) Plant Services - March 2008 - Cover Story: Get Real (Page 28) Plant Services - March 2008 - Cover Story: Get Real (Page 29) Plant Services - March 2008 - Cover Story: Get Real (Page 30) Plant Services - March 2008 - Cover Story: Get Real (Page 31) Plant Services - March 2008 - Cover Story: Get Real (Page 32) Plant Services - March 2008 - Cover Story: Get Real (Page 33) Plant Services - March 2008 - Electrical: Reliable Distribution (Page 34) Plant Services - March 2008 - Electrical: Reliable Distribution (Page 35) Plant Services - March 2008 - Electrical: Reliable Distribution (Page 36) Plant Services - March 2008 - Power Transmission: When the Belt Breaks (Page 37) Plant Services - March 2008 - Power Transmission: When the Belt Breaks (Page 38) Plant Services - March 2008 - Power Transmission: When the Belt Breaks (Page 39) Plant Services - March 2008 - Power Transmission: When the Belt Breaks (Page 40) Plant Services - March 2008 - Web Hunter: Tooting Horns (Page 41) Plant Services - March 2008 - Web Hunter: Tooting Horns (Page 42) Plant Services - March 2008 - Web Hunter: Tooting Horns (Page 43) Plant Services - March 2008 - In the Trenches (Page 44) Plant Services - March 2008 - In the Trenches (Page 45) Plant Services - March 2008 - In the Trenches (Page 46) Plant Services - March 2008 - Product Picks (Page 47) Plant Services - March 2008 - Classifieds (Page 48) Plant Services - March 2008 - Fast Facts (Page 49) Plant Services - March 2008 - Energy Expert: Energy versus Sustainability (Page 50) Plant Services - March 2008 - Energy Expert: Energy versus Sustainability (Page Cover3) Plant Services - March 2008 - Energy Expert: Energy versus Sustainability (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.