Up Time Magazine- August/September 2008 - (Page 35) IMC-2008 FREE Bonus Workshops Monday, December 8 Enhance your IMC-2008 and CMMS-2008 learning experience by taking advantage of the FREE Bonus Workshops on Monday December 8. IMC-2008 and CMMS-2008 already provide 12 hours toward CPMM and CMRP and other professional re-certification. Each workshop is valued at 6 additional hours of credit toward CPMM and CMRP Re-certification. A certificate will be provided for each workshop. Each individual workshop includes workshop material, breakfast, lunch, refreshment and snack breaks. Who is Eligible to Attend Bonus Workshops? You must buy a 3 day pass and be a maintenance and reliability professional working at a recognized manufacturing, utility, process company or government agency to register for a Bonus Workshop. By the request of bonus workshop leaders, no consultants or vendors. The Reliability Transformation Workshop by Allied Reliability Services and the Ron Moore Group December 9th-11th Learn how to help a fictitious company, ABC Company make “The Reliability Transformation” in this three day interactive experience featuring some of the top reliability experts in the world - the participants. Allied Reliability, Ron Moore Group and Reliabilityweb. com present the much anticipated, Reliability Transformation Workshop. Each day builds on the previous as you watch ABC Company take its journey to reliability. The information below provides some background on the ABC Company that details their current situation and their anticipated growth needs. ABC Company is growing and currently sold out in one of its major businesses. Market demand is expected to increase substantially within the next 5 years. Current production capacity is limited and not expected to be able to meet the increasing demand within the next 12-24 months. They need to expand capacity. Join us on a 3-day journey with the ABC Company. Explore their options - investing capital in building new capacity, acquiring a competitor’s assets, or getting more production from their existing assets - and help them to determine which will help them meet the market demands for production capacity. You and your peers will actively assist with the engineering of The Reliability Transformation through a facilitated experience. Day 1 – Facilitated by: Ron Moore, Andy Page, John Schultz, and Ricky Smith Day 2 – You will pre-register for one of the 3hour workshops in the morning., which cover five essential topics. The learning from this workshop will then be applied as you work on solving a real world problems for ABC Company in the afternoon as a focus team. Day 3 – Andy Page and Jose Wilkins - You will present your solutions to the class. These presentations will be video recorded to share with the maintenance and reliability community online. Fundamentals of Maintenance – The Foundation to Equipment Reliability by Verl Davis, AssetPoint Reliability PM Optimization by Steve Turner, OMCS Reliability Awareness Workshop by Timken Reliability Services Work Management (Planning) Simulation The Manufacturing Game® The Reliability Game® Overall Equipment Effectiveness (OEE) and US Sugar Plant Tour by Life Cycle Engineering IMC-2008 Pre Conference Workshops Tuesday, December 9th Enhance your IMC-2008 learning experience by registering for a pre-conference workshop. IMC-2008 already provides 12 hours toward CMRP, CPMM and other professional Re-certification. Each workshop is valued at 6 additional hours of credit toward CMRP or CPMM Re-certification. A certificate will be provided for each workshop. Choose from these fine workshops: Maintenance 101 Things You Must Know to Have a Proactive Maintenance Organization & Maintenance 201 More Things You Must Know To Have A Proactive Maintenance Organization by Bruce Hawkins, CMRP, MRG Inc. Lean Maintenance by Joel Levitt, Author, Lean Maintenance Creating Culture Change for Maintenance & Reliability Professionals by Stephen J. Thomas, Author - Successfully Managing Change in Organizations Reliability Tools in a Capital Project from FEL I through Execution by Bob DiFrancesco, ARMS Reliability Engineers Maintenance Planning Workshop by Jeff Shiver, People and Processes Covanta “Energy From Waste” (EfW) Plant Tour/ Association for Maintenance Professionals Breakthrough Benchmarking Exercise for more info or to register visit us online - www.maintenanceconference.com s http://www.maintenanceconference.com
Table of Contents Feed for the Digital Edition of Up Time Magazine- August/September 2008 Up Time Magazine- August/September 2008 Contents Upfront Upclose Information Technology Lubrication Infrared Maintenance Management Motor Testing Precision Maintenance Reliability Ultrasound Vibration Upgrade Up Time Magazine- August/September 2008 Up Time Magazine- August/September 2008 - Up Time Magazine- August/September 2008 (Page Cover1) Up Time Magazine- August/September 2008 - Up Time Magazine- August/September 2008 (Page Cover2) Up Time Magazine- August/September 2008 - Up Time Magazine- August/September 2008 (Page 1) Up Time Magazine- August/September 2008 - Up Time Magazine- August/September 2008 (Page 2) Up Time Magazine- August/September 2008 - Up Time Magazine- August/September 2008 (Page 3) Up Time Magazine- August/September 2008 - Up Time Magazine- August/September 2008 (Page 4) Up Time Magazine- August/September 2008 - Contents (Page 5) Up Time Magazine- August/September 2008 - Upfront (Page 6) Up Time Magazine- August/September 2008 - Upfront (Page 7) Up Time Magazine- August/September 2008 - Upclose (Page 8) Up Time Magazine- August/September 2008 - Upclose (Page 9) Up Time Magazine- August/September 2008 - Upclose (Page 10) Up Time Magazine- August/September 2008 - Upclose (Page 11) Up Time Magazine- August/September 2008 - Upclose (Page 12) Up Time Magazine- August/September 2008 - Upclose (Page 13) Up Time Magazine- August/September 2008 - Upclose (Page 14) Up Time Magazine- August/September 2008 - Upclose (Page 15) Up Time Magazine- August/September 2008 - Upclose (Page 16) Up Time Magazine- August/September 2008 - Upclose (Page 17) Up Time Magazine- August/September 2008 - Upclose (Page 18) Up Time Magazine- August/September 2008 - Upclose (Page 19) Up Time Magazine- August/September 2008 - Upclose (Page 20) Up Time Magazine- August/September 2008 - Upclose (Page 21) Up Time Magazine- August/September 2008 - Information Technology (Page 22) Up Time Magazine- August/September 2008 - Information Technology (Page 23) Up Time Magazine- August/September 2008 - Information Technology (Page 24) Up Time Magazine- August/September 2008 - Information Technology (Page 25) Up Time Magazine- August/September 2008 - Lubrication (Page 26) Up Time Magazine- August/September 2008 - Lubrication (Page 27) Up Time Magazine- August/September 2008 - Lubrication (Page 28) Up Time Magazine- August/September 2008 - Lubrication (Page 29) Up Time Magazine- August/September 2008 - Infrared (Page 30) Up Time Magazine- August/September 2008 - Infrared (Page 31) Up Time Magazine- August/September 2008 - Infrared (Page 32) Up Time Magazine- August/September 2008 - Infrared (Page 33) Up Time Magazine- August/September 2008 - Infrared (Page 34) Up Time Magazine- August/September 2008 - Infrared (Page 35) Up Time Magazine- August/September 2008 - Infrared (Page 36) Up Time Magazine- August/September 2008 - Infrared (Page 37) Up Time Magazine- August/September 2008 - Infrared (Page 38) Up Time Magazine- August/September 2008 - Infrared (Page 39) Up Time Magazine- August/September 2008 - Maintenance Management (Page 40) Up Time Magazine- August/September 2008 - Maintenance Management (Page 41) Up Time Magazine- August/September 2008 - Maintenance Management (Page 42) Up Time Magazine- August/September 2008 - Maintenance Management (Page 43) Up Time Magazine- August/September 2008 - Motor Testing (Page 44) Up Time Magazine- August/September 2008 - Motor Testing (Page 45) Up Time Magazine- August/September 2008 - Motor Testing (Page 46) Up Time Magazine- August/September 2008 - Motor Testing (Page 47) Up Time Magazine- August/September 2008 - Motor Testing (Page 48) Up Time Magazine- August/September 2008 - Motor Testing (Page 49) Up Time Magazine- August/September 2008 - Precision Maintenance (Page 50) Up Time Magazine- August/September 2008 - Precision Maintenance (Page 51) Up Time Magazine- August/September 2008 - Precision Maintenance (Page 52) Up Time Magazine- August/September 2008 - Precision Maintenance (Page 53) Up Time Magazine- August/September 2008 - Reliability (Page 54) Up Time Magazine- August/September 2008 - Reliability (Page 55) Up Time Magazine- August/September 2008 - Reliability (Page 56) Up Time Magazine- August/September 2008 - Reliability (Page 57) Up Time Magazine- August/September 2008 - Ultrasound (Page 58) Up Time Magazine- August/September 2008 - Ultrasound (Page 59) Up Time Magazine- August/September 2008 - Ultrasound (Page 60) Up Time Magazine- August/September 2008 - Ultrasound (Page 61) Up Time Magazine- August/September 2008 - Vibration (Page 62) Up Time Magazine- August/September 2008 - Vibration (Page 63) Up Time Magazine- August/September 2008 - Vibration (Page 64) Up Time Magazine- August/September 2008 - Vibration (Page 65) Up Time Magazine- August/September 2008 - Vibration (Page 66) Up Time Magazine- August/September 2008 - Vibration (Page 67) Up Time Magazine- August/September 2008 - Upgrade (Page 68) Up Time Magazine- August/September 2008 - Upgrade (Page 69) Up Time Magazine- August/September 2008 - Upgrade (Page 70) Up Time Magazine- August/September 2008 - Upgrade (Page 71) Up Time Magazine- August/September 2008 - Upgrade (Page 72) Up Time Magazine- August/September 2008 - Upgrade (Page Cover3) Up Time Magazine- August/September 2008 - Upgrade (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.