Consulting-Specifying Engineer - February 2008 - (Page 21) Cover Story 2. List the nature of the control signal required for each of these devices 3. For each controlled device, select the process variable 4. Define the relationship between the process variable and the controlled device 5. Identify the various parameters that are required for this relationship 6. Define the control logic required to produce the parameters 7. Determine discrete or analog conditions that apply to each process 8. Define the logic or write the sequences that describe the discrete and analog conditions necessary. Identify the devices to be controlled in each system. First, look at one building system holistically. For example, an airhandling unit may consist of the follow- ing devices to be controlled, as shown in Figure 1: • Fan start/stop & fan variable speed drive • Mixed air dampers • Cooling coil valve • Heating coil valve • Humidifier. For each of these controlled devices, the next seven steps need to be considered. List the nature of the control signal required for each of these devices. For this air handler, this list of required control signals would be: • Fan start/stop: digital output (DO) point for the fan starter circuit • VSD: analog output (AO) point • Mixed air dampers: AO point or points • Coiling coil valve: AO point • Heating coil valve: AO point. Select the process variable (Pv) for each of these control loops. For our example this list of process variables might look like this: • Fan start/stop: Pv = time, internal time schedule • VSD: Pv = static pressure, duct sensor (AI) point • Mixed air dampers: Pv = temperature, mixed air temperature sensor (AI) point • Coiling coil valve: Pv = temperature, discharge air temperature sensor (AI) point • Heating coil valve: Pv = temperature, discharge air temperature sensor (AI) point. Supply fan Cooling Heating Mixed Air Humidification Figure 1: Logic diagram for five devices controlled within an air handling unit. The cooling application shows an example of output variable from one controller provides input to another controller. In this case, discharge temperature setpoint shall be reset between 62 and 55 F as return air temperature rises from 65 to 70 F. Source: Facility Dynamics Consulting-Specifying Engineer • FEBRUARY 2008 21
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - February 2008 Consulting-Specifying Engineer - February 2008 Contents Viewpoint News M/E Roundtable How To Write Control Sequences Mentoring Engineers: Myths, Motivations, and Models Keep Young Electrical Engineers Grounded Protecting a Vulnerable Population Codes & Standards Case Study New Products Equipment Lifecycles Advertisers Index Green Space Consulting-Specifying Engineer - February 2008 Consulting-Specifying Engineer - February 2008 - Consulting-Specifying Engineer - February 2008 (Page Cover1) Consulting-Specifying Engineer - February 2008 - Consulting-Specifying Engineer - February 2008 (Page Cover2) Consulting-Specifying Engineer - February 2008 - Consulting-Specifying Engineer - February 2008 (Page 1) Consulting-Specifying Engineer - February 2008 - Consulting-Specifying Engineer - February 2008 (Page 2) Consulting-Specifying Engineer - February 2008 - Contents (Page 3) Consulting-Specifying Engineer - February 2008 - Contents (Page 4) Consulting-Specifying Engineer - February 2008 - Contents (Page 5) Consulting-Specifying Engineer - February 2008 - Contents (Page 6) Consulting-Specifying Engineer - February 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - February 2008 - News (Page 8) Consulting-Specifying Engineer - February 2008 - News (Page 9) Consulting-Specifying Engineer - February 2008 - News (Page 10) Consulting-Specifying Engineer - February 2008 - News (Page 11) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 12) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 13) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 20) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 21) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 22) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 23) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 24) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 25) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 26) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 27) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 28) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 29) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 30) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 31) Consulting-Specifying Engineer - February 2008 - Keep Young Electrical Engineers Grounded (Page 32) Consulting-Specifying Engineer - February 2008 - Keep Young Electrical Engineers Grounded (Page 33) Consulting-Specifying Engineer - February 2008 - Keep Young Electrical Engineers Grounded (Page 34) Consulting-Specifying Engineer - February 2008 - Keep Young Electrical Engineers Grounded (Page 35) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 36) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 37) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 38) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 39) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 40) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 41) Consulting-Specifying Engineer - February 2008 - Codes & Standards (Page 42) Consulting-Specifying Engineer - February 2008 - Codes & Standards (Page 43) Consulting-Specifying Engineer - February 2008 - Case Study (Page 44) Consulting-Specifying Engineer - February 2008 - New Products (Page 45) Consulting-Specifying Engineer - February 2008 - New Products (Page 46) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 47) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 48) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 49) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 50) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 51) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 52) Consulting-Specifying Engineer - February 2008 - Advertisers Index (Page 53) Consulting-Specifying Engineer - February 2008 - Green Space (Page 54) Consulting-Specifying Engineer - February 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - February 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.