Consulting-Specifying Engineer - February 2008 - (Page 45) New Products » » » » » » » » » » » » » » » INPUT RS# AT WWW.CSEMAG.COM/QUICKRESPONSE » » E-MAIL PRODUCT NEWS TO CSEPRODUCTS@REEDBUSINESS.COM » Featured Product Inverter compressor system The VRV III system from Daikin AC is the 7th generation of the original launched in 1982 and has been completely re-engineered for taller and larger buildings. The system features the new Daikin Inverter compressor system to ensure demand satisfaction throughout connected zones across the complete operation cycle. With a choice of 460V/3Ph/60Hz or 208-230V/3Ph/60Hz, the heat pump or heat recovery configurations power up to 20-ton capacity from a single piping network. The system allows up to 41 indoor fan coil units, a 200% connection index, and integrated controls, with BMS options and piping limitations. Total pipe length has been increased 328% to 3,280 ft. www.daikinac.com #1 Flush meter Combine hands-free operating with state-of-the-art, water-saving dual-flush features. The ECOS Dual-Flush Flushometer from Sloan Valve offers users two water-efficient flush options: a green button for a reduced flush of 1.1 gallon per flush for liquids or a chrome button to initiate a standard 1.6 gallon per flush for solids. Should a user not depress a button, the product’s Dual-Flush Smart Sense Technology will initiate a flush cycle, based on how long the user remains in the sensor range. www.sloanecos.com #2 Controller For enhanced capabilities with Square D Clipsal lighting control system, the Square D Clipsal Pascal Automation Controller provides expansive scheduling capability and facilitates operation of third-party products through two RS232 ports from input devices such as keypads and touchscreen. The controller easily is installed with standard Cat-5 cable and supports a variety of commands including if/then commands. The 2.8-in. x 2.5-in. x 3.6-in. controller features a real-time system clock and a 24-hour internal capacitor backup. www.squaredlightingcontrol.com #3 Condensing boiler Consider the improved features of AERCO’s Modulex line of boilers. Each unit in the 300,000 to 1 million Btuh condensing boiler line is equipped with a boiler communications module to enhance communications and support integration with BAS. Each boiler in the line combines between two and seven independent, 151,500 Btuh, pre-assembled thermal modules, housed in a common enclosure. The line is available in six different sizes with modulating capabilities from 6:1 to 23:1 and offers a quiet operation of less than 50 decibels. www.aerco.com #4 Consulting-Specifying Engineer • FEBRUARY 2008 45 http://WWW.CSEMAG.COM/QUICKRESPONSE http://www.daikinac.com http://www.sloanecos.com http://www.squaredlightingcontrol.com http://www.aerco.com
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - February 2008 Consulting-Specifying Engineer - February 2008 Contents Viewpoint News M/E Roundtable How To Write Control Sequences Mentoring Engineers: Myths, Motivations, and Models Keep Young Electrical Engineers Grounded Protecting a Vulnerable Population Codes & Standards Case Study New Products Equipment Lifecycles Advertisers Index Green Space Consulting-Specifying Engineer - February 2008 Consulting-Specifying Engineer - February 2008 - Consulting-Specifying Engineer - February 2008 (Page Cover1) Consulting-Specifying Engineer - February 2008 - Consulting-Specifying Engineer - February 2008 (Page Cover2) Consulting-Specifying Engineer - February 2008 - Consulting-Specifying Engineer - February 2008 (Page 1) Consulting-Specifying Engineer - February 2008 - Consulting-Specifying Engineer - February 2008 (Page 2) Consulting-Specifying Engineer - February 2008 - Contents (Page 3) Consulting-Specifying Engineer - February 2008 - Contents (Page 4) Consulting-Specifying Engineer - February 2008 - Contents (Page 5) Consulting-Specifying Engineer - February 2008 - Contents (Page 6) Consulting-Specifying Engineer - February 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - February 2008 - News (Page 8) Consulting-Specifying Engineer - February 2008 - News (Page 9) Consulting-Specifying Engineer - February 2008 - News (Page 10) Consulting-Specifying Engineer - February 2008 - News (Page 11) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 12) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 13) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - February 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 20) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 21) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 22) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 23) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 24) Consulting-Specifying Engineer - February 2008 - How To Write Control Sequences (Page 25) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 26) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 27) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 28) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 29) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 30) Consulting-Specifying Engineer - February 2008 - Mentoring Engineers: Myths, Motivations, and Models (Page 31) Consulting-Specifying Engineer - February 2008 - Keep Young Electrical Engineers Grounded (Page 32) Consulting-Specifying Engineer - February 2008 - Keep Young Electrical Engineers Grounded (Page 33) Consulting-Specifying Engineer - February 2008 - Keep Young Electrical Engineers Grounded (Page 34) Consulting-Specifying Engineer - February 2008 - Keep Young Electrical Engineers Grounded (Page 35) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 36) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 37) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 38) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 39) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 40) Consulting-Specifying Engineer - February 2008 - Protecting a Vulnerable Population (Page 41) Consulting-Specifying Engineer - February 2008 - Codes & Standards (Page 42) Consulting-Specifying Engineer - February 2008 - Codes & Standards (Page 43) Consulting-Specifying Engineer - February 2008 - Case Study (Page 44) Consulting-Specifying Engineer - February 2008 - New Products (Page 45) Consulting-Specifying Engineer - February 2008 - New Products (Page 46) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 47) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 48) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 49) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 50) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 51) Consulting-Specifying Engineer - February 2008 - Equipment Lifecycles (Page 52) Consulting-Specifying Engineer - February 2008 - Advertisers Index (Page 53) Consulting-Specifying Engineer - February 2008 - Green Space (Page 54) Consulting-Specifying Engineer - February 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - February 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.