Consulting-Specifying Engineer - March 2008 - (Page 16) M/E Roundtable PARTICIPANTS VFDs, harmonics drive power quality debate This month’s panel of experts discusses how to mitigate harmonic effects, passive and active filters, and technological advances with these systems and VFDs. BY PATRICK LYNCH, Editorial Intern CSE: In the design phase, what ensures that variable frequency drives (VFDs) don’t cause harmonic distortion? JIM NASH: The first step is to analyze what portion of the total connected load VFDs represent. Most commercial and industrial installations tolerate up to 20% drive loading before additional hardware needs to be considered. This assumes that the drives to be installed have at least 3% ac line reactance or dc link reactance as a part of their standard designs. If the drives don’t include internal reactance, then the system tolerance level drops to about 10%. Likewise, special locations, such as airports and hospitals, have lower harmonic tolerance levels where 10% loading may represent the permissible threshold even when drive designs do include reactance as standard. If it is known that these levels will be exceeded, then a formal harmonic analysis should be made. The drive vendor may be able to assist in providing a first order analysis that includes harmonic mitigation recommendations. If considering this approach, be prepared to provide a network one-line diagram that includes both expected drive loads and other loads. Keep in mind that accurately establishing the ratio between nonlinear loads—such as VFDs—and linear loads (across-the-line motors, incandescent lighting, etc.) is vitally important to accurately predicting harmonic content. Establishing the kVA and impedance of the utility transformer (or generator) also is necessary. Finally, the short circuit capacity of the utility feed at the primary of the utility transformer should be obtained from the utility. The appropriate harmonic solution will vary based on various installation factors. If the level of excess harmonic content is relatively small, the addition of simple passive filters will probably be most cost-effective. If the level of excess harmonic content is high and many drives are involved, installation of an active filter will likely be most appropriate. Finally, if the level of harmonic content is high and only a small number of large drives are involved, then installing drives with active front-ends probably is the best solution. SYED PEERAN: Much depends on the distribution system. Smaller drives, typically less than 50-hp rating, can be six-pulse with passive filters. Larger drives can be the harmonic-free type or the 18-pulse or higher pulse drives. Still larger drives can be the active front-end type drives. One must select the most cost-effective combination. Satisfactory harmonic performance must be verified by a comprehensive harmonic analysis. KEN CARR: If the VFD is installed in an existing facility, there are several options to minimize harmonic distortion, in increasing order of benefit/ cost: An ac line reactor: Specifying a 3% ac line reactor at the input to the drive usually will reduce the total harmonic current distortion (THID) to approximately half of what it would be otherwise. Harmonic filter: Consider a passive, resonant-based harmonic filter that effectively traps the lower current harmonics, such as the fifth, seventh, 11th, etc. Isolation transformer: Installing an isolation transformer to supply the VFD will reduce the primary-side current harmonics sufficiently to meet IEEE 519 at the point of common coupling. Active filter: Installing the right active filter at the input to the drive can reduce the THID to as low as 3%. Installing VFD in a new facility, there are Ken Carr Team Leader Baldor Electric Fort Smith, Ark. Ken Lovorn, PE President, Chief Engineer Lovorn Engineering Pittsburgh Jim Nash Principal Engineer ABB Inc. New Berlin, Wis. Syed Peeran, PE Senior Engineer Camp Dresser & McKee Inc. Cambridge, Mass. 16 Consulting-Specifying Engineer • MARCH 2008 16
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - March 2008 Consulting-Specifying Engineer - March 2008 Contents Viewpoint Letters News M/E Roundtable Grade A HVAC When UPS and Gensets Have Issues Ignite Opportunities To Mentor Fire Protection Engineers Cooling People, Not Buildings Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Pure Power Supplement Edison Institute Honors Recovery Efforts Canada Launches Clean Energy Software Climate Change Drives Increased Investment Critical Power for R&D Heating Calculations for Electrical Duct Bank Submetering for Energy Profiling New Products Consulting-Specifying Engineer - March 2008 Consulting-Specifying Engineer - March 2008 - (Page Intro) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page Cover1) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page Cover2) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page 1) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page 2) Consulting-Specifying Engineer - March 2008 - Contents (Page 3) Consulting-Specifying Engineer - March 2008 - Contents (Page 4) Consulting-Specifying Engineer - March 2008 - Contents (Page 5) Consulting-Specifying Engineer - March 2008 - Contents (Page 6) Consulting-Specifying Engineer - March 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - March 2008 - Letters (Page 8) Consulting-Specifying Engineer - March 2008 - Letters (Page 9) Consulting-Specifying Engineer - March 2008 - News (Page 10) Consulting-Specifying Engineer - March 2008 - News (Page 11) Consulting-Specifying Engineer - March 2008 - News (Page 12) Consulting-Specifying Engineer - March 2008 - News (Page 13) Consulting-Specifying Engineer - March 2008 - News (Page 14) Consulting-Specifying Engineer - March 2008 - News (Page 15) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 24) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 25) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 26) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 27) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 28) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 29) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 30) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 31) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 32) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 33) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 34) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 35) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 36) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 37) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 38) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 39) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 40) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 41) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 42) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 43) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 44) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 45) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 46) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 47) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 48) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 49) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 50) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 51) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 52) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 53) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 54) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 55) Consulting-Specifying Engineer - March 2008 - Case Study (Page 56) Consulting-Specifying Engineer - March 2008 - Case Study (Page 57) Consulting-Specifying Engineer - March 2008 - New Products (Page 58) Consulting-Specifying Engineer - March 2008 - New Products (Page 59) Consulting-Specifying Engineer - March 2008 - New Products (Page 60) Consulting-Specifying Engineer - March 2008 - New Products (Page 61) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 66) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 67) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 68) Consulting-Specifying Engineer - March 2008 - Advertiser Index (Page 69) Consulting-Specifying Engineer - March 2008 - Green Space (Page 70) Consulting-Specifying Engineer - March 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - March 2008 - Green Space (Page Cover4) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page SuppCover1) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page SuppCover2) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page Supp1) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page Supp2) Consulting-Specifying Engineer - March 2008 - Edison Institute Honors Recovery Efforts (Page Supp3) Consulting-Specifying Engineer - March 2008 - Canada Launches Clean Energy Software (Page Supp4) Consulting-Specifying Engineer - March 2008 - Canada Launches Clean Energy Software (Page Supp5) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp6) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp6A) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp8B) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp7) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp8) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp9) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp10) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp11) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp12) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp13) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp14) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp15) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp16) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp17) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp18) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp19) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp20) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp21) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp22) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp23) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp24) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp25) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp26) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp27) Consulting-Specifying Engineer - March 2008 - New Products (Page Supp28) Consulting-Specifying Engineer - March 2008 - New Products (Page SuppCover3) Consulting-Specifying Engineer - March 2008 - New Products (Page SuppCover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.