Consulting-Specifying Engineer - March 2008 - (Page 50) The purpose of the visit was to demonstrate a large, applied chilled-water system to a group not familiar with such systems. It was impressive to see a huge equipment room in the subbasement with an intricate set of large pipes, many sets of large pumps, and multiple air handlers on each floor with ductwork streaming out of them to a number of VAV boxes. On the obligatory tour of the roof to see the cooling towers, we were surprised to find a multitude of small condensing units quietly tucked in and around the cooling towers and the other roof equipment. Evidently, due to additional cooling loads that were added after the building was occupied, variable refrigerant volume units had been easily retrofitted to provide cooling. It was intriguing to see central and vari- Rows of individual variable refrigerant volume air-cooled condensers are shown on typical rooftop installation. Photo: John H. Suzukida able refrigerant volume systems working in harmony on the same building. But what was most intriguing about this was the perspective of first showing the large equipment room for the chillers, BETTER BUILDING security http://www.steelconduit.org …Is Just a Click Away. Learn how steel conduit protects not just your wiring and conductors, but your electronic equipment, lighting and alarm systems. Visit us at the web address above, then click on “Benefits.” space on each floor for the air handlers, and multiple large cooling towers on the roof to people who were not familiar with those systems. Then we saw, placed around the multiple cooling towers, a number of small, very quietly running air-cooled condensing units for a variable refrigerant volume system. It was quite a contrast in systems, size, and complexity. The point? It’s not that one particular system is better than any other, but that there are definitely applications that are suited toward certain system types or combinations of types. Our responsibility is to keep an open mind for the best solutions for particular buildings and how they’re used. It’s widely known that chilled water is one answer, but rooftop, self-contained, water-source heat pumps, split systems, aircooled, water-cooled, and variable refrigerant volume systems that have been in use for more than 25 years all over the world are all good options. Properly designed, they are options that can give the owner, the building, and its occupants a comfort solution that is ideal for their application. It’s eye-opening and mind-broadening to see a multitude of applications where chilled water is mixed with variable refrigerant volume systems, or where standalone variable refrigerant volume systems are installed in buildings that looked like applications where you would find “conventional systems.” As we further address energy conservation in our buildings to respond to the rising cost of energy and reduce their environmental impact, it is comforting to know we have options, which had their origins in countries where energy has been more expensive for a longer time than the United States. Cooling people, not buildings, may be the way we choose in the future and using variable refrigerant volume systems is one way to achieve that objective. Suzukida is president of Lanex Consulting LLC, Shoreview, Minn. He is a member of CSE’s editorial advisory board. 2000 Ponce de Leon, Suite 600, Coral Gables, Florida 33134, (305) 443-1603 • www.steeltubeinstitute.org Input #228 at csemag.com/quickResponse 50 Consulting-Specifying Engineer • MARCH 2008 http://www.steelconduit.org http://www.steelconduit.org http://www.steelconduit.org http://csemag.com/quickResponse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - March 2008 Consulting-Specifying Engineer - March 2008 Contents Viewpoint Letters News M/E Roundtable Grade A HVAC When UPS and Gensets Have Issues Ignite Opportunities To Mentor Fire Protection Engineers Cooling People, Not Buildings Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Pure Power Supplement Edison Institute Honors Recovery Efforts Canada Launches Clean Energy Software Climate Change Drives Increased Investment Critical Power for R&D Heating Calculations for Electrical Duct Bank Submetering for Energy Profiling New Products Consulting-Specifying Engineer - March 2008 Consulting-Specifying Engineer - March 2008 - (Page Intro) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page Cover1) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page Cover2) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page 1) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page 2) Consulting-Specifying Engineer - March 2008 - Contents (Page 3) Consulting-Specifying Engineer - March 2008 - Contents (Page 4) Consulting-Specifying Engineer - March 2008 - Contents (Page 5) Consulting-Specifying Engineer - March 2008 - Contents (Page 6) Consulting-Specifying Engineer - March 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - March 2008 - Letters (Page 8) Consulting-Specifying Engineer - March 2008 - Letters (Page 9) Consulting-Specifying Engineer - March 2008 - News (Page 10) Consulting-Specifying Engineer - March 2008 - News (Page 11) Consulting-Specifying Engineer - March 2008 - News (Page 12) Consulting-Specifying Engineer - March 2008 - News (Page 13) Consulting-Specifying Engineer - March 2008 - News (Page 14) Consulting-Specifying Engineer - March 2008 - News (Page 15) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 24) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 25) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 26) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 27) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 28) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 29) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 30) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 31) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 32) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 33) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 34) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 35) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 36) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 37) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 38) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 39) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 40) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 41) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 42) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 43) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 44) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 45) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 46) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 47) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 48) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 49) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 50) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 51) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 52) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 53) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 54) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 55) Consulting-Specifying Engineer - March 2008 - Case Study (Page 56) Consulting-Specifying Engineer - March 2008 - Case Study (Page 57) Consulting-Specifying Engineer - March 2008 - New Products (Page 58) Consulting-Specifying Engineer - March 2008 - New Products (Page 59) Consulting-Specifying Engineer - March 2008 - New Products (Page 60) Consulting-Specifying Engineer - March 2008 - New Products (Page 61) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 66) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 67) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 68) Consulting-Specifying Engineer - March 2008 - Advertiser Index (Page 69) Consulting-Specifying Engineer - March 2008 - Green Space (Page 70) Consulting-Specifying Engineer - March 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - March 2008 - Green Space (Page Cover4) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page SuppCover1) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page SuppCover2) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page Supp1) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page Supp2) Consulting-Specifying Engineer - March 2008 - Edison Institute Honors Recovery Efforts (Page Supp3) Consulting-Specifying Engineer - March 2008 - Canada Launches Clean Energy Software (Page Supp4) Consulting-Specifying Engineer - March 2008 - Canada Launches Clean Energy Software (Page Supp5) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp6) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp6A) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp8B) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp7) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp8) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp9) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp10) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp11) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp12) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp13) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp14) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp15) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp16) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp17) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp18) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp19) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp20) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp21) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp22) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp23) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp24) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp25) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp26) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp27) Consulting-Specifying Engineer - March 2008 - New Products (Page Supp28) Consulting-Specifying Engineer - March 2008 - New Products (Page SuppCover3) Consulting-Specifying Engineer - March 2008 - New Products (Page SuppCover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.