Consulting-Specifying Engineer - March 2008 - (Page 56) Case Study Relay eliminates power failures AT A GLANCE t’s no secret that building evacuations disrupt productive workflow. And building evacuations may be caused when power fails to restore automatically through automatic and reliable transfers. Engineers can minimize power failures through transfer switches by following the model set by ARX Engineering, Alberta, Canada. Within a one-year period, three major facilities in Calgary, Alberta, experienced a failure of the utility source when power failed to restore automatically—resulting in building evacuations. The increased frequency of power-transfer scheme failures is attributable to the age of the equipment in these large commercial buildings and the use of archaic technologies. These designs use devices such as electromechanical relays and pneumatic timers, which have a limited service lifecycle, in comparison to the more advanced micro-processor-based devices. “Rather than continue to repair these problematic systems, ARX was determined to design a new modern protection and control scheme,” said Roland Davidson, R.E.T., operations manager at ARX Engineering. “The goal was a solution that would not only improve reliability but also enhance the performance of the system.” With the backing of Brookfield Property Management and Oxford Properties, ARX Engineering designed a retrofit transfer scheme that improves reliability, meets the current utility requirements, provides enhanced protection features, and offers feedback to the building operators. After consultation with Schweitzer Engineering Laboratories, Pullman, Wash., the design was constructed with a powerful and flexible microprocessor-controlled protective relay, the SEL-351 Directional Overcurrent and Reclosing Relay. The SEL-351 Relay is widely used at utilities and substations around the world because of its extensive monitoring, protection, communications, and automation features. I The transfer scheme replaced electromechanical relays and pneumatic timers (top). The new microprocessor-based relays (bottom) provide more functionality and reliability. Source: ARX Engineering Three facilities in Calgary, Alberta, experienced power failures due to poor transfer switches. Rather than repair problematic systems, ARX Engineering solved the problem by designing a retrofit transfer scheme constructed with the microprocessor-controlled SEL-351 Relay from Schweitzer Engineering Laboratories. The relay features a breaker wear monitor; station batter monitor; remote and local control switches; synchrophasor measurements; and overcurrent protection that uses a secure mix of phase, negativesequence, and ground overcurrent. For more information on the relay, go to www.selinc.com. “At one facility, we installed two SEL-351 Relays on each of the main breakers plus four SEL-551C Overcurrent/Reclosing Relays on the feeder breakers,” Davidson said. “The scheme is a 25 kV preferred source with a hot alternate. Many of the major office towers in downtown Calgary are serviced by a 25 kV network with the preferred feed in one building being the alternate in an adjacent building. Upon the failure of one of the 25 kV feeds, the affected buildings will transfer automatically to their alternate source. The local utility (ENMAX) will then restore the buildings back to their original state after the problem is corrected under a defined procedure.” Transfer scheme design parameters include a selectable preferred source, automated and synchronized transfer to a second source in case of power sags or other disturbances, and remote alarm notification to the building engineering staff should there be a loss of the standby (secondary) source. Overcurrent protection and lockout features are standard functions of the SEL-351 Relay. “Event reports, communications, load profiling, ease of installation, flexible programmable logic, and enhanced protection features have considerably improved the reliability of this system for the property owners,” Davidson said. With the successful installation of this system at five facilities within the Calgary marketplace, the building owners have seen the benefits of the installation in that they have not experienced any malfunctions and have renewed confidence in the event of a problem with the alternate supply. An unforeseen benefit is that they now are aware when the utility transfers them onto the alternate source without notification, and they are aware if there is a problem with the utility alternate source. Information provided by ARX Engineering, Calgary, Alberta. 56 Consulting-Specifying Engineer • MARCH 2008 http://www.selinc.com
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - March 2008 Consulting-Specifying Engineer - March 2008 Contents Viewpoint Letters News M/E Roundtable Grade A HVAC When UPS and Gensets Have Issues Ignite Opportunities To Mentor Fire Protection Engineers Cooling People, Not Buildings Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Pure Power Supplement Edison Institute Honors Recovery Efforts Canada Launches Clean Energy Software Climate Change Drives Increased Investment Critical Power for R&D Heating Calculations for Electrical Duct Bank Submetering for Energy Profiling New Products Consulting-Specifying Engineer - March 2008 Consulting-Specifying Engineer - March 2008 - (Page Intro) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page Cover1) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page Cover2) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page 1) Consulting-Specifying Engineer - March 2008 - Consulting-Specifying Engineer - March 2008 (Page 2) Consulting-Specifying Engineer - March 2008 - Contents (Page 3) Consulting-Specifying Engineer - March 2008 - Contents (Page 4) Consulting-Specifying Engineer - March 2008 - Contents (Page 5) Consulting-Specifying Engineer - March 2008 - Contents (Page 6) Consulting-Specifying Engineer - March 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - March 2008 - Letters (Page 8) Consulting-Specifying Engineer - March 2008 - Letters (Page 9) Consulting-Specifying Engineer - March 2008 - News (Page 10) Consulting-Specifying Engineer - March 2008 - News (Page 11) Consulting-Specifying Engineer - March 2008 - News (Page 12) Consulting-Specifying Engineer - March 2008 - News (Page 13) Consulting-Specifying Engineer - March 2008 - News (Page 14) Consulting-Specifying Engineer - March 2008 - News (Page 15) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - March 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 24) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 25) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 26) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 27) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 28) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 29) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 30) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 31) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 32) Consulting-Specifying Engineer - March 2008 - Grade A HVAC (Page 33) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 34) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 35) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 36) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 37) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 38) Consulting-Specifying Engineer - March 2008 - When UPS and Gensets Have Issues (Page 39) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 40) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 41) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 42) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 43) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 44) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 45) Consulting-Specifying Engineer - March 2008 - Ignite Opportunities To Mentor Fire Protection Engineers (Page 46) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 47) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 48) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 49) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 50) Consulting-Specifying Engineer - March 2008 - Cooling People, Not Buildings (Page 51) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 52) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 53) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 54) Consulting-Specifying Engineer - March 2008 - Codes & Standards (Page 55) Consulting-Specifying Engineer - March 2008 - Case Study (Page 56) Consulting-Specifying Engineer - March 2008 - Case Study (Page 57) Consulting-Specifying Engineer - March 2008 - New Products (Page 58) Consulting-Specifying Engineer - March 2008 - New Products (Page 59) Consulting-Specifying Engineer - March 2008 - New Products (Page 60) Consulting-Specifying Engineer - March 2008 - New Products (Page 61) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 66) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 67) Consulting-Specifying Engineer - March 2008 - Equipment Lifecycles (Page 68) Consulting-Specifying Engineer - March 2008 - Advertiser Index (Page 69) Consulting-Specifying Engineer - March 2008 - Green Space (Page 70) Consulting-Specifying Engineer - March 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - March 2008 - Green Space (Page Cover4) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page SuppCover1) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page SuppCover2) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page Supp1) Consulting-Specifying Engineer - March 2008 - Pure Power Supplement (Page Supp2) Consulting-Specifying Engineer - March 2008 - Edison Institute Honors Recovery Efforts (Page Supp3) Consulting-Specifying Engineer - March 2008 - Canada Launches Clean Energy Software (Page Supp4) Consulting-Specifying Engineer - March 2008 - Canada Launches Clean Energy Software (Page Supp5) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp6) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp6A) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp8B) Consulting-Specifying Engineer - March 2008 - Climate Change Drives Increased Investment (Page Supp7) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp8) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp9) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp10) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp11) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp12) Consulting-Specifying Engineer - March 2008 - Critical Power for R&D (Page Supp13) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp14) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp15) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp16) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp17) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp18) Consulting-Specifying Engineer - March 2008 - Heating Calculations for Electrical Duct Bank (Page Supp19) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp20) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp21) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp22) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp23) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp24) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp25) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp26) Consulting-Specifying Engineer - March 2008 - Submetering for Energy Profiling (Page Supp27) Consulting-Specifying Engineer - March 2008 - New Products (Page Supp28) Consulting-Specifying Engineer - March 2008 - New Products (Page SuppCover3) Consulting-Specifying Engineer - March 2008 - New Products (Page SuppCover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.