Consulting-Specifying Engineer - June 2008 - (Page 36) ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// that an increasing amount of equipment is required to be on emergency power, especially during a disaster and its aftermath. Queen’s wasn’t the only hospital affected by the earthquake; indeed, for those 12 hours, no hospital in Hawaii had enough emergency power to maintain 100% operation. At the time of the earthquake, Queen’s had approximately 1.25 MW of emergency power, while the facility peak demand is slightly more than 6 MW. Coupled with the fact that Hawaii’s electric company, HECO, isn’t on a grid that stretches from other states and cooperates with other utilities, hospital administrators could see the writing on the wall. Queen’s needed to upgrade its emergency power system. The Aloha State is beautiful, but during a single one-week period in August 2007, Hawaii experienced a hurricane warning, an earthquake, a tsunami warning spurred by the earthquake, and flash fires on one or more of the islands. Disaster preparedness in Hawaii is a must, so the hospital’s electrical system had to be redesigned to withstand most any disaster. The medical center needed only an additional 5 MW of power to supplement its existing power, but the age of the existing generators—and the benefits of the redundancy—made it clear that the redesign should include extra capacity. The emergency power system also should be above flood level. Based on space constraints and emergency planning, the hospital building was designed in four levels (see Figure 2). Each level was designed to withstand up to a Category 5 hurricane, with the building overall capable of withstanding the seismic activity in Honolulu. As a result of the power system redesign, Level One includes a new utility service entrance 11.5-kV switchgear, upgrading the existing service from two feeds from the same substation to three feeds from two different substations. The emergency system was designed to include 8 MW of power at 11.5 kV, the current distribution voltage throughout Hawaii and on the Queen’s Medical Center campus. The parallel switchgear was designed In October 2006, an earthquake knocked out utility power at Queen’s Medical Center in Honolulu for 12 hours. Photo: TLC Engineering to accommodate four 2-MW generators, without future generator space for expansion, and is located on Level Two. The addition of these generators provides Queen’s with sufficient capacity to handle the current load with any single generator in the system down. Even with two 2-MW generators down, the system can handle the majority of the load with the existing generator system and the new system online. The switchgear provides power throughout the campus through a dual-radial system, which serves most of the buildings via a belowgrade tunnel. Queen’s is evaluating the potential to modify the system to a loop configuration to further enhance reliability. The generators, which have direct-mounted radiators, are on Levels Three and Four. Providing the radiator as a directly coupled unit was a design challenge based on the space available—but worth the effort. If remote radiators were located on the roof, they would need to be protected from flying debris in a hurricane, and because the radiators were required to operate when the generator operates, significant safeguards would have been ROOF LEVEL FOUR – GENERATOR B-1 AND B-2 LEVEL THREE – GENERATOR A-1 AND A-2 LEVEL TWO – PARALLEL SWITCHGEAR LEVEL ONE – NORMAL SWITCHGEAR UTILITY TUNNEL BELOW CRAWL SPACE SERVICE ROAD Figure 2: The hospital building at Queen’s Medical Center in Honolulu is designed in four levels, each able to withstand a Category 5 hurricane and seismic activity. 36 Consulting-Specifying Engineer • JUNE 2008
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - June 2008 Consulting-Specifying Engineer - June 2008 Contents Viewpoint Letters News M/E Roundtable No Gambling Allowed on Smoke Control in Las Vegas Be Prepared: Hospital Protections for Catastrophic Events Ready for Retail Commissioning Documents: Necessary Evil Codes & Standards Codes & Standards Case Study Equipment Lifecycles New Products Advertiser Index Green Space Consulting-Specifying Engineer - June 2008 Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page Cover1) Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page Cover2) Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page 1) Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page 2) Consulting-Specifying Engineer - June 2008 - Contents (Page 3) Consulting-Specifying Engineer - June 2008 - Contents (Page 4) Consulting-Specifying Engineer - June 2008 - Contents (Page 5) Consulting-Specifying Engineer - June 2008 - Contents (Page 6) Consulting-Specifying Engineer - June 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - June 2008 - Viewpoint (Page 8) Consulting-Specifying Engineer - June 2008 - Viewpoint (Page 9) Consulting-Specifying Engineer - June 2008 - Letters (Page 10) Consulting-Specifying Engineer - June 2008 - Letters (Page 11) Consulting-Specifying Engineer - June 2008 - News (Page 12) Consulting-Specifying Engineer - June 2008 - News (Page 13) Consulting-Specifying Engineer - June 2008 - News (Page 14) Consulting-Specifying Engineer - June 2008 - News (Page 15) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 24) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 25) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 26) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 27) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 28) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 29) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 30) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 31) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 32) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 33) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 34) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 35) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 36) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 37) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 38) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 39) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 40) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 41) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 42) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 43) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 44) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 45) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 46) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 47) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 48) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 49) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 50) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 51) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 52) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 53) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 54) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 55) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 56) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 57) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 58) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 59) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 60) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 61) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 62) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 63) Consulting-Specifying Engineer - June 2008 - Case Study (Page 64) Consulting-Specifying Engineer - June 2008 - Case Study (Page 64a) Consulting-Specifying Engineer - June 2008 - Case Study (Page 64b) Consulting-Specifying Engineer - June 2008 - Case Study (Page 65) Consulting-Specifying Engineer - June 2008 - Case Study (Page 66) Consulting-Specifying Engineer - June 2008 - Equipment Lifecycles (Page 67) Consulting-Specifying Engineer - June 2008 - Equipment Lifecycles (Page 68) Consulting-Specifying Engineer - June 2008 - Equipment Lifecycles (Page 69) Consulting-Specifying Engineer - June 2008 - New Products (Page 70) Consulting-Specifying Engineer - June 2008 - New Products (Page 71) Consulting-Specifying Engineer - June 2008 - New Products (Page 72) Consulting-Specifying Engineer - June 2008 - New Products (Page 73) Consulting-Specifying Engineer - June 2008 - New Products (Page 74) Consulting-Specifying Engineer - June 2008 - New Products (Page 75) Consulting-Specifying Engineer - June 2008 - New Products (Page 76) Consulting-Specifying Engineer - June 2008 - New Products (Page 77) Consulting-Specifying Engineer - June 2008 - New Products (Page 78) Consulting-Specifying Engineer - June 2008 - Advertiser Index (Page 79) Consulting-Specifying Engineer - June 2008 - Green Space (Page 80) Consulting-Specifying Engineer - June 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - June 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.