Consulting-Specifying Engineer - June 2008 - (Page 53) owner and design team shall be responsible for updates to their respective documents.” The SM, which is required for the LEED NC 2.2 Enhanced Commissioning Credit, is compiled by the CxA. As explained in the LEED Reference Manual, however, most of the document’s contents are provided by the owner, design team, and contractors. The project team has to be prepared to share in the development and use of the OPR, BOD, and SM. The contracts must support this effort, and the owner’s staff has to be prepared for participation. With advanced preparation, however, this does not necessarily require a substantial increase in fees or project schedule. Much of the content of the OPR, BOD, and SM must be known or created as a normal part of project development. A project team that understands the purpose and development of the documents can create them as a part of work already being done. In order to efficiently develop and use the OPR, BOD, and SM, the project team must understand how the documents support and build on one another. The OPR is the foundation on which the BOD is built, and the SM incorporates and builds on the OPR and BOD. More about OPR The OPR and BOD are first and foremost design tools; however, many commissioning experts consider the OPR to be the project’s commissioning bible. Though many commissioning definitions and goals have been published, many experts believe they all boil down to this simple concept: The fundamental purpose of building commissioning is to confirm that the commissioned systems satisfy the owner’s functional requirements. It stands to reason then, that throughout the project the entire project team should have a common understanding of what those functional requirements are and how the success of their implementation will be judged. The purpose of the OPR is to document this. Though the purpose of the OPR may be simple in concept, the value of documenting the owner’s functional requirements With advanced preparation, OPR, BOD, and SM will not necessarily require a substantial increase in fees or project schedule. VFD-Induced Shaft Current Kills Motor Bearings! BEARING PROTECTION RING Guaranteed to Protect Bearings for Life! For motors up to 100 HP / 75 kw, AEGIS SGR’s patented technology is guaranteed to protect bearings against electrical fluting damage for the life of your motor. The AEGIS Bearing Protection Ring™ extends motor life and increases system reliability. To download a free technical paper on bearing protection technologies, visit our website: 1-866-738-1857 | sales@est-aegis.com | www.est-aegis.com/cse1 Input #229 at csemag.com/quickResponse http://www.est-aegis.com/cse1 http://www.est-aegis.com/cse1 http://www.est-aegis.com/cse1 http://csemag.com/quickResponse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - June 2008 Consulting-Specifying Engineer - June 2008 Contents Viewpoint Letters News M/E Roundtable No Gambling Allowed on Smoke Control in Las Vegas Be Prepared: Hospital Protections for Catastrophic Events Ready for Retail Commissioning Documents: Necessary Evil Codes & Standards Codes & Standards Case Study Equipment Lifecycles New Products Advertiser Index Green Space Consulting-Specifying Engineer - June 2008 Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page Cover1) Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page Cover2) Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page 1) Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page 2) Consulting-Specifying Engineer - June 2008 - Contents (Page 3) Consulting-Specifying Engineer - June 2008 - Contents (Page 4) Consulting-Specifying Engineer - June 2008 - Contents (Page 5) Consulting-Specifying Engineer - June 2008 - Contents (Page 6) Consulting-Specifying Engineer - June 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - June 2008 - Viewpoint (Page 8) Consulting-Specifying Engineer - June 2008 - Viewpoint (Page 9) Consulting-Specifying Engineer - June 2008 - Letters (Page 10) Consulting-Specifying Engineer - June 2008 - Letters (Page 11) Consulting-Specifying Engineer - June 2008 - News (Page 12) Consulting-Specifying Engineer - June 2008 - News (Page 13) Consulting-Specifying Engineer - June 2008 - News (Page 14) Consulting-Specifying Engineer - June 2008 - News (Page 15) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 24) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 25) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 26) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 27) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 28) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 29) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 30) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 31) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 32) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 33) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 34) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 35) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 36) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 37) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 38) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 39) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 40) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 41) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 42) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 43) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 44) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 45) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 46) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 47) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 48) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 49) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 50) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 51) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 52) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 53) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 54) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 55) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 56) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 57) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 58) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 59) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 60) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 61) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 62) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 63) Consulting-Specifying Engineer - June 2008 - Case Study (Page 64) Consulting-Specifying Engineer - June 2008 - Case Study (Page 64a) Consulting-Specifying Engineer - June 2008 - Case Study (Page 64b) Consulting-Specifying Engineer - June 2008 - Case Study (Page 65) Consulting-Specifying Engineer - June 2008 - Case Study (Page 66) Consulting-Specifying Engineer - June 2008 - Equipment Lifecycles (Page 67) Consulting-Specifying Engineer - June 2008 - Equipment Lifecycles (Page 68) Consulting-Specifying Engineer - June 2008 - Equipment Lifecycles (Page 69) Consulting-Specifying Engineer - June 2008 - New Products (Page 70) Consulting-Specifying Engineer - June 2008 - New Products (Page 71) Consulting-Specifying Engineer - June 2008 - New Products (Page 72) Consulting-Specifying Engineer - June 2008 - New Products (Page 73) Consulting-Specifying Engineer - June 2008 - New Products (Page 74) Consulting-Specifying Engineer - June 2008 - New Products (Page 75) Consulting-Specifying Engineer - June 2008 - New Products (Page 76) Consulting-Specifying Engineer - June 2008 - New Products (Page 77) Consulting-Specifying Engineer - June 2008 - New Products (Page 78) Consulting-Specifying Engineer - June 2008 - Advertiser Index (Page 79) Consulting-Specifying Engineer - June 2008 - Green Space (Page 80) Consulting-Specifying Engineer - June 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - June 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.