Consulting-Specifying Engineer - June 2008 - (Page 68) Equipment Lifecycles Conference room layout Plan view Occupancy sensor PP J S Power pack Junction box Wall switch Low voltage wiring Line voltage wiring Wallwash luminaire Pendant luminaire Dual-technology sensors use both PIR and ultrasonic technologies and keep lighting on as long as one of the technologies detects occupancy. Dual technology sensors are recommended for hard-to-control spaces such as large offices, conference rooms, and classrooms where occupants may be relatively still. Coverage patterns Occupancy sensors are available in a wide variety of coverage patterns of various shapes and sizes. To select a pattern that is the best fit for the application, consider the shape and dimensions of the space, not simply the square footage. Additionally, select sensors that have been tested to confirm coverage of both major and minor motions as prescribed in NEMA Guide Publication WD 7-2000. Sensor layout should facilitate detection of the type of motion anticipated in the space; in many workspaces small motions must be detected to ensure proper operation. Position the sensors above, or close to, the main areas of activity and then add sensors as needed to provide complete coverage. In small offices and spaces up to 12x12 ft, wall switch sensors often work well if the activity can be sensed from the switchbox location. Beware of switchboxes behind doors or in vestibules where sensors might not be able to properly sense the controlled area. In many cases, ceiling sensors will provide the best coverage for the space. When multiple sensors are used, place them so that the coverage patterns overlap slightly. Remember to consider the ceiling height, as this will affect the area that will be covered. Create zones controlled by different groups of sensors to manage lighting in large areas; check energy code requirements when determining zone sizes. c Whiteboard a,b c a,b J Sa Sb Sc PP Isolated relay output to BAS or HVAC system Section Luminaire power wiring J-Box Power pack and J-box above ceiling J-Box PP Low voltage wiring to occupancy sensor Low voltage wiring to power pack Low voltage isolated relay wiring to BAS or HVAC Mount occupancy sensor at same height as bottom of luminaire so sensor's view of room is not blocked Occupancy sensor Wall switch for manual control At the top, the occupancy sensor is positioned in the corner where it has a clear view of the activity in the room, but does not see activity in the adjacent hallway. It is mounted below the ceiling so that the suspended lighting fixtures do not block its view. In the lower image, wall switches provide manual control of the individual lighting loads. Source: Watt Stopper/Legrand 68 Consulting-Specifying Engineer • JUNE 2008
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - June 2008 Consulting-Specifying Engineer - June 2008 Contents Viewpoint Letters News M/E Roundtable No Gambling Allowed on Smoke Control in Las Vegas Be Prepared: Hospital Protections for Catastrophic Events Ready for Retail Commissioning Documents: Necessary Evil Codes & Standards Codes & Standards Case Study Equipment Lifecycles New Products Advertiser Index Green Space Consulting-Specifying Engineer - June 2008 Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page Cover1) Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page Cover2) Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page 1) Consulting-Specifying Engineer - June 2008 - Consulting-Specifying Engineer - June 2008 (Page 2) Consulting-Specifying Engineer - June 2008 - Contents (Page 3) Consulting-Specifying Engineer - June 2008 - Contents (Page 4) Consulting-Specifying Engineer - June 2008 - Contents (Page 5) Consulting-Specifying Engineer - June 2008 - Contents (Page 6) Consulting-Specifying Engineer - June 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - June 2008 - Viewpoint (Page 8) Consulting-Specifying Engineer - June 2008 - Viewpoint (Page 9) Consulting-Specifying Engineer - June 2008 - Letters (Page 10) Consulting-Specifying Engineer - June 2008 - Letters (Page 11) Consulting-Specifying Engineer - June 2008 - News (Page 12) Consulting-Specifying Engineer - June 2008 - News (Page 13) Consulting-Specifying Engineer - June 2008 - News (Page 14) Consulting-Specifying Engineer - June 2008 - News (Page 15) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - June 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 24) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 25) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 26) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 27) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 28) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 29) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 30) Consulting-Specifying Engineer - June 2008 - No Gambling Allowed on Smoke Control in Las Vegas (Page 31) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 32) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 33) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 34) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 35) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 36) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 37) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 38) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 39) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 40) Consulting-Specifying Engineer - June 2008 - Be Prepared: Hospital Protections for Catastrophic Events (Page 41) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 42) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 43) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 44) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 45) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 46) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 47) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 48) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 49) Consulting-Specifying Engineer - June 2008 - Ready for Retail (Page 50) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 51) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 52) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 53) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 54) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 55) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 56) Consulting-Specifying Engineer - June 2008 - Commissioning Documents: Necessary Evil (Page 57) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 58) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 59) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 60) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 61) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 62) Consulting-Specifying Engineer - June 2008 - Codes & Standards (Page 63) Consulting-Specifying Engineer - June 2008 - Case Study (Page 64) Consulting-Specifying Engineer - June 2008 - Case Study (Page 64a) Consulting-Specifying Engineer - June 2008 - Case Study (Page 64b) Consulting-Specifying Engineer - June 2008 - Case Study (Page 65) Consulting-Specifying Engineer - June 2008 - Case Study (Page 66) Consulting-Specifying Engineer - June 2008 - Equipment Lifecycles (Page 67) Consulting-Specifying Engineer - June 2008 - Equipment Lifecycles (Page 68) Consulting-Specifying Engineer - June 2008 - Equipment Lifecycles (Page 69) Consulting-Specifying Engineer - June 2008 - New Products (Page 70) Consulting-Specifying Engineer - June 2008 - New Products (Page 71) Consulting-Specifying Engineer - June 2008 - New Products (Page 72) Consulting-Specifying Engineer - June 2008 - New Products (Page 73) Consulting-Specifying Engineer - June 2008 - New Products (Page 74) Consulting-Specifying Engineer - June 2008 - New Products (Page 75) Consulting-Specifying Engineer - June 2008 - New Products (Page 76) Consulting-Specifying Engineer - June 2008 - New Products (Page 77) Consulting-Specifying Engineer - June 2008 - New Products (Page 78) Consulting-Specifying Engineer - June 2008 - Advertiser Index (Page 79) Consulting-Specifying Engineer - June 2008 - Green Space (Page 80) Consulting-Specifying Engineer - June 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - June 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.