Consulting-Specifying Engineer - July 2008 - (Page 12) M/E Roundtable Technology is power This month’s panel discusses on-site power, with regard to power generation, PARTICIPANTS new designs, and renewable technologies. BY MELISSA HILLEBRAND, Associate Editor The client desires a USGBC LEED rating and CSE : How are facility administrators focusing on issues of on-site power generation and distributed generation? obtains LEED points for “on-site generation,” and the heat generated by the system is recovered and used to pre-heat a large boiler. In this case, the client meets technical and reliability demands, corporate goals, and might see a fiveyear ROI. CSE: What are the most promising technologies and strategies for on-site primary power generation? KUPPINGER: Technologies like fuel cells, wind turbines, and photovoltaics are becoming more popular for small kilowatt loads and achieving longer term ROIs. The ability to scale up the systems to service even a small office building usually is not feasible, as the systems require large spaces and become complex. Natural gas and diesel generators are the vast majority of larger on-site generation projects that get built. One new technology is the use of bio-fuel for generators that move this age-old design toward a more sustainable solution. KEN LOVORN: While solar, photovoltaic cells have some clear advantages from the environmentalists’ perspective, there is a conflict between the cleaning of the environment due to the increased use of these cells and the increase in pollution created by the greater production of solar cells. The rare earth elements required for the operation of photovoltaic cells are some of the most toxic elements in the world, and containing these pollutants is a major concern. Wind turbines have a lot of potential but, again, the environmentalists who are in favor of Thomas F. Flickinger PE, CSI Principal, VP–Director of Electrical Engineering Durrant Madison, Wis. Michael Kuppinger, PE Senior Vice President– Mission Critical Facilities and Technology Environmental Systems Design Inc. Chicago THOMAS FLICKINGER: Obviously, financial incentives play a large part in most of their decisions. If funding is readily available, then distributed power (microturbines, fuel cells, photovoltaics, and wind turbines) can be considered. If facility administrators have to rely solely on the distributed power system economic payback (sans rebates), then alternate power sources become less viable and certainly more of a challenge. For more information regarding available rebates for a given state, go to www.dsireusa .org. This is a noncommercial database, which appears to be routinely updated with the latest state and federal initiatives. MICHAEL KUPPINGER: The drivers for facility administrators going to on-site power generation, often referred to as “distributed power,” are specific trends and factors, the priority of which is as follows: 1. Reliability and availability of power for mission-critical operations, like a data center, call center, or healthcare facility; 2. Federal or other regulations like the SEC requirements for on-site emergency power; 3. Sustainable design and LEED goals, such as the ability to use “heat recovery” systems or meet other energy goals; and 4. Sufficient power in remote areas where electricity demands can not be otherwise met. The return on investment (ROI) for the initial capital cost of on-site generation is very difficult to achieve and usually takes several of the stated factors. For example, a 24/7 data center requires a generator. Ken Lovorn, PE President, Chief Engineer Lovorn Engineering Pittsburgh 12 Consulting-Specifying Engineer • JULY 2008 http://www.dsireusa.org http://www.dsireusa.org
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - July 2008 Consulting-Specifying Engineer - July 2008 Contents Viewpoint Letters News M/E Roundtable 40 Under 40 Using Demand-Based Reset Strategies VFDs and Motors: Making the Right Match Grounding and Bonding Practices for Hazardous Areas Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - July 2008 Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page Cover1) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page Cover2) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page 1) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page 2) Consulting-Specifying Engineer - July 2008 - Contents (Page 3) Consulting-Specifying Engineer - July 2008 - Contents (Page 4) Consulting-Specifying Engineer - July 2008 - Contents (Page 5) Consulting-Specifying Engineer - July 2008 - Contents (Page 6) Consulting-Specifying Engineer - July 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - July 2008 - Letters (Page 8) Consulting-Specifying Engineer - July 2008 - Letters (Page 9) Consulting-Specifying Engineer - July 2008 - News (Page 10) Consulting-Specifying Engineer - July 2008 - News (Page 11) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 12) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 13) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 17) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 18) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 19) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 20) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 21) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 22) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 23) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 24) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 25) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 26) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 27) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 28) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 29) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 30) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 31) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 32) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 33) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 34) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 35) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 36) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 37) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 38) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 39) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 40) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 41) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 42) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 43) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 44) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 45) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 46) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 47) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 48) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 49) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 50) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 51) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52A) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52B) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 53) Consulting-Specifying Engineer - July 2008 - Codes & Standards (Page 54) Consulting-Specifying Engineer - July 2008 - Codes & Standards (Page 55) Consulting-Specifying Engineer - July 2008 - Case Study (Page 56) Consulting-Specifying Engineer - July 2008 - Case Study (Page 57) Consulting-Specifying Engineer - July 2008 - New Products (Page 58) Consulting-Specifying Engineer - July 2008 - New Products (Page 59) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 66) Consulting-Specifying Engineer - July 2008 - Advertiser Index (Page 67) Consulting-Specifying Engineer - July 2008 - Green Space (Page 68) Consulting-Specifying Engineer - July 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - July 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.