Consulting-Specifying Engineer - July 2008 - (Page 16) M/E Roundtable integrated package. KUPPINGER: I touched on it above and can expand, but basically the systems require valuable space that does not obtain monthly rent, and the capital cost of these systems causes ROIs that far exceed what typical class “A” or “B” developers will invest in or tenants will pay for. CSE: How are current codes, standards, and environmental impact issues affecting the implementation of on-site power strategies? FLICKINGER: One would presume with the enactment of EPACT 2005, where net metering was mandated, there would have been a proliferation of alternative energy sources. However, this not the case; the complexity and definition of “net metering” as regulated by individual state and public utility boards is a challenge. EPA has enacted more stringent air quality standards for diesel generators. As the generators are required to be Tier 4 by 2011, there will be fewer economically viable opportunities for this type of generator, particularly for “base loaded” applications. KUPPINGER: There was a code change in Illinois and a past client, UBS, was required to provide an air-sampling system and increase the level of diesel fuel monitoring and alarm. CSE: How is the current utility environment affecting the implementation of on-site power systems? KUPPINGER: Utility companies have traditionally not allowed the direct connection of on-site generation equipment to their electrical grid. On-site generation typically is not connected to the grid and requires a short “outage.” The primary reason the utility did not allow direct connection or “closed transition” of on-site generation into the grid is that problems on the customer equipment could cause an outage to the entire area. We have seen this happen on the East Coast a few years back, when the operations of a single utility plant caused the surrounding grid to become unstable and ultimately fail. The IEEE has developed improved standards, and pressure from multiple areas has forced utility companies to be more accommodating. Closed transition requires sophisticated switch gear, power breakers, and relay systems that were expensive and caused risk concerns. Input #210 at csemag.com/quickResponse http://www.uecorp.com http://www.uecorp.com http://csemag.com/quickResponse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - July 2008 Consulting-Specifying Engineer - July 2008 Contents Viewpoint Letters News M/E Roundtable 40 Under 40 Using Demand-Based Reset Strategies VFDs and Motors: Making the Right Match Grounding and Bonding Practices for Hazardous Areas Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - July 2008 Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page Cover1) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page Cover2) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page 1) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page 2) Consulting-Specifying Engineer - July 2008 - Contents (Page 3) Consulting-Specifying Engineer - July 2008 - Contents (Page 4) Consulting-Specifying Engineer - July 2008 - Contents (Page 5) Consulting-Specifying Engineer - July 2008 - Contents (Page 6) Consulting-Specifying Engineer - July 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - July 2008 - Letters (Page 8) Consulting-Specifying Engineer - July 2008 - Letters (Page 9) Consulting-Specifying Engineer - July 2008 - News (Page 10) Consulting-Specifying Engineer - July 2008 - News (Page 11) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 12) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 13) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 17) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 18) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 19) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 20) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 21) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 22) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 23) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 24) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 25) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 26) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 27) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 28) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 29) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 30) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 31) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 32) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 33) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 34) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 35) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 36) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 37) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 38) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 39) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 40) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 41) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 42) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 43) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 44) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 45) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 46) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 47) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 48) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 49) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 50) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 51) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52A) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52B) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 53) Consulting-Specifying Engineer - July 2008 - Codes & Standards (Page 54) Consulting-Specifying Engineer - July 2008 - Codes & Standards (Page 55) Consulting-Specifying Engineer - July 2008 - Case Study (Page 56) Consulting-Specifying Engineer - July 2008 - Case Study (Page 57) Consulting-Specifying Engineer - July 2008 - New Products (Page 58) Consulting-Specifying Engineer - July 2008 - New Products (Page 59) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 66) Consulting-Specifying Engineer - July 2008 - Advertiser Index (Page 67) Consulting-Specifying Engineer - July 2008 - Green Space (Page 68) Consulting-Specifying Engineer - July 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - July 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.