Consulting-Specifying Engineer - July 2008 - (Page 51) current that may be imposed. If not, an improperly sized grounding conductor will overheat, and its insulation and the insulation on the phase conductors may deteriorate over time. Finally, the fault current return path must have a sufficiently low impedance from the source of the fault back to the power supply. This limits the voltage to ground so the overcurrent protective device operates quickly and prevents damage to equipment, eliminating a shock hazard to personnel. Connections It is critical in both hazardous and nonhazardous areas that the protective device operates quickly. The amount of fault current that flows through the circuit and the time/current characteristics determine a protective device’s operating speed. Based on Ohm’s Law, how much current will flow is determined by the impedance between where the fault occurs and the source of power, hence the requirement for a low impedance path. If the equipment grounding conductor is not run in the same raceway as the phase conductors, if there is a loose or rusted connection, or if an improperly bonded conduit is present, the impedance of the fault return path will increase. If a fault occurred under any of these conditions, the impedance of the ground fault return path may have increased and the fuse or circuit breaker will take too long to open or will not open at all. This may result in the fault continuing to burn and may develop into an ignition source if within a hazardous location (see Figure 1). Thus, proper equipment grounding within hazardous areas becomes even more important than in nonhazardous locations. All of these requirements for the EGC are for personnel safety and, in the case of hazardous areas, can prevent an arc or spark from reaching the hazardous atmosphere. Additionally, the arc flash level and associated personal protective gear can be affected by the length of time required to open 50 amp CB 0.2 ohm (wire) Z1 Load being served V = 120 V 0.2 ohm (wire) Z2 50 amp CB 0.2 ohm (wire) Z1 Load being served V = 120 V 1 ohm Z5 1 ohm Z4 1 ohm Z3 0.2 ohm (wire) Z2 Figure 1: Sample calculations based on Ohm’s Law show that 50 amps are required to open the protective device. The top scenario shows a proper equipment grounding, as 300 amps are produced. In the bottom scenario, due to a small amount of impedance, there is a limited amount of fault current that prevents the protective device from clearing a fault. The bottom scenario shows that only 35.3 amps are produced. Source: Interstates Engineering an overcurrent protective device during a ground fault event. What must we consider “above and beyond” normal grounding and bonding in hazardous locations? In hazardous locations previously defined, all potentially conductive equipment, raceways, and other enclosures connected by permanent wiring methods—regardless of voltage—must be bonded by one or more of the following methods according to NEC Article 250.92: • Exothermic welding • Listed pressure connectors • Listed clamps • Threaded couplings or threaded bosses with the wrench installed tightly • Threadless couplings and connectors installed tightly for metal raceways and metal-clad cables • Other listed means such as bonding- type locknuts, bushings, or bushings with bonding jumpers. This must be done for motors, raceway, junction boxes, liquid-tight flexible connections, lights, receptacles, PLCs, motor control centers, and similar devices so that the removal of any equipment does not interfere with or interrupt the grounding continuity. In hazardous classified locations, all equipment must be grounded and bonded as specified in NEC Article 250. However, do not depend on locknut bushings and double locknuts for bonding raceways to enclosures. A bonding locknut with a bonding jumper, threaded bosses, or other listed means must be installed at any point on the conduit system from the hazardous location back to the source of power (see Figure 2). In hazardous classified locations, liquid- Consulting-Specifying Engineer • JULY 2008 51
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - July 2008 Consulting-Specifying Engineer - July 2008 Contents Viewpoint Letters News M/E Roundtable 40 Under 40 Using Demand-Based Reset Strategies VFDs and Motors: Making the Right Match Grounding and Bonding Practices for Hazardous Areas Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - July 2008 Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page Cover1) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page Cover2) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page 1) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page 2) Consulting-Specifying Engineer - July 2008 - Contents (Page 3) Consulting-Specifying Engineer - July 2008 - Contents (Page 4) Consulting-Specifying Engineer - July 2008 - Contents (Page 5) Consulting-Specifying Engineer - July 2008 - Contents (Page 6) Consulting-Specifying Engineer - July 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - July 2008 - Letters (Page 8) Consulting-Specifying Engineer - July 2008 - Letters (Page 9) Consulting-Specifying Engineer - July 2008 - News (Page 10) Consulting-Specifying Engineer - July 2008 - News (Page 11) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 12) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 13) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 17) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 18) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 19) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 20) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 21) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 22) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 23) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 24) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 25) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 26) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 27) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 28) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 29) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 30) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 31) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 32) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 33) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 34) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 35) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 36) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 37) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 38) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 39) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 40) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 41) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 42) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 43) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 44) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 45) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 46) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 47) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 48) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 49) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 50) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 51) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52A) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52B) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 53) Consulting-Specifying Engineer - July 2008 - Codes & Standards (Page 54) Consulting-Specifying Engineer - July 2008 - Codes & Standards (Page 55) Consulting-Specifying Engineer - July 2008 - Case Study (Page 56) Consulting-Specifying Engineer - July 2008 - Case Study (Page 57) Consulting-Specifying Engineer - July 2008 - New Products (Page 58) Consulting-Specifying Engineer - July 2008 - New Products (Page 59) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 66) Consulting-Specifying Engineer - July 2008 - Advertiser Index (Page 67) Consulting-Specifying Engineer - July 2008 - Green Space (Page 68) Consulting-Specifying Engineer - July 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - July 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.