Consulting-Specifying Engineer - July 2008 - (Page 56) Case Study New fire system for Old West AT A GLANCE ocated northwest of downtown Tulsa, Okla., the Gilcrease Museum is one of the country’s most comprehensive facilities for the preservation and study of American art and history. Drawing thousands of visitors from around the world for a glimpse into the past, the Gilcrease Museum houses the world’s largest collection of art and artifacts of the American West. Several years ago, museum officials were applying for museum re-accreditation. The museum’s insurer, as well as the Smithsonian Institution, which certifies many of the museum’s exhibits for authenticity, requires reaccreditation. As part of the process, officials determined that the museum’s existing fire protection system was insufficient, lacking the reliability that the insurer required. In addition, the system did not comply with the 2003 International Building Code and NFPA 72. A new fire protection system would have to be installed. Because the museum is a department of the City of Tulsa, the museum was required, like all other city and state agencies, to secure a number of bids for the job. The museum chose to go with the bid from Mac Systems, an Oklahoma supplier of fire detection, alarm, and suppression, as well as facility communications and security systems. L The Gilcrease Museum, Tulsa, Okla., houses one of the country’s largest collections of American West and Native American art. Photo: Gilcrease Museum The Gilcrease Museum needed a new fire protection system as part of its reaccreditation process and to meet insurer standards. The museum chose the NFS2-3030 panel with six signaling line circuits, part of the ONYX series from Notifier. NFS2-3030 provides as many as 159 detectors and 169 modules per signaling line circuit. UniNet 2000 interfaces with the system. This network allows users to monitor and control security, fire, card access, CCTV, and other facility information. The Gilcrease Museum installation was completed in nine months. After careful deliberation, the museum and Mac Systems chose the NFS2-3030 panel with six signaling line circuits (SLCs) and a UniNet Interface as the heart of the system. The NFS2-3030 is part of the ONYX series, a patented intelligent sensing technology that delivers rapid, intelligent response to incipient fire signatures while reducing nuisance alarms. An intelligent fire alarm control panel designed for medium- to large-scale facilities, the NFS2-3030 is ideal for most applications due to its modular design and can be configured to a project’s unique requirements. Offering as many as 10 SLCs, the NFS2-3030 supports up to three devices offering 180 intelligent addressable configurations each. In addition, the panel’s large 640-character LCD screen presents information to operators concerning a fire situation, fire progression, and evacuation details. A maximum of 159 detectors (any mix of ion, photo, laser photo, thermal, or multi-sensor) and 159 modules (normally open manual stations, two-wire smoke, notification, or relay) per SLC can be integrated with the system. The Gilcrease Museum needed the system’s ability to handle such a large number of detectors and other appliances, given the following installations: • 10 remote power supplies To protect its famed collections, the Gilcrease Museum installation was expansive. Included in the installation: 26 intelligent heat detectors, 259 laser smoke detectors, 30 intelligent smoke detectors, and 28 addressable manual pull stations. Photo: Gilcrease Museum 56 Consulting-Specifying Engineer • JULY 2008
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - July 2008 Consulting-Specifying Engineer - July 2008 Contents Viewpoint Letters News M/E Roundtable 40 Under 40 Using Demand-Based Reset Strategies VFDs and Motors: Making the Right Match Grounding and Bonding Practices for Hazardous Areas Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - July 2008 Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page Cover1) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page Cover2) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page 1) Consulting-Specifying Engineer - July 2008 - Consulting-Specifying Engineer - July 2008 (Page 2) Consulting-Specifying Engineer - July 2008 - Contents (Page 3) Consulting-Specifying Engineer - July 2008 - Contents (Page 4) Consulting-Specifying Engineer - July 2008 - Contents (Page 5) Consulting-Specifying Engineer - July 2008 - Contents (Page 6) Consulting-Specifying Engineer - July 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - July 2008 - Letters (Page 8) Consulting-Specifying Engineer - July 2008 - Letters (Page 9) Consulting-Specifying Engineer - July 2008 - News (Page 10) Consulting-Specifying Engineer - July 2008 - News (Page 11) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 12) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 13) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - July 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 17) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 18) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 19) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 20) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 21) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 22) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 23) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 24) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 25) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 26) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 27) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 28) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 29) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 30) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 31) Consulting-Specifying Engineer - July 2008 - 40 Under 40 (Page 32) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 33) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 34) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 35) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 36) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 37) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 38) Consulting-Specifying Engineer - July 2008 - Using Demand-Based Reset Strategies (Page 39) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 40) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 41) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 42) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 43) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 44) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 45) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 46) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 47) Consulting-Specifying Engineer - July 2008 - VFDs and Motors: Making the Right Match (Page 48) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 49) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 50) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 51) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52A) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 52B) Consulting-Specifying Engineer - July 2008 - Grounding and Bonding Practices for Hazardous Areas (Page 53) Consulting-Specifying Engineer - July 2008 - Codes & Standards (Page 54) Consulting-Specifying Engineer - July 2008 - Codes & Standards (Page 55) Consulting-Specifying Engineer - July 2008 - Case Study (Page 56) Consulting-Specifying Engineer - July 2008 - Case Study (Page 57) Consulting-Specifying Engineer - July 2008 - New Products (Page 58) Consulting-Specifying Engineer - July 2008 - New Products (Page 59) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - July 2008 - Equipment Lifecycles (Page 66) Consulting-Specifying Engineer - July 2008 - Advertiser Index (Page 67) Consulting-Specifying Engineer - July 2008 - Green Space (Page 68) Consulting-Specifying Engineer - July 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - July 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.