Consulting-Specifying Engineer - August 2007 - (Page 17) M/E Roundtable FIRE & LIFE SAFETY Integrating fire protection, security BY MELISSA HILLEBRAND, Associate Editor Casamassima Grill Giannini Convery Participants Mario Casamassima V.P. of Engineering, Gamewell-FCI, Northford, Conn. James J. Convery, P.E., CPP Project Director, Schirmer Engineering of New York, White Plains, N.Y. Tom Giannini, CPP Director, Security Marketing, SimplexGrinnell, Westminster, Mass. Ray Grill, P.E., FSFPE President, Society of Fire Protection Engineers, Bethesda, Md. T h i s m o n t h’s p a n e l d i s c u s s e s t h e c h a l l e n g e s e n g i n e e r s f a c e integrating fire alarm and security systems, and provides practical solutions. plines during installation. If the responsibilities of each contractor are not clear, this can lead to inoperable systems or cost overruns. If a building system is installed that requires AC power to operate and the power has not been coordinated, the installation of power over and through sensitive equipment may not be optimal and costly. CSE: How are sequences of operation for integrated fire/security systems written and tested? GRILL: Defining the sequence of operation for integrated fire/security systems can be very complex depending on the occupancy and owner requirements. In most occupancies, fire has been—and I believe will continue to be— No. 1 priority over security signals. In the 2007 edition of NFPA 72, the new Annex information on mass notification systems indicates that priorities of messages should be based on the nature of the message to be administered. The committee recognizes that there may be instances where a fire alarm may not be the highest priority in some circumstances. The development of a sequence of operation should take into consideration management policies in complex facilities. (Continued on page 19) Consulting-Specifying Engineer • AUGUST, 2007 CSE: What integration snafus have you seen in the field and how were they fixed? CASAMASSIMA: 1) Running out of node capacity within a network. Solution was to divide the system into two independent networks and utilize a global monitoring station. 2) Adding voice evacuation after the fact. Make sure that the specified system is capable of supporting audio without major network wiring changes. 3) Major application changes required nearing the end of the project. Make sure the specified system can be field programmed and it includes some type of Boolean control script language that can be used to address those changes. GIANNINI: Most of the problems I have seen involve systems that do not have the capability to be integrated to other systems. The preplanning for systems integration needs to be performed by skilled integrators who understand the various communication protocols and application hierarchies of the platforms to be integrated. Many times the systems are never truly integrated, but rather managed from a single location. This scenario still provides a degree of control, but not to the level of a truly integrated system. CONVERY: Field coordination between disci- 17
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - August 2007 Contents M/E Roundtable Giants 100 Pullout Poster Giants Stand Tall: CSE Giants 100 Report Electrical Design for Tall Buildings HVAC and Fire Safety for Elevator Systems How to Beat the Codes GAS Technology Supplement Recovering Waste Heat from Boilers New Applications for Tankless Water Heating Systmes Techniques Improve for Powder Coating MDF New Tools Available for Heat Treating Steel Direct Drive Engines Consulting-Specifying Engineer - August 2007 Consulting-Specifying Engineer - August 2007 - (Page Cover1) Consulting-Specifying Engineer - August 2007 - (Page Cover2) Consulting-Specifying Engineer - August 2007 - (Page 1) Consulting-Specifying Engineer - August 2007 - (Page 2) Consulting-Specifying Engineer - August 2007 - Contents (Page 3) Consulting-Specifying Engineer - August 2007 - Contents (Page 4) Consulting-Specifying Engineer - August 2007 - Contents (Page 5) Consulting-Specifying Engineer - August 2007 - Contents (Page 6) Consulting-Specifying Engineer - August 2007 - Contents (Page 7) Consulting-Specifying Engineer - August 2007 - Contents (Page 8) Consulting-Specifying Engineer - August 2007 - Contents (Page 9) Consulting-Specifying Engineer - August 2007 - Contents (Page 10) Consulting-Specifying Engineer - August 2007 - Contents (Page 11) Consulting-Specifying Engineer - August 2007 - Contents (Page 12) Consulting-Specifying Engineer - August 2007 - Contents (Page 13) Consulting-Specifying Engineer - August 2007 - Contents (Page 14) Consulting-Specifying Engineer - August 2007 - Contents (Page 15) Consulting-Specifying Engineer - August 2007 - Contents (Page 16) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 24) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24A) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24B) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24C) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24D) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24E) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24F) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24G) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24H) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24I) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24J) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24K) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24L) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24M) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24N) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 25) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 26) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 27) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 28) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 29) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 30) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 31) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 32) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 33) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 34) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 35) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 36) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 37) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 38) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 39) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 40) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 41) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 42) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 43) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 44) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 45) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 46) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 47) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 48) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 49) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 50) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 51) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 52) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 53) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 54) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 55) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 56) Consulting-Specifying Engineer - August 2007 - GAS Technology Supplement (Page A1) Consulting-Specifying Engineer - August 2007 - Recovering Waste Heat from Boilers (Page A2) Consulting-Specifying Engineer - August 2007 - Recovering Waste Heat from Boilers (Page A3) Consulting-Specifying Engineer - August 2007 - Recovering Waste Heat from Boilers (Page A4) Consulting-Specifying Engineer - August 2007 - New Applications for Tankless Water Heating Systmes (Page A5) Consulting-Specifying Engineer - August 2007 - Techniques Improve for Powder Coating MDF (Page A6) Consulting-Specifying Engineer - August 2007 - Techniques Improve for Powder Coating MDF (Page A7) Consulting-Specifying Engineer - August 2007 - New Tools Available for Heat Treating Steel (Page A8) Consulting-Specifying Engineer - August 2007 - New Tools Available for Heat Treating Steel (Page A9) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page A10) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page A11) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page A12) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page Cover3) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.